WATERFRONT REPAIRS, U. S. COAST GUARD STATION FORT LAUDERDALE, FLORIDA
Solicitation number
HSCG82-11-B-PMVA01
Issued by

About this file

AMENDMENT 001

Text of this file

AMENDMENT 001

HSCG82-11-B-PMVA01

SCOPE OF WORK

AMENDMENT TO SPECIFICATIONS SECTION 35 51 13.00 20 - CONCRETE

FLOATING PIER FOR SMALL CRAFT, PARAGRAPH 1.4.1.1 PIER LOADING AS

FOLLOWS:

THE VERTICAL WAVE LOAD: AS DETERMINED FROM A 3 FOOT WAVE

HEIGHT IS CHANGED TO A VERTICAL WAVE LOAD: AS DETERMINED FROM

A 1 FOOT WAVE HEIGHT.

THE LATERAL WAVE LOAD: AS DETERMINED FROM A 3 FOOT WAVE

HEIGHT IS CHANGED TO LATERAL WAVE LOAD: AS DETERMINED FROM A

1 FOOT WAVE HEIGHT.

THE CHANGE IS NECESSARY IN ORDER TO MAINTAIN THE DESIRED CROSS-

SECTION OF THE FLOATING PIERS WITHIN A LIMITED SPACE OF THE

EXISTING BOAT BASIN.

Other files

File Type Posted
PMVA01-ABSTRACT.pdf PDF
SF30(A002) Fender info.PDF PDF
IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .