Amendment_001.pdf
PDF 17 KB Posted
- Attached to
- Deck Preservation and Deck Covering Renewal Federal contract opportunity
- Solicitation number
- HSCG80-16-R-P45105
About this file
Amendment 0001 for questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Deck_Preservation_IDIQ_Blank_Schedule_B.xls | XLS spreadsheet | |
| Specification_Rev-0 _28_May_2015.pdf | ||
| Deck_Preservation_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REQ NO. PROJECT NO. (If applicable)
0001 02/01/2016 N/A
6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6.) Code N/A
Commanding Officer
USCG Surface Forces Logistics Center
300 East Main Street
Norfolk, VA 23510 757-628-4640
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
HSCG80-16-R-P45105
9B. DATED (SEE ITEM 11)
January 19, 2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers ____ is extended _X___ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
DECK PRESERVATION AND DECK COVERING RENEWAL IDIQ
The purpose of this amendment is to answer a question that was received. Please see page 2 for question and answer.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Andrew Northcutt 15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (49 CFR) 53.243
HSCG80-16-R-P45105
Amendment 0001
Question:
Under General Requirements, Page 2, Para 3.4 – Welding and brazing requirements. The contractor shall perform all welding and allied processes and NDI in accordance with SFLC Std Spec 0740.
This Para was not in last IDIQ contract. Deck surfaces that require welding due to hole or cracks are not normally discovered until after deck removals, this is an unknown condition at the time of submitting the bid which makes it hard to price out. Normally QP-1 certified small painting contracts do not carry this certification.
Can you please see if this Para is warranted for preservation items?
Answer:
Yes, this paragraph is warranted. Any additional work that is discovered after deck removal (unknown conditions) will be handled via condition found report/change request. If welding and allied processes and NDI result of this process, the contractor will need to be in accordance with SFLC Std. Spec 0740 (General Requirements, Page 2, Para 3.4).