Attachment_1__Schedule_of_Supplies_and_Services.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- CGC VIGILANT DD
- Solicitation number
- HSCG80-17-Q-P45G14
About this file
Updated Schedule of Supplies and Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001.pdf | ||
| Attachment_2_Past_Performance_Questionnaire.doc | DOC document | |
| HSCG80-17-Q-P45G14.pdf | ||
| Attachment_1__Schedule_of_Supplies_and_Services.xlsx | XLSX spreadsheet | |
| VIGILANT_DD_Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CGC VIGILANT DD
| PRICING SCHEDULE FOR: |
| USCGC VIGILANT (WMEC-617) DRYDOCK FY17 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| D-002 | Appendages (U/W), Leak Test | JOB | 1 | ||
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | ||
| D-004 | Appendages (U/W) - Internal, Preserve | JOB | 1 | ||
| D-005 | Voids (Non-Accessible), Leak Test | JOB | 1 | ||
| D-006 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | ||
| D-007 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | ||
| D-008 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| D-009 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | ||
| D-010 | Propulsion Stern Tube Bearings, Check Clearances | JOB | 1 | ||
| D-011 | Fathometer Transducer, General Maintenance | JOB | 1 | ||
| D-012 | Doppler Speed Log Transducer, Clean And Inspect | JOB | 1 | ||
| D-013 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | ||
| D-014 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | ||
| D-015 | Rudder Stock Bearings Clearances, Check | JOB | 1 | ||
| D-016 | U/W Body, Preserve (100%) | JOB | 1 | ||
| D-017 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | ||
| D-018 | Superstructure, Preserve “100%” | JOB | 1 | ||
| D-019 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | ||
| D-020 | Drydock | JOB | 1 | ||
| D-021 | Compartment(s) Interior, Lead Dust, Clean | JOB | 1 | ||
| D-022 | Fixed Ballast (Lead Ingots), Reinstall | JOB | 1 | ||
| D-023 | Aft Steering Bilge Plating, Renew | JOB | 1 | ||
| D-024 | Deballast Piping, Renew | JOB | 1 | ||
| D-025 | Fuel and Sounding Tube Piping, Renew | JOB | 1 | ||
| D-026 | Handrails, Renew | JOB | 1 | ||
| D-027 | Oily Water Tank Striker Plate, Renew | JOB | 1 | ||
| D-028 | Hull Stiffener, Renew | JOB | 1 | ||
| D-029 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-030 | Controllerable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-031 | Propulsion Shaft Coating, Inspect and Test ("A-Class") | JOB | 1 | ||
| D-031 | Propulsion Shaft Coating, Inspect and Test ("A-Class") | JOB | 1 | ||
| D-032 | Controllerable Pitch Propeller (CPP) System, Inspect and Service ("A-Class") | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 1 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
CGC VIGILANT DD FY 17
File details come from the government source that posted it. Updated .