Schedule of Supplies Services Attachment.xls
XLS spreadsheet 29 KB Posted
- Attached to
- USCGC SEA DOG (WPB-87373) DRYDOCK REPAIRS
- Solicitation number
- HSCG80-12-R-PV1G83
About this file
Schedule of Supplies/Services Attachment Schedule of Supplies/Services for Dry Dock Repairs for USCGC SEA DOG (WPB-87373). Please insert your individual prices in this documents and your extended prices in the price totals table on page 5 of 44 within the RFP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_HSCG80-12-R-PV1G83.pdf | ||
| Specification Rev-0_1MAR2012.doc | DOC document | |
| Government Property Report Attachment.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank SOS&S (2)
| SCHEDULE OF SUPPLIES AND SERVICES for DRYDOCK REPAIRS | |||||
| U.S. COAST GUARD CUTTER (USCGC) SEA DOG (WPB-87373) | |||||
| PERIOD OF PERFORMANCE: JULY 11, 2012 THROUGH SEPTEMBER 7, 2012 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Remove Gyro Mounts | JOB | 1 | $0 | |
| D-002 | Perform Ultrasonic Thickness Measurements | JOB | 1 | $0 | |
| O-003 | Perform Ultrasonic Thickness Measurements | 25 SHOTS | 10 | $0 | |
| D-004 | Forepeak, Modify (EC 087-A-33) | JOB | 1 | $0 | |
| D-005 | Dirty Oil Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-006 | Oily Water Tank, Clean and Inspect | JOB | 1 | $0 | |
| D-007 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0 | |
| D-008 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0 | |
| D-009 | Decks - Exterior Main Deck, Preserve 100% | JOB | 1 | $0 | |
| D-010 | Superstructure, Preserve 100% | JOB | 1 | $0 | |
| D-011 | Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting | JOB | 1 | $0 | |
| O-012 | Depth Sounder, Capastic Fairing, Renew | JOB | 1 | $0 | |
| D-013 | Weather Tight Door, Fuel Station, Install (TCTO TB6000) | JOB | 1 | $0 | |
| D-014 | Hatch Coamings, Renew (EC 087-A027) | JOB | 1 | $0 | |
| D-015 | Mast Preserve 100% | JOB | 1 | $0 | |
| O-016 | Main Engine/Reduction Gear, Realign | JOB | 1 | $0 | |
| D-017 | Propulsion Shafts, Remove, Inspect, and Reinstall | JOB | 1 | $0 | |
| O-018 | Propulsion Shaft, Repair | JOB | 1 | $0 | |
| O-019 | Propulsion Shaft, Straighten | JOB | 1 | $0 | |
| O-020 | Intermediate Water-Lubricated Shaft Bearing, Renew | JOB | 1 | $0 | |
| O-021 | Aft Water-Lubricated Shaft Bearing, Renew | JOB | 1 | $0 | |
| O-022 | Intermediate Bearing Carrier, Renew | JOB | 1 | $0 | |
| O-023 | Aft Bearing Carrier, Renew | JOB | 1 | $0 | |
| O-024 | Stern Tube, Interior Surfaces, Preserve 100% | JOB | 1 | $0 | |
| O-025 | Stern Tube, Interior Surfaces, Repair | JOB | 1 | $0 | |
| D-026 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0 | |
| O-027 | Propeller, Minor Repair and Recondition, Perform | JOB | 1 | $0 | |
| D-028 | Lighting, Repair | JOB | 1 | ||
| D-029 | Fathometer Transducer, Renew | JOB | 1 | $0 | |
| D-030 | Speed Log, Skin Valve Assembly, Clean and Inspect | JOB | 1 | $0 | |
| D-031 | Ventilation System, Engine Room Supply & Exhaust Fan Assemblies, Clean and Inspect | JOB | 1 | $0 | |
| D-032 | HVAC System Ducting, Clean | JOB | 1 | $0 | |
| D-033 | HVAC Piping Tree, Renew | JOB | 1 | $0 | |
| D-034 | Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and Repair | JOB | 1 | ||
| D-035 | Fire Station Camelback Racks, Modify (TCTO TB3000) | JOB | 1 | ||
| D-036 | AFFF Bilge Piping System, Install (EC 087-A-24) | JOB | 1 | ||
| D-037 | Rudder Assemblies, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-038 | Mooring Bits, Renew (EC 087-B-037) | JOB | 1 | ||
| D-039 | RHIB Notch Skid Pads, Inspect | JOB | 1 | ||
| O-040 | RHIB Notch Skid Pad Studs, Renew | 10 STUDS | 5 | ||
| D-041 | Stern Launch Door, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-042 | Grey Water Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-043 | Sewage Holding Tank, Clean and Inspect | JOB | 1 | ||
| D-044 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-045 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-046 | U/W Body, Preserve (“100%”) | JOB | 1 | ||
| D-047 | Hull Plating Freeboard, Preserve 100% | JOB | 1 | ||
| D-048 | Cathodic Protection / Zincs, Renew | JOB | 1 | ||
| D-049 | Interior Deck Drains, Unseal | JOB | 1 | ||
| D-050 | Interior Deck Covering System, Reseal | JOB | 1 | ||
| D-051 | Drydocking | JOB | 1 | ||
| D-052 | Temporary Services, Provide | JOB | 1 | ||
| D-053 | Telephone Services, Provide | JOB | 1 | ||
| D-054 | Bow Stachions, Repair (D) | JOB | 1 | ||
| O-055 | Propulsion Shaft (Strain Gauge Alignemnt), Measure | JOB | 1 | ||
| 0 | |||||
| O-A | Composite Labor Rate | Hour | 640 | $0 | |
| D-B | GFP Report | NSP | EA | 1 | NSP |
| O-Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(&D)
Page &P of &N
File details come from the government source that posted it. Updated .