Bluefin R0 Blank est.xls

XLS spreadsheet 29 KB Posted

Attached to
USCGC BLUEFIN (WPB-87318) 11 DRYDOCK REPAIRS
Solicitation number
HSCG80-11-Q-P45026
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES FOR USCGC BLUEFIN

View the file

Other files

File Type Posted
RFQ BLUEFIN DD 09-01-10.doc DOC document
BLUEFIN_87wpb_DD_DRB_11R1.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC BLUEFIN (WPB-87318) DRYDOCK AVAILABILITY 2011
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements (D)250 SHOTS1
2-OPerform Ultrasonic Thickness Measurements (O)25 SHOTS10
3-OPerform Hull and Structural Plating Repairs in Various Compartments – Eroded Welds (Steel) (O)8 LF2
4-DClean and Inspect Dirty Oil Tank (D)JOB1
5-DClean and Inspect Oily Water Tank (D)JOB1
6-DClean and Inspect Fuel Service Tanks (D)JOB1
7-DClean and Inspect Grey Water Tank (D)JOB1
8-DClean and Inspect Sewage Tank (D)JOB1
9-DClean Grey Water Piping System (D)JOB1
10-DClean Sewage Piping System (D)JOB1
11-DInspect Pilothouse Deck (D)JOB1
12-DInspect RHIB Notch Skid Pads (D)JOB1
13-ORenew RHIB Notch Skid Pad Studs (O)10 STUDS5
14-ORealign Main Engine/Reduction Gear (O)EA2
15-DRemove, Inspect, and Reinstall Propeller Shafts (D)JOB1
16-ORepair Shaft (O)EA2
17-OStraighten Shaft (O)EA2
18-ORenew Intermediate Water-Lubricated Shaft Bearing (O)EA2
19-ORenew Aft Water-Lubricated Shaft Bearing (O)EA2
20-ORenew Intermediate Bearing Carrier (O)EA2
21-ORenew Aft Bearing Carrier (O)EA2
22-DRemove, Inspect, and Reinstall Propellers (D)JOB1
23-OPerform Minor Repair and Recondition of Propeller (O)EA2
24-DRenew Depth Indicating Transducer (D)JOB1
25-DRenew Sea Valves and Inspect Associated Piping and Strainers (D)JOB1
26-DRemove, Inspect, and Reinstall Rudder Assemblies (D)JOB1
27-DRemove, Inspect and Reinstall Stern Launch Door, and Inspect Door Pivot Pins, Bushings, and Washers (D)JOB1
28-OPreserve Underwater Body – “Partial” (O)JOB1NSP
29-OPreserve Underwater Body – “100%” (O)JOB1
30-OPreserve Stern Tubes (O)JOB1
31-DModify and Renew Cathodic Protection System (D)JOB1
32-ORenew Transducer Fairing (O)EA2
33-DRoutine Drydocking (D)JOB1
34-DProvide Temporary Logistics (D)JOB1
35-DModify and Preserve the Forepeak (EC 087-A-033) (D)JOB1
36-DPreserve Bilge Surfaces in the Lazarette (D)JOB1
37-OPreserve Main Deck Surfaces (O)JOB1
38-DPreserve Bilge Surfaces in the Engine Room - Partial (D)JOB1
39-OPreserve Bulkhead in the Lazarette - Partial (O)JOB1
A-OComposite Labor RateHour220
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(&D)

Page &P of &N

File details come from the government source that posted it. Updated .