Amendment 1.pdf
PDF 112 KB Posted
- Solicitation number
- HSCG80-11-Q-PHM004
About this file
USCGC PEA ISLAND (WPB-1347) USCGC OCRACOKE (WPB-1307) USCGC NANTUCKET (WPB-1316) USCGC KNIGHT ISLAND (WPB-1348) - Amendment 00001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dwg 50587-2 Model R28F50.pdf | ||
| CIM_10360_3C.pdf | ||
| 3988_311_C.pdf | ||
| 3988_311_D.pdf | ||
| PEA ISLAND Spec dtd 18 June 2010 Rev 0.pdf | ||
| NANTUCKET Spec dtd 18 June 2010 Rev 0.pdf | ||
| Multi-cutter Commercial RFP.doc | DOC document | |
| KNIGHT ISLAND Spec dtd 18 June 2010 Rev 0.pdf | ||
| OCRACOKE Spec dtd 18 June 2010 Rev 0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC PEA ISLAND (WPB-1347), USCGC OCRACOKE (WPB-1307),
USCGC NANTUCKET (WPB-1316) & USCGC KNIGHT ISLAND (WPB-1348)
Solicitation: HSCG80-11-R-PHM004
SF 30, Block 14 Continuation Page
1. In regards to both the USCGC Nantucket & USCGC Ocracoke Multi-Cutter RFP Pkg (HSCG80-11-Q- PHM004), Work item 55-D calls to renew with GFE the galley refrigerator/freezer units. It states that an access opening can be cut. Has the Coast Guard previously renewed these units on other vessels? If so:
in what location was the temporary access located?
The Coast Guard is presently unaware of any other cutter that has had the galley refrigerator/freezer units renewed (see attached DWG # 50587-2 Model R28F50 for dimensions of the disassembled unit).
2. Work Item 59 in the OCRACOKE work package tasks the Contractor to remove and install new underlayment and flooring in a number of compartments and spaces. In each instance the square footage is estimated except for the last space which is the Mess Deck. Please clarify what is included in the Mess Deck? Is the Galley area included? Is the Dry Provisions area included? Is the area beneath the new Refrigerator unit included?
The entire Mess Deck will need to be replaced to include all areas listed in the question. The Mess Deck is approximately 200 sqft. Contractors are reminded that they are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
3. Work Item 54 in the S.O.W. for the USCGC OCRACOKE requires that the SSDGs be cleaned and inspected in-place “in accordance with Std. Spec. 2350_Std, using TP 3988 as reference. The Contractor requests the following information in order to properly estimate this work: TP 3988
See attachments to view TP 3988
4. In regards to Work Item 60 in the Knight Island’s specification, please clarify of the scope of repair in paragraph 3.2.
The photo provided in paragraph 4.2 is representative of the current conditions of the 13 gooseneck vents.
5. Where are the tank drawings, general arrangements located? There should be some type of longitudal on a top/plan view of the tanks which I am unable to find as well.
All required drawings are provided on the CD-ROM and available free of charge to contractors upon request. A site visit is recommended if further clarification is required.
6. What is the minimum amount of electricity required for the vessels being docked here, so that we may bid the electricity accurately?
Electrical shore tie requirements are listed on the principal requirements page.
USCGC PEA ISLAND (WPB-1347), USCGC OCRACOKE (WPB-1307),
USCGC NANTUCKET (WPB-1316) & USCGC KNIGHT ISLAND (WPB-1348)
Solicitation: HSCG80-11-R-PHM004
SF 30, Block 14 Continuation Page
7. Can you please tell me how the insurance cert. needs to read? Will it just need to list the USCG Surface
Forces Logistics Center or will it also need to list all (4) of the vessels?
Each cutter shall be insured individually and possess separate insurance certificates. Please see the “Required Insurance” in the solicitation for further clarification.
8. Can you please let us know how we can identify the drawings that go with the items of the bid pkg?
See drawings list under List of Applicable References or individual Work Item in the specification
9. Is there a more updated copy of the Comdtinst M10360.35 manual?
See attachments to view COMDTINST M10360.3C
10. Can proposals be e-mailed?
Yes, to the e-mail address listed in the solicitation
(End of Questions and Answers)
File details come from the government source that posted it. Updated .