SPEC for Nantucket 1316_DD_FGK_10R0.pdf

PDF 384 KB Posted

Attached to
DRYDOCK USCGC NANTUCKET Federal contract opportunity
Solicitation number
HSCG80_09_Q_3FAY82
Issued by
Department of Homeland Security US Coast Guard

About this file

SPECIFICATION FOR CGC NANTUCKET

View the file

Other files for this federal contract opportunity

Other files attached to DRYDOCK USCGC NANTUCKET, newest first.
File Type Posted
Schedule Supplies_Services Nantucket 1316_DD_FGK_10ER0_BLANK.pdf PDF
Nantucket_RFQ.DOC DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(June 8, 2009/ Rev-0)

USCGC NANTUCKET (WPB-1316)

110 FOOT A CLASS PATROL BOAT

SPECIFICATION FOR DRYDOCK REPAIRS

Developed By:

CWO F.G.Kiesel

Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102

USCGC NANTUCKET (WPB-1316) DRYDOCK AVAILABILITY 2010

Page i (Rev-0)

TABLE OF CONTENTS

Work Item Title Page

List of Sketches iv

Revisions Record v

List of Applicable References vi

List of Government-furnished Property xiii

List of Critical Inspection Items xv

Specification Feedback xvi

General Requirements 1

1 Routine Drydocking 9

2 Provide Temporary Logistics 14

3 Clean and Inspect Fuel Service Tanks 16

4 Clean and Inspect Fuel Stowage and Overflow Tanks 19

5 Clean and Inspect Oil and Oily Waste Tanks 22

6 Clean and Inspect Sewage Collection and Holding Tanks 24

7 Clean and Inspect Grey Water Collection and Holding Tanks 27

8 Clean Sewage Piping System 30

9 Clean Grey Water Piping System 34

10 Clean and Disinfect Potable Water Tanks 38

11 Preserve and Disinfect Potable Water Tanks - 100% 41

12 Preserve and Disinfect Potable Water Tanks - Partial 44

13 Preserve Sewage Collection and Holding Tanks - 100% 47

Page ii (Rev-0)

14 Preserve Grey Water Collection and Holding Tanks – 100% 49

15 Renew Floating Deck System in Galley and Mess Deck 51

16 Preserve Forward Void 56

17 Renew Main Diesel Engine (s) 58

18 Clean and Inspect Heat Exchangers 63

19 Inspect MDE Exhaust System 67

20 Overhaul Stabilizing Fins 71

21 Overhaul and Renew Sea Valves 76

22 Overhaul and Renew Firemain Valves 79

23 Remove, Inspect, and Reinstall Propellers 82

24 Remove, Inspect, and Reinstall Propeller Shafts 85

25 Overhaul Mechanical Shaft Seal Assemblies 92

26 Renew Water-Lubricated Propeller Shaft Bearings 94

27 Inspect and Maintain Cathodic Protection System 97

28 Remove, Inspect and Reinstall Rudder Assemblies 100

29 Overhaul Steering Gear Components 105

30 Renew Depth Indicating Transducer 110

31 Renew Speed Doppler 113

32 Preserve Underwater Body - "100%" 116

33 Renew Capastic Fairing 119

34 Preserve Stern Tubes 121

35 Preserve Bilge Surfaces In Various Locations 123

36 Prepare Weather Deck Surfaces 126

37 Renew Vaneaxial Fan and Motor Assemblies 129

38 Clean Engine Room Surfaces In Various Locations 132

Page iii (Rev-0)

39 Renew Pilothouse Window 134

40 Repair Damage Control Locker Deck 137

41 Install Gooseneck Vent 139

42 Perform Ultrasonic Thickness Measurements 141

43 Perform Air Test of Interior Compartments 143

44 Perform Aluminum Hull and Structural Repairs - 1/4" Plate 145

45 Perform Aluminum Hull and Structural Repairs - 5/16" Plate 146

46 Perform Hull and Structural Plating Repairs -Crack (Aluminum) 147

47 Perform Hull and Structural Plating Repairs - Eroded Weld (Aluminum) 148

48 Perform Hull and Structural Plating Repairs - Overlay Welding (Aluminum) 149

49 Perform Hull and Structural Plating Repairs - Crack (Steel) 150

50 Perform Hull and Structural Plating Repairs - Eroded Welds (Steel) 151

51 Perform Hull and Structural Plating Repairs - Overlay Welding (Steel) 152

52 Perform Hull and Structural Plating Repairs - Corrugated Plate (4.0-Pound) 153

53 Perform Steel Hull and Structural Plating Repairs (5-Pound) 154

54 Perform Steel Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound) 156

55 Perform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound) 158

56 Perform Steel Structural Member Repairs -Steel Studs 160

Page iv (Rev-0)

List of Sketches

Work Item Sketch Number Page

This section is not applicable to this package.

Page v (Rev-0)

Revisions Record

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.

Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK ITEM# CHANGES MADE

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Page vi (Rev-0)

List of Applicable References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:

http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.

Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.

Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.

FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS

Federal Specification (Fed Spec), MMM-A-121, Oct 1999, Adhesive Bonding Vulcanized Synthetic Rubber to Steel

MIL-A-24456, Jun 1979, Adhesive for Plastic-Vibration Damping Tile

MIL-PRF-17672, May 1995, Hydraulic Fluid, Petroleum, Inhibited

MIL-STD-2148, Oct 1989, Vibration Damping Materials

DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems

Commercial Item Description (CID) A-A-59588, Jul 2005, Rubber Silicone

OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS

DOCUMENTS

Page vii (Rev-0)

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 3141_STD, 2004 Edition, Overhaul Electrical Rotating Machines

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics

DRAWINGS

Coast Guard Drawing 110 WPB 085-002, Rev-, Docking Plan

Coast Guard Drawing 110 WPB 085-010, Rev B, Docking Plan, Docking/Lifting Cradle

Coast Guard Drawing 110 WPB 131-001, Rev A, Deck Construction Plan

Coast Guard Drawing 110 WPB 151-004, Rev -, Superstructure Details

Coast Guard Drawing 110 WPB 161-001, Rev A, Main Shaft Strut Details

Coast Guard Drawing 110 WPB 161-002, Rev-, Main Shaft Strut Installation

Coast Guard Drawing 110 WPB 161-003, Rev A, Intermediate Shaft Strut Details

Page viii (Rev-0)

Coast Guard Drawing 110 WPB 161-004, Rev-, Intermediate Shaft Strut Installation

Coast Guard Drawing 110 WPB 201-002, Rev A, Propulsion Configuration

Coast Guard Drawing 110 WPB 201-003, Rev-, Machinery Arrangement Plan

Coast Guard Drawing 110 WPB 233-001, Rev -, Main Engine Bolting & Pads

Coast Guard Drawing 110 WPB 233-002, Rev -, Remote Emergency Main Engine Shutdown

Coast Guard Drawing 110 WPB 243-002, Rev B, Propulsion Shafting Details

Coast Guard Drawing 110 WPB 243-005, Rev-, Shaft Locking Device

Coast Guard Drawing 110 WPB 243-006, Rev C, Propulsion Shaft Details (Partially supercedes 110 WPB 243-002, 110B WPB 243-002, and 110C WPB 243-002)

Coast Guard Drawing 110 WPB 245-004, Rev A, Propeller Details

Coast Guard Drawing 110 WPB 245-005, Rev-, Assembly of Oil Injection Equipment

Coast Guard Drawing 110 WPB 256-001, Rev A, Main Engine SW Cooling System A&D

Coast Guard Drawing 110 WPB 256-002, Rev-, Aux SW Cooling System A&D

Coast Guard Drawing 110 WPB 256-003, Rev-, Mods to SW Cooling Incidental to Install of Charge Air Cooler Diverter Valve

Coast Guard Drawing 110 WPB 256-004, Rev B, SSDG Seawater Cooling

Coast Guard Drawing 110 WPB 259-001, Rev A, Main Engine Exhaust Piping System

Coast Guard Drawing 110 WPB 259-005, Rev C, 18" Raw Water Discharge Spray Ring Assembly w/ Companion Flanges & Gaskets

Coast Guard Drawing 110 WPB 259-006, Rev D, MDE 8" Exhaust Flapper Valve Assembly (w/Companion Flanges & Gaskets)

Page ix (Rev-0)

Coast Guard Drawing 110 WPB 501-001, Rev D, Piping System Schematics

Coast Guard Drawing 110 WPB 512-001, Rev D, Habitability Vent Modifications

Coast Guard Drawing 110 WPB 528-001, Rev B, Sewage Piping Arrangement

Coast Guard Drawing 110 WPB 561-001, Rev-, Steering System Details

Coast Guard Drawing 110 WPB 561-004, Rev-, Steering System Details / Piping

Coast Guard Drawing 110 WPB 621-001, Rev-, Joiner Work Details

Coast Guard Drawing 110 WPB 633-001, Rev A, Cathodic Protection Plan and Details

Coast Guard Drawing 110 WPB 633-002, Rev-, Cathodic Protection Installation, Schematic, & Layout

Coast Guard Drawing 110 WPB 635-001, Rev-, Linings and Insulation Plan and Details

Coast Guard Drawing 110 WPB 636-001, Rev A, Noise Damping Details

Coast Guard Drawing 110B WPB 111-003, Rev G, Shell Expansion

Coast Guard Drawing 110B WPB 117-001, Rev H, Transverse Sections

Coast Guard Drawing 110C WPB 131-001, Rev A, Deck Construction Plan

Coast Guard Drawing 110C WPB 161-005, Rev E, Stern Tube Installation Details

Coast Guard Drawing 110C WPB 562-001, Rev G, Rudder Details (superceded 110 WPB 562-001)

Coast Guard Drawing 110C WPB 565-001, Rev D, Fin Stabilization System

Coast Guard Drawing 110C WPB 601-027, Rev D, Outboard Profile And Weather Decks

Page x (Rev-0)

Coast Guard Drawing FL 6713-201, Rev B, CRP-V850 Transducer (B-

14) Adapter Assembly

PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual

Coast Guard Technical Publication (TP) 2931, Oct 2002, Stabilizer Manual

Coast Guard Technical Publication (TP) 2932, SWBS 245-2, Aug 1987, Propeller Renewal Procedure

Coast Guard Technical Publication (TP) 2938, Jul 1991, SWBS 633- 1, Engelhard Industries Cathodic Protection Instruction Manual For USCG Fast Patrol Boat

Coast Guard Technical Publication (TP) 3094, Jan 2002, Manufacturer’s O&M Instruction Book, Paxman Diesels Limited

Coast Guard Technical Publication (TP) 3095, July 2005, Manufacturer’s O&M Instruction Book, Paxman Diesels Limited

Coast Guard Technical Publication (TP) 3495, May 2002, Chapter 243, Installation Duramax Shaft Seal System

Coast Guard Technical Publication (TP) 3906, Oct 2002, Ship's Steering Gear System

Coast Guard Technical Publication (TP) 3907, Oct 2002, Ship's Fin Stabilizing System

Coast Guard Technical Publication TP 3109 (625 B) WINDOWS, FIXED

Vosper Thornycroft Technical Bulletin No. 49, Jul 1992, Procedure for Fitting New Tiller Rod Eye Bearings to Actuators and Removing Redundant Grease Hose On BMS Island Class USCG Cutters

Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual

INDUSTRY STANDARDS

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water- Storage Facilities

Page xi (Rev-0)

American National Standards Institute/NSF International (ANSI/NSF) 61, 2005, Drinking Water System Components - Health Effects

American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End

American Society of Mechanical Engineers (ASME) B46.1, 2002, Surface Texture (Surface Roughness, Waviness, and Lay)

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) A 25463, 1999, Adhesive, Film Form, Metallic Structural Sandwich Construction

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) 4348, Core, 1995, Honeycomb, Aluminum Alloy, Corrosion Inhibited for Sandwich Construction 5052, 350 (177)

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller

International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power - Fluids - Method for Coding Level of Contamination by Solid Particles

Page xii (Rev-0)

ASTM International (ASTM) A572, 2007, Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM International (ASTM) A606, 2004, Standard Specification for Steel, Sheet and Strip, High-Strength, Low-Alloy

ASTM International (ASTM) B209, 2007, Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging

ASTM International (ASTM) D4174, Reapproved 2005; Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems

ASTM International (ASTM) D5363, 2003, Standard Specification for Anaerobic Single Component Adhesives

ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method

ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates

American Petroleum Institute (API) Specification 5L, 2004, Specification for Line Pipe

American Water Works Association (AWWA) C652, 2002, Disinfection of Water-Storage Facilities

Page xiii (Rev-0)

List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM MTI ITEM DESCRIPTION NSN/PN QTY

ESTIMATED

COST

($/UNIT)

1 N *Transducer cover plate N/A 1 ea. 1,500.00 17 Y Paxman Valenta Diesel Engine –

Model 16RP200M 1 ea. 368,000.00

Y Engine Mounts P/N: 5540 2 ea. 1,791.96 Y Engine Mounts P/N: 6040 2 ea. 1,791.96 N Install Kit VIKINSTALL 1 ea. 3,700.00 Y Lift Bracket & Engine Stands 1 ea. 20,000.00 19 N Port spray ring NSN: 2990-01-475-9621 1 ea. 1,584.00 N Starboard spray ring NSN: 2990-01-475-9620 1 ea. 1,584.00 N Port 8" flapper valve NSN: 4810-01-475-8648 1 ea. 2,072.00 N Starboard 8" flapper valve NSN: 4810-01-475-8415 1 ea. 2,072.00 N 18” MDE gasket kit NSN: 5330-01-475-8157 4 ea. 389.45

N 18” MDE gasket kit NSN: 5330-01-475-8169 4 ea. 312.52

N 8” exhaust gasket kit

NSN: 5330-01-475-8804

4 ea. 128.24

20 N Spherical Roller Bearing NSN: 3110-00-902-7288 2 ea. 136.00 N Spherical Bearing NSN: 3120-99-806-7289 4 ea. 167.00 N Special Bolt Trunion P/N: 3665208-A

4 ea. 135.00

N Special Bolt Tiller NSN: 5306-99-538-1451 4 ea. 126.00 N Rod Eye Trunion Bolt Nut NSN: 5315-01-485-3148 4 ea. 34.00 N Fin Spacer Bushing NSN: 3120-01-396-1724 4 ea. 81.00 N Fin Spacer Bushing NSN: 5365-99-807-4040 4 ea. 66.00 N Circlip NSN: 5365-99-902-2593 8 ea. 2.00 N Actuator Seals NSN: 5330-99-729-7570 4 sets 98.00 N Rod Eye Bearing NSN: 3120-01-377-1940 4 ea. 530.00 N Rod Eye Locknut NSN: 5310-01-468-7665 4 ea. 13.00 N Tiller Pin Nuts NSN: 5315-01-485-3148 4 ea. 34.00 Y Fin Stabilizer assembly NSN: 2040-99-726-4768 2 ea. 12,200.00 N Lower bearing bushing NSN: 3120-99-726-2345 2 ea. 900.00 23 Y Propeller, LH NSN: 2010-01-222-2440 1 ea. 23,445.00 Y Propeller, RH NSN: 2010-01-222-2441 1 ea. 22,800.00 24 N 4" Diameter x 28' Long, Aquamet-17 propulsion shaft NSN: 2010-01-445-7940 2 ea. 8,700.00

N Forward Bearing Housing NSN: 3130-01-442-2863 2 ea. 5,421.00 N *Oil Injection Equipment Kit N/A 1 set 6,000.00 25 N Shaft seal assembly kit NSN: 5330-01-497-8095 2 ea. 859.48 N **Shaft seal assembly NSN: 4320-01-497-8057 2 ea. 3,111.84

Page xiv (Rev-0)

N

Main Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5" OD x 16" Long

NSN: 3120-01-222-3927 2 ea. 200.00

N

Intermediate Shaft Strut Bearing, Bronze and rubber cutlass bearing, 4" ID x 5" OD x 16" Long

NSN: 3120-01-222-3927 2 ea. 200.00

N

Stern Tube Bearing, Bronze and Rubber cutlass bearing, 4" ID x 5" OD x 8" Long

NSN: 3120-01-238-0689 2 ea. 150.00

27 N Shaft Ground Assembly NSN: 5977-01-204-9914 2 ea. 912.00 N Reference Cell NSN: 5977-01-203-7800 2 ea. 7,300 28 Y Rudder NSN: 2040-01-223-2674 2 ea. 25,000.00 29 N Hydraulic Pump Assy. NSN: 4320-99-771-4207 2 ea. 550.00 30 N ***V850 Color Echo Sounder NSN: 5845-01-518-7245 1 ea. 1,423.41 31 N ***CELZ-SRD-331 Doppler speed log NSN: 5845-01-302-4161 1 ea. 3,255.08

36 N Non-Skid Pads 1’x 10”x 3’ P 170 ft ea. 4,018.80 N Non-Skid Pads 1’x 10”x 3’ S 170 ft ea. 4,018.80 37 N Vaneaxial fan NSN: 4140-01-394-8607 2 4,894.00 N Louvers NSN: 2040-01-486-7595 2 2,246.00 39 N Counterbalance aluminum window

CC-1038

K-322-C Item-D 2 ea. 2,359.00

N Fixed Windows K-325-FN Item-E 4 ea. 448.00 N Fixed Windows KN-325-FN Item-C 7 ea. 2,279.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).

Page xv (Rev-0)

List of Critical Inspection Items

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):

Work Item Title

15 Renew Floating Deck System in Galley and Mess Deck

20 Overhaul Stabilizing Fins

28 Remove, Inspect and Reinstall Rudder Assemblies

39 Renew Pilothouse Window

42 Perform Ultrasonic Thickness Measurements

43 Perform Air Test of Interior Compartments

Page xvi (Rev-0)

Specification Feedback

The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.

All feedback will be reviewed, evaluated, and responded to in a timely manner.

If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:

http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm

If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:

http://www.uscg.mil/mlclant/vdiv/specfeedback.asp

Page xvii (Rev-0)

PC_110A_WPB

(22 Jan 2007)

Principal Characteristics

110’(A CLASS) PATROL BOAT

Length Overall 113’0”

Depth (main deck at side to baseline) 10’ 0-1/2”

Maximum Beam 21’ 3”

Height of Highest Projection (above baseline) 54' 11 3/16"

Frame Spacing various

Full Load Draft 6’ 5-3/4”

Full Load Displacement 165.1 long tons

Shore Tie Voltage Requirements 450VAC 400A 3PH 60HZ ungrounded

PROPELLER / SHAFT

Number of Propellers 2

Number of Blades per Propeller 5

Diameter of Propeller 49.6”

Pitch 61.4”

Revolutions per Minute (RPM) N/A

Shaft Diameter 4”

Page 1 (Rev-0)

00000_DLA_FLT (23 Oct 2008)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

1.2 Government-furnished property.

None.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements

Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.

NOTICE!

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor

shall provide fire watch personnel and equipment.

3.3 Welding and brazing requirements. The Contractor shall

perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.

Page 2 (Rev-0)

3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.

3.5 Small boat storage. When a small boat Rigid Hull

Inflatable (RHI) boat) is removed as interference to Contractor-work, the Contractor shall provide a suitable pier side storage cradle, for safely storing said boat.

3.5.1 Cradle design. Ensure that the temporary cradle meets

the following criteria:

1. Structure is templated from the geometry and arrangement of the contact support areas of the existing cradle onboard the vessel, to provide same or more support area as that which is provided by the existing cradle.

2. Arrangement will allow ship's force to perform maintenance on the small boat, without modification of the cradle.

3. Structure is manufactured using the most economical methods and materials available, and is capable of supporting the full weight of the small boat under normal conditions experienced during routine maintenance.

4. Contact surfaces are no harder or rougher than the contact surfaces for existing cradle onboard the vessel.

3.5.2 Boat accessibility. Ensure the storage is located in the vicinity of the vessel, and is unrestricted, to allow for ship's force to complete maintenance during normal working hours for the entire performance period.

3.5.3 Boat protection. Provide full protection that can be

safely and completely secured when the small boat is left unattended (e.g. watertight cover, storage in a warehouse or shop, etc.), in addition to isolating the boat from the elements.

3.5.4 Boat transportation. Transport each small boat to its

storage area within one week of docking the vessel and back to the vessel prior to the end of the performance period.

Page 3 (Rev-0)

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may

be accessed at the following URL address:

http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.

Page 4 (Rev-0)

QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST

CHECKPOINT 1 - COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down

(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).

Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).

Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 - STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer's instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 - TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer's instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 - FINAL INSPECTION

Verify final system dry film thickness.

Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @

77 degrees F.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

CHECKPOINT 10 - RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Signature of Inspector:______________________________________________________Date:____________

Page 5 (Rev-0)

QA-2. QUALITY ASSURANCE INSPECTION FORM

ENVIRONMENTAL READINGS

(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)

DATE TIME

ENTER ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc?)

LOCATION DEW

POINT

SURFACE

TEMP.

% REL.

HUMIDITY

SIGNATURE

OF

INSPECTOR

.Signature of Inspector:__________________________________________________Date:____________

Page 6 (Rev-0)

QA-3 QUALITY ASSURANCE INSPECTION FORM

SURFACE PROFILE LOG

Vessel Name And Hull Number:__________________________________________________

Work Item Title:_______________________________________________________________

Location Of Work (Including Frame Numbers):_____________________________________

Area (Square Feet):_____________

Surface Preparation Method:_____________________________________________________

Abrasive Manufacturer And Size:_________________________________________________

Degreasing Method Used:________________________________________________________

Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________

Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________

Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.

Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.

AVERAGE MILS

(IAW ASTM D4417,

METHOD C)

Place Surface Profile Replica Tape Here

Reading:__________ mils

• Place Surface Profile Replica Tape Here

Date and Time:__________________________________________________

Location of Surface Profile Measurements:___________________________________________________________

Signature of Inspector:____________________________________________________________________________

Page 7 (Rev-0)

QA-4. QUALITY ASSURANCE INSPECTION FORM

SURFACE SOLUBLE SALT CONDUCTIVITY LOG

Vessel Name and Hull Number:__________________________________________________

Work Item Title:_______________________________________________________________

Location of Work (including frame numbers):_______________________________________

Area (square feet):____________

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm)

Date and Time:_________________________________________

Signature of Inspector:___________________________________

Page 8 (Rev-0)

QA-5. QUALITY ASSURANCE DATA FORM

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2

(Use one sheet for each sequence)

Vessel Name and Hull Number:__________________________________________________

Work Item Title:______________________________________________________________

Coating Manufacturer:_________________________________________________________

Product Name:________________________________________________________________

Batch Number:________________________________________________________________

Induction Time:_______________________________________________________________

Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________

DFT

MEASUREMENT

NUMBER

LOCATION OF READINGS MEASURED DFT

Application Method (Airless, Conventional Spray, Rolled):____________________

Average DFT: __________________________________________________________

Date and Time: _________________________________________________________

Signature of Inspector: ___________________________________

Page 9 (Rev-0)

86340_ADB_FLT (18 Sept 2008) 110A (23 Sept 2008)

WORK ITEM 1: Routine Drydocking

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to drydock and undock the cutter, and perform various drydocking-related inspections and tests.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY

ESTIMATED

COST

($/UNIT)

N *Transducer cover plate N/A 1 ea. 1,500.00

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking

Coast Guard Drawing 110 WPB 085-002, Rev-, Docking Plan

Coast Guard Drawing 110 WPB 085-010, Rev B, Docking Plan, Docking/Lifting Cradle

3. REQUIREMENTS

3.1 General. The Contractor shall drydock and undock the

cutter, in accordance with Std Spec 8634_STD, Appendix D (Requirements for 110 WPB Lifting/Cradle/Blocking), using a cradle built in accordance with Coast Guard Drawings 110 WPB 085-010 and 110 WPB 085-002.

Page 10 (Rev-0)

3.2 Cutter Conditions. The Contractor shall use the below-

listed information for purposes of performing calculations, as described in paragraph 20.2 of Appendix B of Std Spec 8634_STD.

(See Note 4.4 (Cutter characteristics)). The Contractor shall be responsible for any change to the cutter's loading condition necessary, for drydocking, to meet the capability of the Contractor's dock.

• Displacement (LT): 124.2..

• VCG (FT ABL): 9.73.

• LCG (FT aft/fwd amidships): 6.99 aft

• Length of supported keel (FT): NA

3.3 Blocking position. The Contractor shall arrange keel and

side blocks, as shown on the vessel's docking plan, to facilitate docking of the vessel in blocking position No. 1.

Ensure that the minimum keel block height is 18 inches above the docking facility deck.

3.4 Routine work.

3.4.1 The Contractor shall perform the below-designated routine drydocking work, in accordance with Std Spec 8634_STD, Appendix A (Requirements for Routine Drydocking Work). (See Note 4.3 (Paragraph number relationships)). Follow the timeline for work completion and inspection report submission, as specified in Std Spec, 8634_STD, Appendix A, paragraph 20.2 (Inspections and repair work).

SUBSECTION TITLE

20.1 Underwater hull survey.

20.4 Stern tube and strut bearing

inspection.

20.7 Void inspection.

20.8 Zinc anode inspection.

3.4.2 The Contractor shall be aware that the Coast Guard

Underwater Hull Inspection Board (UWHIB) will recommend the extent of underwater body coating system preservation required, based on the conditions found during the underwater hull survey.

3.5 Hull cleaning - removal of marine growth. The Contractor

shall start cleaning the hull within four hours after the vessel has been lifted, to facilitate marine growth removal. Complete all cleaning operations within 24 hours after the vessel has been lifted.

Page 11 (Rev-0)

3.6 Immediate work. The Contractor shall perform the following work, within 24 hours after the lifting of the vessel.

3.6.1 Temporary protective coverings. As soon as practicable

after drydocking and underwater body surface cleaning, install protective coverings, over zinc anodes, hull fairing materials, rudder bearings, stern tube and strut bearings, fin stabilizer seals, all exterior deck drains and all overboard discharges.

Wrap all bearings and seals immediately after the vessel is drydocked to prevent entry of debris, abrasives, and paint during cleaning, surface preparation, and painting. Insert soft caulking material into the open ends of rudder and shaft stave bearings to prevent entry of grit or other foreign material.

NOTICE!

Do not remove protective covers except for inspection or accomplishing specific work items.

3.6.2 Overboard discharge channeling and plugging. Place drain channels in overboard discharges in use to direct discharges away from the hull. Provide and install wooden plugs or coverings in sea chest spool pieces and overboard discharges not in use to prevent entry of sandblast grit or paint.

3.7 Allowable block timber stresses. The Contractor shall use information contained in the below table, in place of that which is provided in paragraph 20.5.1 (Allowable block timber stresses) of Appendix B, in Std Spec 86340_STD.

WOOD PROPERTIES

Block Material

Permissible Compressive Stress Perpendicular to the grain (psi)

Permissible Compressive Stress Parallel to the grain (psi)

Proportional limit Perpendicular to the grain (psi)

SOFTWOOD

Douglas Fir 400 1400 800 Yellow Pine 300 900 700

HARDWOOD

Red & White Oak 600 1300 1300

3.8 Fluid offload and disposal. The Contractor shall empty all tanks in order to fulfill the drydock requirements shown on Coast Guard Drawing 110 WPB 085-002. Dispose of all fluids in accordance with Federal, State, and local regulations.

3.8.1 Fuel. Remove and dispose of up to 5000 gallons of fuel

from the vessel.

Page 12 (Rev-0)

3.8.2 Dirty oil and oily water. Remove and dispose of up to

155 gallons of dirty oil and up to 155 gallons of oily water from the vessel.

3.8.3 Sewage and grey water. Remove and dispose of up to 500

gallons of sewage and up to 250 gallons of grey water from the vessel..

NOTICE!

The Contractor shall be aware of the requirement in the referenced Docking Plan, which states that CUTTER SHALL BE DOCKED WITH ALL TANKS EMPTY. Normal operational practice of cutters is to operate at a minimum 75% fuel capacity during hurricane season and 50% off season.

4. NOTES

4.1 Drydock terms. As used in these specifications, all

references to drydock facilities include graving drydocks, floating drydocks, marine railways, building ways or vertical lifts.

4.2 Arrival conditions. The Engineering Petty Officer (EPO)

will advise the Contractor of the actual tank and draft readings when the vessel arrives, and will discuss with the Contractor any ballast requirements necessary to accommodate the vessel draft and trim.

4.3 Paragraph number relationships. The paragraph number for

each subsection listed herein relates directly to identical sub-paragraph numbers in Std Spec 8634_STD.

4.4 Cutter Characteristics. The data shown does not represent the arrival displacement or docking displacement of the cutter.

4.5 Cradles. Many of the cradles used to dock the 110's were

built to the early drawing 085-002. The newer cradles have been built to 085-010. The drawings show minor variations in dimensions. It should be noted that while the Standard Spec calls for the cradle to be built just to 085-010, a cradle built to 085-002 is acceptable.

4.6 Tank information. The following are the tanks that require fluid offload along with all relevant information:

TYPE OF TANK LOCATION CAPACITY

(GALLONS)

Page 13 (Rev-0)

Fuel 3-11-1-F 1,023 Fuel 3-11-2-F 1,023 Fuel 3-17-1-F 2,560 Fuel 3-17-2-F 2,560 Fuel 3-18-0-F 1,438 Fuel 3-28-1-F 1,162 Fuel 3-28-2-F 1,162 Dirty oil 3-26.5-1-F 155 Oily Water 3-26.5-2-F 155 Sewage 3-17-0-W 496 Forward Grey Water 3-21.5-0-W 225

Aft Grey Water 3-27.5-0-W 144

Potable Water 3-14-1-W 850

Potable Water 3-14-2-W 850

Page 14 (Rev-0)

86350_LNM_FLT (19 Sep 2008)

WORK ITEM 2: Provide Temporary Logistics

Contractor to provide temporary logistics.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics

3. REQUIREMENTS

3.1 General. The Contractor shall provide the below listed

temporary logistics, in accordance with Std Spec 8635_STD (see 4.1):

PARAGRAPH TITLE

3.2.1 Office space. (With refrigerator)

3.2.2 Telephone. (To include DSL or greater with long

distance line(s).

3.2.3 Parking.

3.2.4 Duty section berthing: 1 male, 1 female. Duty

section berthing shall be provided for the entire duration of the availability.

3.2.5 Light and power.

3.2.6 Compressed air.

3.2.7 Hazardous Waste Disposal.

LIQUIDS (GALLONS) SOLIDS

Empty Containers* Used Lube Oil

Paint Thinners Engine

Coolant Bilge Water

Oily Filters

Oily Rags (lbs)

1-gal 5-gal 55-gal

75 25 00 25 20 50 20 05 00 *Empty containers that previously housed hazardous materials.

Page 15 (Rev-0)

3.2.8 Heavy Lift Equipment: 2 day(s).

3.2.9 Hot-circulating water.

3.2.10 Potable water: 15 gallons per day, bulk.

3.2.11 Refuse disposal.

3.2.12 Sewage and Grey Water Disposal.

A-Team Action Item: Verify specific storage needs (e.g. Liferafts stored in Dry Stores, etc.).

3.2.14 Storage:

• Dry stores.

• Paint and flammable stores.

3.2 Additional temporary logistics. If the performance period of the contract is extended by the Contracting Officer, the contractor shall continue to provide all temporary logistics as specified herein for the extension period.

4. NOTES

4.1 Paragraph number relationships. The paragraph number for

each paragraph listed in 3.1 (General) relates directly to the identical sub-paragraph number in Std Spec 8635_STD.

Page 16 (Rev-0)

12312_DLA_FLT (10 Sept 2008) 110A WPB (27 Oct 2008)

WORK ITEM 3: Clean and Inspect Fuel Service Tanks

Contractor to clean and inspect the following tank(s):

(gallons) Fuel 3-17-1-F 2,560 Fuel 3-17-2-F 2,560

1.2 Government-furnished property.

None.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 Operational test – initial. Prior to commencement of

work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.

3.1.2 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:

• "Routine Drydocking".

Page 17 (Rev-0)

3.2 Cleaning requirements. The Contractor shall remove tank

cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.

3.3 Tank content and waste disposal. The Contractor shall

dispose of tank sludge and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.

3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

3.5 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.

Page 18 (Rev-0)

3.6 Operational test – final. After all authorized work is

complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.

4. NOTES

4.1 Equipment operation. Coast Guard personnel will operate

all shipboard machinery and equipment during all operational tests.

Page 19 (Rev-0)

12311_DLA_FLT (10 Sept 2008)

WORK ITEM 4: Clean and Inspect Fuel Stowage and Overflow Tanks

Fuel 3-11-1-F 1,023 Fuel 3-11-2-F 1,023 Fuel 3-18-0-F 1,438 Fuel* 3-28-1-F 1,162 Fuel* 3-28-2-F 1,162

*Due to the complex geometrical shape and hard accessibility, it is very difficult to perform thorough visual inspection of these tanks.

None.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 Operational test - initial. Prior to commencement of

work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.

Page 20 (Rev-0)

3.1.2 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:

• "Routine Drydocking".

3.2 Cleaning requirements. The Contractor shall remove tank

cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.

3.3 Tank content and waste disposal. The Contractor shall

dispose of tank sludge and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.

3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

3.5 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.

Page 21 (Rev-0)

3.6 Operational test - final. After all authorized work is

completed, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.

4. NOTES

4.1 Equipment operation. Coast Guard personnel will operate

Page 22 (Rev-0)

12310_DLA_FLT (10 Sept 2008)

WORK ITEM 5: Clean and Inspect Oil and Oily Waste Tanks

Dirty oil** 3-27-1-F 155 Oily Water** 3-27-2-F 155

**These tanks are preserved.

1.2 Government-furnished property.

None.

2. APPLICABLE DOCUMENTS

Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:

• "Routine Drydocking".

3.2 Cleaning requirements. The Contractor shall remove tank

cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage

Page 23 (Rev-0) the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.

3.3 Tank content and waste disposal. The Contractor shall

dispose of tank sludge and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.

3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.

• Sounding tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

3.5 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.

4. NOTES

4.1 Equipment operation. Coast Guard personnel will operate

Page 24 (Rev-0)

12319_DLA_FLT (10 Sept 2008)

110 AWPB (23 Apr 2008)

WORK ITEM 6: Clean and Inspect Sewage Collection and Holding Tanks

Contractor to clean and inspect the below designated tank(s):

TYPE OF TANK LOCATION CAPACITY

Sewage 3-17-0-W 496

2. APPLICABLE DOCUMENTS

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:

• "Routine Drydocking".

• "Clean and Inspect Grey Water Collection and Holding Tanks".

3.2 Cleaning requirements. The Contractor shall do the

following for the designated tank(s) listed in paragraph 1.1:

3.2.1 Operational test - initial. Prior to commencement of

work, the Contractor shall witness an operational pre-test (by

Page 25 (Rev-0)

Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.

3.2.2 Content removal.