SOS&S
| PRICING SCHEDULE FOR: |
| USCGC SANIBEL (WPB-110A) DRYDOCK AVAILABILITY FY2017 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Structural Analysis, 3D Laser Scan, Perform (D) | JOB | |||
| O-002 | Hull Plating (U/W Body), Inspect (D) | JOB | |||
| O-003 | Aluminum Hull and Structural Repairs - 1/4" Plate (O) | JOB | |||
| O-004 | Aluminum Hull and Structural Repairs - 3/16" Plate (O) | JOB | |||
| O-005 | Aluminum Hull and Structural Repairs - 5/16" Plate (O) | JOB | |||
| O-006 | Hull and Structural Plating Repairs -Crack (Aluminum) (O) | JOB | |||
| O-007 | Hull and Structural Plating Repairs - Crack (Steel) (O) | JOB | |||
| O-008 | Hull and Structural Plating Repairs - Eroded Weld (Aluminum) (O) | JOB | |||
| O-009 | Steel Hull and Structural Plating Repairs (5-Pound) (O) | JOB | |||
| O-010 | Steel Hull and Structural Plating Repairs (7.0 Pound, 7.5-Pound or 7.65-Pound) (O) | JOB | |||
| O-011 | Steel Hull and Structural Plating Repairs, Corrugated Plate (4.0-Pound) (O) | JOB | |||
| O-012 | Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) (O) | JOB | |||
| O-013 | Hull and Structural Plating – 10.0-Pound Steel, Repair (O) | JOB | |||
| D-014 | Appendages (U/W), Leak Test (D) | JOB | |||
| O-015 | Appendages (U/W) - Internal, Preserve (O) | JOB | |||
| D-016 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect (D) | JOB | |||
| D-017 | Voids (Non-Accessible), Leak Test (D) | JOB | |||
| O-018 | Voids (Non-Accessible), Internal Surfaces, Preserve (O) | JOB | |||
| D-019 | Tanks (MP Fuel Service), Clean and Inspect (D) | JOB | |||
| O-020 | Tanks, Air Test (O) | JOB | |||
| D-021 | Tanks (Potable Water), Clean and Inspect (D) | JOB | |||
| D-022 | Tanks (Dirty Oil and Waste), Clean and Inspect (D) | JOB | |||
| D-023 | Main Mast, Preserve, 100% (D) | JOB | |||
| D-024 | Propulsion Shafting, Remove, Inspect, and Reinstall (D) | JOB | |||
| D-025 | Propulsion Shafting, Renew (D) | JOB | |||
| D-026 | Mechanical Shaft Seal Assemblies, Overhaul (D) | JOB | |||
| D-027 | Propellers; Remove, Inspect, and Reinstall (D) | JOB | |||
| D-028 | Exhaust Piping System, Inspect (D) | JOB | |||
| D-029 | SW Heat Exchangers; Clean, Inspect And Hydro (D) | JOB | |||
| D-030 | Fathometer Transducer, Renew (D) | JOB | |||
| D-031 | Speed Doppler, Doppler Valve, Clean and Inspect (D) | JOB | |||
| O-032 | Underwater (Speed) Log Transducer(s), Renew (O) | JOB | |||
| D-033 | Pumps, Renew (D) CSMP 2017004 | JOB | |||
| D-034 | Sea Valves and Waster Pieces, Overhaul or Renew (D) | JOB | |||
| D-035 | Sea Strainers (All Sizes), Renew (D) | JOB | |||
| D-036 | Through-Deck Packing Glands, Renew (D) | JOB | |||
| D-037 | Steering Gear (General), Overhaul (D) | JOB | |||
| D-038 | Rudder Assembly, Remove, Inspect and Reinstall (D) | JOB | |||
| D-039 | Fin Stabilizers (General), Overhaul (D) | JOB | |||
| D-040 | Grey Water Holding Tank(s), Clean and Inspect (D) | JOB | |||
| D-041 | Sewage Holding Tank(s), Clean and Inspect (D) | JOB | |||
| D-042 | Grey Water Piping, Clean and Flush (D) | JOB | |||
| D-043 | Sewage Piping, Clean And Flush (D) | JOB | |||
| D-044 | Forward Peak Compartment, Preserve (D) | JOB | |||
| D-045 | Aft Steering Compartment, Preserve and Insulate (D) | JOB | |||
| D-046 | Strut Cofferdams, Port & Starboard, Preserve (D) | JOB | |||
| O-047 | Tanks (Aft Grey Water), Preserve “100%” (O) | JOB | |||
| O-048 | Tanks (Grey Water Holding), Preserve “100%” (O) | JOB | |||
| O-049 | Tanks (Potable Water), Preserve “100%” (O) | JOB | |||
| O-050 | Tanks (Sewage Vacuum Collection), Preserve “100%” (O) | JOB | |||
| D-051 | Battery Space, Preserve and Insulate (D) | JOB | |||
| D-052 | Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) (D) | JOB | |||
| D-053 | U/W Body, Preserve (100%) (D) | JOB | |||
| D-054 | Hull Plating Freeboard, Preserve “100%” (D) | JOB | |||
| D-055 | Superstructure, Preserve “100%” (D) | JOB | |||
| D-056 | Cathodic Protection System (Bilge and Sea Chest), Renew (D) | JOB | |||
| D-057 | Impressed Current Cathodic Protection System, Inspect and Maintain (D) | JOB | |||
| O-058 | Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew (O) | JOB | |||
| D-059 | Insulation, Bulkhead/Overhead, Renew (D) | JOB | |||
| D-060 | Drydock (D) | JOB | |||
| D-061 | Temporary Services, Provide - Cutter (D) | JOB | |||
| D-062 | Data Service, Provide (D) | JOB | |||
| D-063 | Sea Trial Performance, Support, Provide (D) | JOB | |||
| D-064 | Watertight Doors and Scuttles (External), Renew (D) | JOB | |||
| D-065 | Inspect & Renew Various, Sounding Tubes (D) | JOB | |||
| D-066 | Main Deck Soft Patch, Inspect, Repair, & Reseal CSMP 2017003 (D) | JOB | |||
| D-067 | Deck Covering System in Galley and Mess Deck, Renew (D) | JOB | |||
| D-068 | Deck Covering (Interior Wet/Dry), Renew (D) | JOB | |||
| D-069 | Towing Bits, Chocks, and Fair Leads, Inspect and Test (D) | JOB | |||
| D-070 | Chain Locker, Preserve 100% (D) | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00C | Travel and Perdiem | $0.00 | JOB | 1 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |