SPECIFICATION FOR FIRE SUPPRESSION SYSTEM INSPECTION FSS_(WPB_87_110)_VMS_12R0.pdf

PDF 198 KB Posted

Attached to
FIRE SUPPRESSION SYSTEM INSPECTION Federal contract opportunity
Solicitation number
HSCG80-12-R-P30R59
Issued by
Department of Homeland Security US Coast Guard

About this file

SPECIFICATION FOR FIRE SUPPRESSION SYSTEM INSPECTION

View the file

Other files for this federal contract opportunity

Other files attached to FIRE SUPPRESSION SYSTEM INSPECTION, newest first.
File Type Posted
SF300002 FSSI IDIQ 08-06-12.doc DOC document
87-110WPB_FSS_ER2_blank.xls XLS spreadsheet
SF300001 FSSI IDIQ 08-02-12.doc DOC document
87-110WPB_FSS_ER1_blank.xls XLS spreadsheet
SCHEDULE OF SUPPLIES SERVICES FIRE SUPPRESSION SYSTEM 87-110WPB_FSS_ER1_blank.xls XLS spreadsheet
110_ cutter home ports.xls XLS spreadsheet
87_ cutter home ports.xls XLS spreadsheet
Solicitation for Fire Suppression System 07_13_12.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG WPB

87 FOOT PATROL BOAT

110 FOOT PATROL BOAT

SPECIFICATION FOR FIRE SUPPRESSION SYSTEM INSPECTION

Developed By: Victoria M Solak

(Rev-0, 2 AUG 2011)

USCGC (WPB 87, WPB 110) FIRE SUPPRESSION SYSTEM INSPECTION 2012

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ....................................................................................................................................... iii Consolidated List of References Consolidated List of Government-furnished Property 87 WPB Principal Characteristics 110 WPB “A” Class Principal Characteristics General Requirements WORK ITEM 1: FM-200 Fixed Fire Suppression Cylinders , Hydro-Test WORK ITEM 2: FM-200 Fixed Fire Suppression System Cylinders, Inspect WORK ITEM 3: Halon System, Inspect and Hydro Static Test WORK ITEM 4: Range Guard Fire Suppression System , Inspect and Test WORK ITEM 5: CO2 Fire Suppression System, Inspect and Test WORK ITEM 6: CO2 Cylinders , Inspect and Hydrostatically Test WORK ITEM 7: Range Guard Fire Suppression System , Inspect and Test

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iii (Rev-0) iv (Rev-0)

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 110B WPB 555-001, Rev C, Halon Flooding Systems Detail Coast Guard Drawing 110C WPB 555-001, Rev -, Halon Flooding Systems Details Coast Guard Drawing 110-WPB-555-003, Installation INCID FM-200 Fire Suppression System, Subtitled - PIPING SYSTEMS, Sheets 7-22 Coast Guard Drawing 87 WPB 555-00 1, Rev C , CO2 System

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center 0000 Standard Specification (SFLC Std Spec 0000), Jan 2009, General Requirements Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 2006C, Mar 2009, Preventative Maintenance Manual, Damage Control --- Not available on NE-TIMS, hard copy available in V Library Coast Guard Technical Publication (TP) 2938, MANUFACTURER'S INSTRUCTION BOOK-SWBS GROUP(S) 625-651 , A Class Coast Guard Technical Publication (TP) 3107A, Sept 2008, SWBS 555, Halon 1301 Fire Suppression System

– Maintenance, Repair and Parts Instructions Coast Guard Technical Publication (TP) 3107B, Sept 2008, SWBS 555, Halon 1301 Eng Rm Flooding System

– Operation and Maintenance Instructions Coast Guard Technical Publication (TP) 3109 , MANUFACTURER'S INSTRUCTION BOOK-SWBS GROUP(S) 625-651 , B Class Coast Guard Technical Publication (TP) 3247 , MANUFACTURER'S INSTRUCTION BOOK-SWBS

1 (Rev-0) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace

GROUP(S) 625-651 , C Class Coast Guard Technical Publication (TP) 4563A, 25 SEP 2009, Exhaust Hood System Coast Guard Technical Publication (TP) 4563B, 25 SEP 2009, Fire Supression System Model (Ansul R-102) Coast Guard Technical Publication 4613, MANUFACTURER’S INSTRUCTION BOOK – SWBS GROUP(S) Coast Guard Technical Publications 4613, MANUFACTURER’S INSTRUCTION BOOK – SWBS

GROUP(S) 555

Surface Forces Logistics Center 0000 Standard Specification (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes WPB 110 MPC ( R-A-1571 ) , 0 1 Aug 2002, Test Range Guard and Replace Fusible Links WPB 87 MPC N30020.0, 1 DEC 10, Inspect/Check Range Guard ALRM & ACT TEST WPB 87 MPC N33005.0, 29 OCT 10, Inspect CO2 CYL Test Delay and Cables

OTHER REFERENCES

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Code of Federal Regulations (CFR), Title 49 , § 1 80 (Continuing Qualification and Maintenance of Packagings) Code of Federal Regulations (CFR), Title 49 , §178.37 (Specifications for Packagings, Subpart C, Specifications for Cylinders, Specification 3AA and 3AAX Seamless Steel Cylinders) Code of Federal Regulations (CFR), Title 49, Section 173.34 Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Compressed Gas Association Pamphlet C-6, Section 3 MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning

2 (Rev-0)

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

This section is not applicable to this package.

3 (Rev-0)

Consolidated List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work Item Title

This section is not applicable to this package.

4 (Rev-0)

87 WPB Principal Characteristics

PC_87_WPB_0511

87' WPB

PHYSICAL CHARACTERISTICS

Length Overall 87' Length between Perpendiculars 81' 7" Depth 10' 11" Maximum Beam 19.4' Draft, Mean to Design Waterline 5' 9" Height of Highest Projection 50.2' Full Load Displacement 93.5 long tons Minimum Operating Displacement 83.9 long tons Displacement, Light Ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

HULL CHARACTERISTICS

Hull/Main Weatherdeck Material ABS Grade AH 36 Superstructure 5086 Aluminum

MACHINERY CHARACTERISTICS

Main Propulsion Two MTU 8V396TE94, sequential turbo-charged diesels

Reduction Gears Two ZF Type BW 255 Propulsion Shaft Two AQUAMET 22, 101.6mm Shaft Diameter 4" Shaft Seal Two John Crane mechanical seals Shaft Bearing, Intermediate Thordon Elastomeric Bearing Shaft Bearing, Aft Thordon Elastomeric Bearing Number of Propellers 2 Number of Blades 5 Diameter of Propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel

Ship's Service Generators Two Man Model D08241F01 diesel with Stanford 60KW Generator

TANK CAPACITIES

3-9-1-F (Fuel Oil) 1402 gal 3-9-2-F (Fuel Oil) 1402 gal 3-12-2-F (Waste Oil) 86 gal 3-12-1-F (Oily Water) 86 gal 3-7-0-Q (Sewage Collection) 352 gal 3-7-1-Q (Grey Water) 52 gal 3-12-1-W (Fresh Water) 200 gal 3-12-2-W (Fresh Water) 200 gal

5 (Rev-0)

110 WPB “A” Class Principal Characteristics

110’ WPB (“A”-CLASS) PATROL BOAT

PHYSICAL CHARACTERISTICS

Length Overall 110' 0" or 113' if stern flap present Length between Perpendiculars 104' 1/2" Depth 10' 1/2" Beam, Molded 21' 1" Depth, Molded 10' 11-1/4" Full Load Draft 6' 5-3/4" Height of Highest Projection 55' Full Load Displacement 165.1 long tons Anchor 210 lb Sea Anchor with 400 ft of 0.5" BBB Chain

Shore Tie Voltage Requirements 450VAC 400A 3PH 60Hz ungrounded

HULL CHARACTERISTICS

Hull BS-4360, GR 43A Steel Main Weatherdeck & Superstructure 5086 Aluminum Alloy Frame Spacing Various Bulkheads Seven watertight transverse Fin Stabilizers Frame 22-1/2

MACHINERY

CHARACTERISTICS

Main Propulsion Two Paxman Type 16 RP200M (Valenta) V-16 Diesel; 2880 BHP each @ 1500 RPM (max)

Reduction Gears Two ZF Model BW 1500 reversible reduction gearboxes; 1.839:1 ratio

Number of Propellers 2 Number of Blades 5 Diameter of Propeller 49.6" Pitch 61.4"

RPM N/A

Shaft Monel Alloy K500, or AQUAMET 17 Shaft Diameter 4" Shaft Seal Johnson Duramax split face seal Shaft Bearings Rubber Cutless or Thordon Rudders Twin underslung type, 5 sq ft each

Ship's Service Generators Two Caterpillar Type 3304BT diesel; 99KW, 460V, 60Hz, 3-phase, 3-wire @ 1800 RPM

TANK CAPACITIES

Fuel Oil (95%) 11,250 gal Fresh Water (100%) 1,760 gal Lubricating Oil (95%) 109 gal

6 (Rev-0)

7 (Rev-0)

00000_PWB_0211_FLT

REC_0000_FLT_ Commercial Project @ CG Facility (0211)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and

Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface

Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel

Surfaces Prepared by Dry Abrasive Blast Cleaning

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

8 (Rev-0) http://www.uscg.mil/directives/cim.asp

9 (Rev-0)

55501_EDV_0710_110

WORK ITEM 1: FM-200 Fixed Fire Suppression Cylinders , Hydro-Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and hydrostatically test the cylinders for the FM-200 Fixed Fire Suppression System to include all installed compressed gas cylinders within the FM-200 Fixed Fire Suppression System.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 110-WPB-555-003, Installation INCID FM-200 Fire Suppression System, Subtitled - PIPING SYSTEMS, Sheets 7-22

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication 4613, MANUFACTURER’S INSTRUCTION BOOK – SWBS

GROUP(S) 555

Surface Forces Logistics Center 0000 Standard Specification (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

Code of Federal Regulations (CFR), Title 49, Section 173.34

3. REQUIREMENTS

3.1 General. The Contractor shall conduct a hydrostatic test of the FM-200 Fixed Fire Suppression System, in accordance with TP-4613 and Code of Federal Regulations (CFR), Title 49, Section 173.34.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

3.1.4 Interferences.

None.

3.2 Removal. Disconnect and remove the cylinders for the FM-200 Fixed Fire Suppression System (Total of 5 cylinders), shown on CG Drawing 110-WPB-555-003 (sheet 20), to a certified testing facility.

3.2.1 Testing. The cylinders shall be emptied, retested and re-stamped in accordance with DOT CFR Title 49, Section 173.34. Provide two copies of the inspector's report to the COTR within 24 hours after testing the cylinders. Mark all cylinders as applicable.

3.2.2 Reinstallation. Reinstall in accordance with the manufacturer's recommended procedures, using new O-rings and hardware.

3.3 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all items or shipboard devices that have been disturbed, used, repaired, altered, or installed, to prove that they are in satisfactory operating condition. Submit a CFR.

4. NOTES

This section is not applicable to this work item.

10 (Rev-0)

11 (Rev-0)

55500_EDV_0710_110

WORK ITEM 2: FM-200 Fixed Fire Suppression System Cylinders, Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect the cylinders for the FM-200 Fixed Fire Suppression System.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Technical Publications 4613, MANUFACTURER’S INSTRUCTION BOOK – SWBS

GROUP(S) 555

Surface Forces Logistics Center 0000 Standard Specification (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

Compressed Gas Association Pamphlet C-6, Section 3

3. REQUIREMENTS

3.1 General. The Contractor shall inspect the cylinders for the FM-200 Fixed Fire Suppression System using TP 4613 as reference, to include all installed compressed gas cylinders within the system.

3.1.1 CIR.

None.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

3.1.4 Interferences.

None.

3.1.5 The Contractor shall provide temporary fire main service while the FM-200 Fixed Fire Suppression System is secured.

3.2 Cylinder Inspection. The Contractor shall do the following, in accordance with Compressed Gas Association Pamphlet C-6, Section 3:

3.2.1 Inspection. Perform a complete external visual inspection in accordance with Compressed Gas Association Pamphlet C-6, Section 3, except that the cylinders need not be emptied or stamped while under pressure. Record date of inspection on record tag attached to each cylinder. Where the visual inspection shows damage or corrosion, the contractor shall submit a condition found report to the COTR for action.

4. NOTES

12 (Rev-0)

13 (Rev-0)

55530_DNK_0309_110

REC_55530_110_110’ WPB Class (ALL) (0609)

WORK ITEM 3: Halon System, Inspect and Hydro Static Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test a total of two (one active and one spare) 95 lbs and two (one active and one spare) 60 lbs 1301 halon cylinders located in Auxiliary Machinery and Storage (3-32-0-E).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 110B WPB 555-001, Rev C, Halon Flooding Systems Detail Coast Guard Drawing 110C WPB 555-001, Rev -, Halon Flooding Systems Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 2006C, Mar 2009, Preventative Maintenance Manual, Damage

Control --- Not available on NE-TIMS, hard copy available in V Library Coast Guard Technical Publication (TP) 3107A, Sept 2008, SWBS 555, Halon 1301 Fire Suppression

System – Maintenance, Repair and Parts Instructions Coast Guard Technical Publication (TP) 3107B, Sept 2008, SWBS 555, Halon 1301 Eng Rm Flooding

System – Operation and Maintenance Instructions Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

3.1.2 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.3 References. The Contractor shall use Coast Guard Drawing 110B WPB 555-001, 110C WPB 555-001, TP 2006C, TP 3107A and TP 3107B for guidance during all work.

3.1.4 Cylinders. The Contractor shall inspect a total of two (one active and one spare) 95 lbs and two (one active and one spare) 60 lbs 1301 halon cylinders located in Auxiliary Machinery and Storage (3-32-0-E). Coast Guard Inspector may assist in locating the halon cylinders.

3.2 Pressure test - initial. With the halon cylinders at their present locations and prior to removal, the Contractor shall record the pressure gauge reading and ambient temperature closest to the cylinders in accordance with TP 2006C.

3.3 Halon cylinder inspection and tests. The Contractor shall inspect and test the halon cylinders in accordance with TP 2006C.

3.3.1 Temporarily disconnect the ¼” flexible actuation hose and 1½” flexible discharge hose from the halon cylinder.

3.3.2 Install the anti-recoil and shipping caps prior to removing mounting brackets.

3.3.3 Remove mounting brackets/clamps from halon cylinders and remove cylinders. Inspect brackets/clamps and structural welds for cracks, breaks, deformation, distortion and deterioration.

3.3.4 Inspect halon cylinders for rust or corrosion and damaged paint finish and inspect pressure gage for obliterated markings, cracked face, and bent or missing pointer. Submit a CFR.

NOTE

Any cracked, dented, or broken halon cylinders shall be reported immediately to the Coast Guard Inspector for replacement.

3.4 Weight test. The Contractor shall weigh each cylinder in accordance with TP 2006C. Submit a CFR.

3.5 Liquid level inspection. The Contractor shall check the liquid levels in each cylinder in accordance with TP 2006C. Submit a CFR.

NOTE

Verify readings using TP 3107B, drawings #52704N for 95 lbs halon cylinder and #52703N for 60 lbs halon cylinder.

Liquid level decal on the halon cylinder is located 32.88 inches + 0.13 for 95 lbs halon cylinder and 21.38 inches + 0.13 for 60 lbs halon cylinder measured from the base of the cylinder.

14 (Rev-0)

3.6 Reinstallation. The Contractor shall reinstall halon cylinders, all mounting brackets and clamps, and reconnect all flexible hoses and couplings in accordance with TP 3107A. In the presence of the Coast Guard Inspector, ensure that all control valves and actuation piping are properly lined up for service.

3.7 Pressure test - final. After all cylinders are properly reconnected, the Contractor shall take and record the pressures of each cylinder in accordance with TP 2006C. Submit a CFR.

3.8 Records. The Contractor shall turn over the record of the cylinder weight, pressure and inspections to the Coast Guard Inspector.

3.9 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with COMDTINST M10360.3, Appendix B (Cutter and Boat Interior Painting Systems). Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

4. NOTES

15 (Rev-0)

16 (Rev-0)

55531_ENV_0611_110WPB

WORK ITEM 4: Range Guard Fire Suppression System , Inspect and Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the range guard fire suppression system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 2938, MANUFACTURER'S INSTRUCTION BOOK-SWBS

GROUP(S) 625-651, A Class Coast Guard Technical Publication (TP) 3109, MANUFACTURER'S INSTRUCTION BOOK-SWBS

GROUP(S) 625-651, B Class Coast Guard Technical Publication (TP) 3247, MANUFACTURER'S INSTRUCTION BOOK-SWBS

GROUP(S) 625-651, C Class WPB 110 MPC (R-A-1571), 01 Aug 2002, Test Range Guard and Replace Fusible Links

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General. The contractor shall refer to TP-2938, TP-3109, TP-3247 and WPB 110 MPC (R-A-1571).

3.1.1 CIR.

None.

3.1.2 Technical Representative. Work shall be performed by an authorized marine fire extinguishing system inspector. Refer to Manufacturer’s Instruction Manual.

3.1.3 Protective measures. The Contractor shall protect non-affected vessel’s equipment, components, and spaces during surface preparation and coating application procedures, as specified in SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):

• Deep fat fryer.

• Cableways

• TLIs

3.2 Inspection and Testing. The Contractor shall perform the “Annual Maintenance Examination” described in WPB 110 MPC (R-A-1571). Remove from system and weigh all range guard fire suppression system bottles;

verify no leakage. Verify all nozzles are unobstructed. Renew all 360 degree fusible links. Return system to normal operating condition. Submit a CFR that certifies satisfactory inspection and testing results.

4. NOTES

17 (Rev-0)

18 (Rev-0)

55530_JLW_0411_87WPB

WORK ITEM 5: CO2 Fire Suppression System, Inspect and Test

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the CO2 fire suppression system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 555-001, Rev C, CO2 System

COAST GUARD PUBLICATIONS

WPB 87 MPC N33005.0, 29 OCT 10, Inspect CO2 CYL Test Delay and Cables

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General. The contractor shall refer to Coast Guard Drawing 87 WPB 555-001 and WPB 87 MPC N33005.0.

Work shall be performed by an authorized marine fire extinguishing system inspector.

3.2 Inspection and Testing. After Ships Force has performed all safety preparations per WPB 87 MPC N33005.0, de-activate the CO2 system, weigh two CO2 bottles, verify that the time delay operates properly, and test the pull cable actuation devices. Submit CFR certifying satisfactory inspection and testing results. After completion of all work, and after Ships Force has performed all safety preparations per WPB 87 MPC N33005.0, reactivate the CO2 system.

55531_MWS_0611_87WPB

WORK ITEM 6: CO2 Cylinders , Inspect and Hydrostatically Test

1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect, hydrostatically test (qualify) and reinstall the CO2 fire suppression cylinders.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 555-001, Rev C, CO2 System

COAST GUARD PUBLICATIONS

WPB 87 MPC N33005.0, 29 OCT 10, Inspect CO2 CYL Test Delay and Cables

OTHER REFERENCES

Code of Federal Regulations (CFR), Title 49, §178.37 (Specifications for Packagings, Subpart C, Specifications for Cylinders, Specification 3AA and 3AAX Seamless Steel Cylinders) Code of Federal Regulations (CFR), Title 49, §180 (Continuing Qualification and Maintenance of

Packagings)

3. REQUIREMENTS

3.1 General. The contractor shall refer to Coast Guard Drawing 87 WPB 555-001 and CFR Title 49, §173.37 and §180 as guidance.

3.2 Inspection and hydrostatic testing. After Ships Force has performed all safety preparations per WPB 87 MPC N33005.0, de-activate the CO2 system and remove the CO2 bottles. Inspect, test and re-qualify the CO2 cylinders. Prior to reinstallation, verify that the time delay operates properly, and test the pull cable actuation devices. Upon CO2 requalification, reinstall the cylinders. Submit CFR certifying satisfactory inspection and testing results. After completion of all work, and after Ships Force has performed all safety preparations per WPB 87 MPC N33005.0, reactivate the CO2 system.

19 (Rev-0)

20 (Rev-0)

21 (Rev-0)

55531_JLW_0411_87WPB

WORK ITEM 7: Range Guard Fire Suppression System , Inspect and Test

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the range guard fire suppression system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 4563A, 25 SEP 2009, Exhaust Hood System Coast Guard Technical Publication (TP) 4563B, 25 SEP 2009, Fire Supression System Model (Ansul R-

102) WPB 87 MPC N30020.0, 1 DEC 10, Inspect/Check Range Guard ALRM & ACT TEST

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General. The contractor shall refer to TP-4563A, TP-4563B and WPB 87 MPC N30020.0. Work shall be performed by an authorized marine fire extinguishing system inspector.

3.2 Inspection and Testing. The Contractor shall perform the “Semi-Annual Maintenance Examination” described in TP-4563B. Remove from system and weigh all range guard fire suppression system bottles; verify no leakage. Verify all nozzles are unobstructed. Renew all 360 degree fusible links. Return system to normal operating condition. Submit a CFR that certifies satisfactory inspection and testing results.

22 (Rev-0)

Revisions Record
Consolidated List of References
87 WPB Principal Characteristics
110 WPB “A” Class Principal Characteristics
General Requirements
WORK ITEM 1: FM-200 Fixed Fire Suppression Cylinders , Hydro-Test
WORK ITEM 2: FM-200 Fixed Fire Suppression System Cylinders, Inspect
WORK ITEM 3: Halon System, Inspect and Hydro Static Test
WORK ITEM 4: Range Guard Fire Suppression System , Inspect and Test
WORK ITEM 5: CO2 Fire Suppression System, Inspect and Test
WORK ITEM 6: CO2 Cylinders , Inspect and Hydrostatically Test
WORK ITEM 7: Range Guard Fire Suppression System , Inspect and Test