Amend 0001 - Attachment 1 pages 5-12.pdf
PDF 39 KB Posted
- Solicitation number
- HSCG80-11-Q-P45045
About this file
Attachment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| SWORDFISH_BLUE_SHARK_SEA_DEVIL_(WPB_87)_DD_JLS_11D0.doc | DOC document | |
| HSCG80-11-Q-P45045 Multi-cutter RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG80-11-Q-P45045 PAGE 5 OF 47
USCGC SWORDFISH (WPB-87358), USCGC BLUE SHARK (WPB-87360),
& USCGC SEA DEVIL (WPB-87368) DRYDOCK REPAIRS
SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC SWORDFISH (WPB-87358) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION
UNIT
PRICE UNIT QTY
EXTENDED
PRICE
1-D Perform Ultrasonic Thickness Measurements 250 SHOTS 1 2-O Perform Ultrasonic Thickness Measurements 25 SHOTS 10
3-O Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) 8 LF 2
4-D Clean and Inspect Dirty Oil Tank JOB 1 5-D Clean and Inspect Oily Water Tank JOB 1 6-D Clean and Inspect Fuel Service Tanks JOB 1 7-D Clean and Inspect Grey Water Tank JOB 1 8-D Clean and Inspect Sewage Tank JOB 1 9-D Clean Grey Water Piping System JOB 1 10-D Clean Sewage Piping System JOB 1 11-D Inspect Pilothouse Deck JOB 1 12-D Inspect RHIB Notch Skid Pads JOB 1 13-O Renew RHIB Notch Skid Pad Studs 10 STUDS 5 14-O Realign Main Engine/Reduction Gear EA 2 15-D Remove, Inspect, and Reinstall Propeller Shafts JOB 1 16-O Repair Shaft EA 2 17-O Straighten Shaft EA 2 18-O Renew Intermediate Water-Lubricated Shaft Bearing EA 2 19-O Renew Aft Water-Lubricated Shaft Bearing EA 2 20-O Renew Intermediate Bearing Carrier EA 2 21-O Renew Aft Bearing Carrier EA 2 22-D Remove, Inspect, and Reinstall Propellers JOB 1 23-O Perform Minor Repair and Recondition of Propeller EA 2 24-D Renew Depth Indicating Transducer JOB 1
HSCG80-11-Q-P45045 PAGE 6 OF 47
PRICE UNIT QTY
EXTENDED
PRICE
25-D Renew Sea Valves and Inspect Associated Piping and Strainers JOB 1 26-D Remove, Inspect, and Reinstall Rudder Assemblies JOB 1
27-D Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers JOB 1
28-O Preserve Underwater Body – “Partial” JOB 1 NSP 29-O Preserve Underwater Body – “100%” JOB 1 30-O Preserve Stern Tubes JOB 1 31-D Modify and Renew Cathodic Protection System JOB 1 32-O Renew Transducer Fairing EA 2 33-D Routine Drydocking JOB 1 34-D Provide Temporary Logistics JOB 1 35-D Modify and Preserve the Forepeak (EC 087-A-033) JOB 1 38-D Reseal Wet Decks JOB 1 40-D Clean HVAC System Ducting JOB 1 43-O Renew Port Main Diesel Engine Exhaust Concentric Ring JOB 1
44-O Renew Stbd Main Diesel Engine Exhaust Concentric Ring SWORDFISH & BLUE SHARK
ONLY JOB 1
47-D Perform Structural Repairs – Two Person State Room (2-6-2-L) SWORDFISH ONLY JOB 1 48-D Repair Hull SWORDFISH ONLY JOB 1
HSCG80-11-Q-P45045 PAGE 7 OF 47
PRICE UNIT QTY
EXTENDED
PRICE
49-D Renew Joiner Bulkheads SWORDFISH ONLY JOB 1 50-D Remove, Inspect and Reseal Window(s) SWORDFISH ONLY JOB 1 51-D Fuel Oil System, Valves, Renew SWORDFISH ONLY JOB 1 52-D Preserve Freeboard – 100% SWORDFISH & SEA DEVIL ONLY JOB 1 54-D Preserve Main Deck Surfaces JOB 1 55-D Preserve Superstructure – 100% SWORDFISH & SEA DEVIL ONLY JOB 1 56-D Preserve Mast SWORDFISH & SEA DEVIL ONLY JOB 1 A-O Composite Labor Rate HOUR 250 B-D GFP Report NSP EA 1 NSP Z-O Laydays DAY 5
HSCG80-11-Q-P45045 PAGE 8 OF 47
USCGC BLUE SHARK (WPB-87360) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION
UNIT
PRICE UNIT QTY
EXTENDED
PRICE
1-D Perform Ultrasonic Thickness Measurements 250 SHOTS 1 2-O Perform Ultrasonic Thickness Measurements 25 SHOTS 10 3-O Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) 8 LF 2 4-D Clean and Inspect Dirty Oil Tank JOB 1 5-D Clean and Inspect Oily Water Tank JOB 1 6-D Clean and Inspect Fuel Service Tanks JOB 1 7-D Clean and Inspect Grey Water Tank JOB 1 8-D Clean and Inspect Sewage Tank JOB 1 9-D Clean Grey Water Piping System JOB 1 10-D Clean Sewage Piping System JOB 1 11-D Inspect Pilothouse Deck JOB 1 12-D Inspect RHIB Notch Skid Pads JOB 1 13-O Renew RHIB Notch Skid Pad Studs 10 STUDS 5 14-O Realign Main Engine/Reduction Gear EA 2 15-D Remove, Inspect, and Reinstall Propeller Shafts JOB 1 16-O Repair Shaft EA 2 17-O Straighten Shaft EA 2 18-O Renew Intermediate Water-Lubricated Shaft Bearing EA 2 19-O Renew Aft Water-Lubricated Shaft Bearing EA 2 20-O Renew Intermediate Bearing Carrier EA 2 21-O Renew Aft Bearing Carrier EA 2 22-D Remove, Inspect, and Reinstall Propellers JOB 1
HSCG80-11-Q-P45045 PAGE 9 OF 47
USCGC BLUE SHARK (WPB-87360) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION
UNIT
PRICE UNIT QTY
EXTENDED
PRICE
24-D Renew Depth Indicating Transducer JOB 1 25-D Renew Sea Valves and Inspect Associated Piping and Strainers JOB 1 26-D Remove, Inspect, and Reinstall Rudder Assemblies JOB 1
27-D Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers JOB 1
28-O Preserve Underwater Body – “Partial” JOB 1 NSP 29-O Preserve Underwater Body – “100%” JOB 1 30-O Preserve Stern Tubes JOB 1 31-D Modify and Renew Cathodic Protection System JOB 1 32-O Renew Transducer Fairing EA 2 33-D Routine Drydocking JOB 1 34-D Provide Temporary Logistics JOB 1 35-D Modify and Preserve the Forepeak (EC 087-A-033) JOB 1 38-D Reseal Wet Decks JOB 1 39-D Renew Wet Decks BLUE SHARK ONLY JOB 1 40-D Clean HVAC System Ducting JOB 1 43-O Renew Port Main Diesel Engine Exhaust Concentric Ring JOB 1
44-O Renew Stbd Main Diesel Engine Exhaust Concentric Ring SWORDFISH & BLUE
SHARK ONLY JOB 1
46-D Renew Port Soft Patch Gasket BLUE SHARK ONLY JOB 1 53-D Preserve Freeboard Surfaces – Partial BLUE SHARK ONLY JOB 1 54-D Preserve Main Deck Surfaces JOB 1 A-O Composite Labor Rate Hour 260
Z-O Laydays Day 5
HSCG80-11-Q-P45045 PAGE 10 OF 47
USCGC SEA DEVIL (WPB-87368) DRYDOCK AVAILABILITY 2011
ITEM DESCRIPTION
UNIT
PRICE UNIT QTY
EXTENDED
PRICE
1-D Perform Ultrasonic Thickness Measurements
SHOTS 1
2-O Perform Ultrasonic Thickness Measurements 25 SHOTS 10
3-O Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) 8 LF 2
4-D Clean and Inspect Dirty Oil Tank JOB 1 5-D Clean and Inspect Oily Water Tank JOB 1 6-D Clean and Inspect Fuel Service Tanks JOB 1 7-D Clean and Inspect Grey Water Tank JOB 1 8-D Clean and Inspect Sewage Tank JOB 1 9-D Clean Grey Water Piping System JOB 1 10-D Clean Sewage Piping System JOB 1 11-D Inspect Pilothouse Deck JOB 1 12-D Inspect RHIB Notch Skid Pads JOB 1 13-O Renew RHIB Notch Skid Pad Studs 10 STUDS 5 14-O Realign Main Engine/Reduction Gear EA 2 15-D Remove, Inspect, and Reinstall Propeller Shafts JOB 1 16-O Repair Shaft EA 2 17-O Straighten Shaft EA 2 18-O Renew Intermediate Water-Lubricated Shaft Bearing EA 2 19-O Renew Aft Water-Lubricated Shaft Bearing EA 2 20-O Renew Intermediate Bearing Carrier EA 2 21-O Renew Aft Bearing Carrier EA 2 22-D Remove, Inspect, and Reinstall Propellers JOB 1
HSCG80-11-Q-P45045 PAGE 11 OF 47
PRICE UNIT QTY
EXTENDED
PRICE
24-D Renew Depth Indicating Transducer JOB 1 25-D Renew Sea Valves and Inspect Associated Piping and Strainers JOB 1 26-D Remove, Inspect, and Reinstall Rudder Assemblies JOB 1
27-D Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers JOB 1
28-O Preserve Underwater Body – “Partial” JOB 1 NSP 29-O Preserve Underwater Body – “100%” JOB 1 30-O Preserve Stern Tubes JOB 1 31-D Modify and Renew Cathodic Protection System JOB 1 32-O Renew Transducer Fairing EA 2 33-D Routine Drydocking JOB 1 34-D Provide Temporary Logistics JOB 1 35-D Modify and Preserve the Forepeak (EC 087-A-033) JOB 1
36-D Install New Anchor Windlass, RHIB Recovery Winch, and Associated HPU (EC 087-
A-023) SEA DEVIL ONLY JOB 1
37-D Install AFFF Bilge Sprinkler System (EC 087-A-024) SEA DEVIL ONLY JOB 1 38-D Reseal Wet Decks JOB 1 40-D Clean HVAC System Ducting JOB 1 41-D Clean and Inspect Potable Water Tanks SEA DEVIL ONLY JOB 1 42-D Renew Stbd Main Diesel Engine Exhaust Concentric Ring SEA DEVIL ONLY JOB 1 43-O Renew Port Main Diesel Engine Exhaust Concentric Ring JOB 1 45-D Clean and Inspect Raw Water Manifold and Associated Piping SEA DEVIL ONLY JOB 1
HSCG80-11-Q-P45045 PAGE 12 OF 47
PRICE UNIT QTY
EXTENDED
PRICE
52-D Preserve Freeboard – 100% SWORDFISH & SEA DEVIL ONLY JOB 1 54-D Preserve Main Deck Surfaces JOB 1 55-D Preserve Superstructure – 100% SWORDFISH & SEA DEVIL ONLY JOB 1 56-D Preserve Mast SWORDFISH & SEA DEVIL ONLY JOB 1 A-O Composite Labor Rate Hour 400
Z-O Laydays Day 5
File details come from the government source that posted it. Updated .