Bluefin R0 Blank est.xls
XLS spreadsheet 29 KB Posted
- Attached to
- USCGC BLUEFIN (WPB-87318) 11 DRYDOCK REPAIRS
- Solicitation number
- HSCG80-11-Q-P45026
About this file
SCHEDULE OF SUPPLIES/SERVICES FOR USCGC BLUEFIN
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ BLUEFIN DD 09-01-10.doc | DOC document | |
| BLUEFIN_87wpb_DD_DRB_11R1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| USCGC BLUEFIN (WPB-87318) DRYDOCK AVAILABILITY 2011 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Perform Ultrasonic Thickness Measurements (D) | 250 SHOTS | 1 | ||
| 2-O | Perform Ultrasonic Thickness Measurements (O) | 25 SHOTS | 10 | ||
| 3-O | Perform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) (O) | 8 LF | 2 | ||
| 4-D | Clean and Inspect Dirty Oil Tank (D) | JOB | 1 | ||
| 5-D | Clean and Inspect Oily Water Tank (D) | JOB | 1 | ||
| 6-D | Clean and Inspect Fuel Service Tanks (D) | JOB | 1 | ||
| 7-D | Clean and Inspect Grey Water Tank (D) | JOB | 1 | ||
| 8-D | Clean and Inspect Sewage Tank (D) | JOB | 1 | ||
| 9-D | Clean Grey Water Piping System (D) | JOB | 1 | ||
| 10-D | Clean Sewage Piping System (D) | JOB | 1 | ||
| 11-D | Inspect Pilothouse Deck (D) | JOB | 1 | ||
| 12-D | Inspect RHIB Notch Skid Pads (D) | JOB | 1 | ||
| 13-O | Renew RHIB Notch Skid Pad Studs (O) | 10 STUDS | 5 | ||
| 14-O | Realign Main Engine/Reduction Gear (O) | EA | 2 | ||
| 15-D | Remove, Inspect, and Reinstall Propeller Shafts (D) | JOB | 1 | ||
| 16-O | Repair Shaft (O) | EA | 2 | ||
| 17-O | Straighten Shaft (O) | EA | 2 | ||
| 18-O | Renew Intermediate Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 19-O | Renew Aft Water-Lubricated Shaft Bearing (O) | EA | 2 | ||
| 20-O | Renew Intermediate Bearing Carrier (O) | EA | 2 | ||
| 21-O | Renew Aft Bearing Carrier (O) | EA | 2 | ||
| 22-D | Remove, Inspect, and Reinstall Propellers (D) | JOB | 1 | ||
| 23-O | Perform Minor Repair and Recondition of Propeller (O) | EA | 2 | ||
| 24-D | Renew Depth Indicating Transducer (D) | JOB | 1 | ||
| 25-D | Renew Sea Valves and Inspect Associated Piping and Strainers (D) | JOB | 1 | ||
| 26-D | Remove, Inspect, and Reinstall Rudder Assemblies (D) | JOB | 1 | ||
| 27-D | Remove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D) | JOB | 1 | ||
| 28-O | Preserve Underwater Body – “Partial” (O) | JOB | 1 | NSP | |
| 29-O | Preserve Underwater Body – “100%” (O) | JOB | 1 | ||
| 30-O | Preserve Stern Tubes (O) | JOB | 1 | ||
| 31-D | Modify and Renew Cathodic Protection System (D) | JOB | 1 | ||
| 32-O | Renew Transducer Fairing (O) | EA | 2 | ||
| 33-D | Routine Drydocking (D) | JOB | 1 | ||
| 34-D | Provide Temporary Logistics (D) | JOB | 1 | ||
| 35-D | Modify and Preserve the Forepeak (EC 087-A-033) (D) | JOB | 1 | ||
| 36-D | Preserve Bilge Surfaces in the Lazarette (D) | JOB | 1 | ||
| 37-O | Preserve Main Deck Surfaces (O) | JOB | 1 | ||
| 38-D | Preserve Bilge Surfaces in the Engine Room - Partial (D) | JOB | 1 | ||
| 39-O | Preserve Bulkhead in the Lazarette - Partial (O) | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 220 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(&D)
Page &P of &N
File details come from the government source that posted it. Updated .