USCGC VALIANT (WMEC-210B) DOCKSIDE AVAILABILITY 2011
USCGC VALIANT (WMEC 621)
SPECIFICATION FOR DOCKSIDE BOILER REPAIRS
Developed By: Rodney Alford (Rev-0, 24 November 2010)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viConsolidated List of Government-furnished Property viiConsolidated List of Critical Inspection Items viiiPrincipal Characteristics
3WORK ITEM 01: Renew #1 and # 2 Ship Service Boiler Shells
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace Coast Guard Drawings Coast Guard Technical Publication (TP) 2188, Apr 2006, Steam Heating Boiler, Model 5848-14E
Coast Guard Drawing 627 WMEC 085-211, Rev-, Booklet of General Plans
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 182-002 Rev F, Major Main Avail. Foundation in Engine Room
Coast Guard Drawing 627 WMEC 201-001, Rev C, Arrangement of Machinery Plans, Sections, & Elevations Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses Other References Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Consolidated List of Government-furnished Property
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| Way-Wolff Boiler |
| Model No. 5848-14E |
NSN: 4410-01-182-1910
| 2 ea. |
| 25,000.00 |
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
PC_210B_WMEC_0909
Principal Characteristics 210' WMEC (B-Class)
Physical Characteristics
| Length Overall |
| 210' 6" |
| Length, Design Waterline |
| 200' 0" |
| Depth (main deck at side to baseline) |
| 19' 6" |
| Maximum Beam |
| 34' 0" |
| Height of Highest Projection |
| 88' 0" |
| Full Load Draft |
| 4,000 lbs |
| Height of FM Antenna Above Baseline |
| 90' 0" |
| Light Ship Displacement |
| 875 long tons |
| Full Load Displacement |
| 1100 long tons |
| Shore Tie Voltage Requirements |
| 400A / 440V |
| Frame Spacing |
| 1' 0" |
Machinery Characteristics
| Main Propulsion |
| 2 Alco Model 251B Diesel Engines, 5,000 BHP total |
| Ship's Service Generators |
| 2 Caterpillar Model 3406B Diesel-driven SR4. 250 KW each @ 0.8 power factor, 440V AV, 3 phase, 60 cycle |
| Emergency Generator |
| Caterpillar Model D333B Diesel-Driven. Century Synchronous Model, ACR-507, 100KW |
| Number of Propellers |
| 2 |
| Number of Blades |
| 4 |
| Diameter |
| 7' 6" |
| Pitch |
| Controllable |
| Shaft RPM |
| 300 |
| Shaft Diameter |
| 8.25" |
Tank Capacities
| Diesel Fuel (95%) |
| 48,375 gal |
| Fresh Water (95%) |
| 11, 108 gal |
| JP-5 Fuel (95%) |
| 4,697 gal |
| Lube Oil (95%) |
| 1,942 gal |
00000_PWB_1110_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (1209) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazard wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.3 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.
3.4.4.4 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
WORK ITEM 01: Renew #1 and # 2 Ship Service Boiler Shells
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the #1 and #2 (port and starboard) ship's service boiler shells in the Engine Room, upper level, port and starboard sides, between Frames 108 and 112.
1.2 Government-furnished property.
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/UNIT)
| N |
| Way-Wolff Boiler |
| Model No. 5848-14E |
NSN: 4410-01-182-1910
| 2 ea. |
| 25,000.00 |
2. REFERENCES
Coast Guard Drawings Coast Guard Technical Publication (TP) 2188, Apr 2006, Steam Heating Boiler, Model 5848-14E
Coast Guard Drawing 627 WMEC 085-211, Rev-, Booklet of General Plans
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 182-002 Rev F, Major Main Avail. Foundation in Engine Room
Coast Guard Drawing 627 WMEC 201-001, Rev C, Arrangement of Machinery Plans, Sections, & Elevations Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall renew the #1 and #2 ship's service boiler shells (Way-Wolff steam boiler, Model 5848-14E) with Government-furnished Way-Wolff boiler shells. Refer to Coast Guard Drawings 627 WMEC 085-211, 627 WMEC 131-1, 627 WMEC 182-2, 627 WMEC 201-001, and TP-2188 for guidance.
3.2 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the COR (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.
3.3 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:
· Fuel oil piping.
· Steam piping.
· Insulation.
· Metal sheathing.
· Handrail.
· Stanchions.
· Deck frames and grating.
· Wiring brackets.
· Ducting.
· Transformers.
· Bilge piping.
3.4 Additional structural supports. When ship’s structure is removed as an interference or is otherwise temporarily modified to facilitate repairs, the Contractor shall maintain existing structural integrity of the ship by installing temporary supports equivalent to those temporarily modified or removed. These temporary supports shall be approved by the COR prior to removing or modifying ship’s structure. Pay particular attention to structure supporting the #1 and #2 Ship Service generators. Restore to original configuration after completion of work.
3.5 Boiler shell removal. The Contractor shall:
3.5.1 Disconnect all piping, insulation, sheet metal wrap, exhaust ductwork, and accessories in way of boiler removal.
3.5.1.1 Dispose of flushing fluid in accordance with all applicable Federal, state, and local regulations. Clean all bilge contamination discovered, if any, which was due to improper protection or performance of work, to the original condition of cleanliness prior to the start of work.
CAUTION!
Do not drain ANY Fluids (including fresh water) into any space, bilge, or exterior location.
3.5.2 Crop out, remove, and dispose of the existing boilers using a temporary hull opening. (See paragraph 3.2 above.)
3.6 Inspection. The Contractor shall visually inspect all the existing #1 and #2 boiler associated piping, foundations, exhaust ductwork, and electrical wiring for corrosion and deterioration. Submit a CFR.
3.7 Surface preservation. The Contractor shall prepare and coat the boiler foundation surfaces, including all adjacent structural members, in accordance with SFLC Std Spec 0000, paragraph titled “General preservation requirements”, using the coating system specified for “Machinery, Interior (Machinery, Steel, Operating Temperatures Over 200oF Surfaces)” in COMDTINST M10360.3, Appendix B (Cutters and Boats Interior Painting Systems). Select finish/top coat color to match existing adjacent surfaces.
3.8 New boiler shells installation. The Contractor shall accomplish the following:
3.8.1 Rig in the new Government-furnished Way-Wolff boiler shells through the same route used for removing the old boiler shell.
3.8.2 Assemble and install the Government-furnished Way-Wolff boiler shells and their accessories to original configuration using TP-2188 as guidance. Weld each new boiler shell onto its foundation in accordance with Std Spec 0740_STD.
3.8.3 Modify the exhaust ports to facilitate a proper fit in the machinery space. Fabricate and install two new flanges, one per boiler, to suit the existing exhaust duct flanges.
3.8.4 Before complete reassembly, hydrostatically test the boilers in accordance with SFLC Std Spec 0740. Plug all external holes in the boiler; hydrostatically test the water side at 100 psi with clean fresh water for 15 minutes. Notify the Coast Guard Inspector 24 hours prior to testing. Submit a CFR.
NOTE
Historically, it has been necessary to weld two 4 inch to 2 inch reducer fittings into each boiler to accomplish the hydrostatic test.
3.8.5 Reconnect all piping. Re-insulate boiler shells. Reinstall outer sheet metal wrap and exhaust ductwork to their original configuration. Renew all associated gaskets and fasteners. Renew all disturbed piping insulation and thermal blankets. Renew the following valves:
· 1 ¼” gate valve
· 1 ¼” solenoid valve
· 1 ¼” check valve.
3.9 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 0000_STD, paragraph titled “General preservation requirements”; and in accordance with COMDTINST M10360.3, Appendix A (Cutters and Boats Exterior Painting Systems) and Appendix B (Cutters and Boats Interior Painting Systems), respectively, and as applicable.
3.10 System tests. The Contractor shall demonstrate the proper operation of the new boiler system in accordance with manufacturer's operating instructions. Adjust the burners in accordance with manufacturer's instructions. Final acceptance will be based on the successful operation of the newly installed system. Verify proper operation of all components. Submit a CFR.
4. NOTES
4.1 Ship check. Due to numerous interferences and limited accessibility for accomplishment of the designated work, all prospective bidders are strongly encouraged to perform a ship check prior to submitting bids.
4.2 Removal access. Historically, this work has been facilitated by cutting accesses through the deck on the port and starboard sides.
| ii |
| (Rev-0) |
Other files
| File | Type | Posted |
|---|---|---|
| FAR provisions and clauses.doc | DOC document | |
| SOS S BLANK.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .