USCGC ALDER (WLB-216)
225 FOOT B CLASS SEAGOING BUOY TENDER
SPECIFICATION FOR EMERGENCY DRYDOCK REPAIRS
Developed By:
Mike Soost
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(May 29, 2009/ Rev-2)
USCGC ALDER (WLB-216) EMERGENCY DRYDOCK AVAILABILITY 2009
TABLE OF CONTENTS
Work Item Title Page
List of Sketches ii
Revisions Record iii
List of Applicable References iv
List of Government-furnished Property vi
List of Critical Inspection Items vii
Specification Feedback viii
Principal Characteristics ix
General Requirements 1
1 Routine Drydocking 8
2 Renew the Controllable Pitch Propeller Hub, Blades, OD Box Seals, and Flush and Renew System Oil 12
3 Provide Temporary Logistics 19
4 Conduct CPP Performance Sea Trials 21
Page i (Rev-2)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page ii (Rev-2)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
5/28/2009 1 N/A Updated Government-furnished property table.
2, CIR
list Updated work item title to match scope of work.
2 Updated Government-furnished property table.
2 Added “Notice” to paragraph 3.3.2.
5/29/2009 2 2 Add instructions for OD Box seal renewal
(paragraph 3.3.4) and renumbered following paragraphs.
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iii (Rev-2)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Page iv (Rev-2) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
DRAWINGS
Coast Guard Drawing 225B WLB 556-008, Rev C, CPP Hydraulic System Diagram
Coast Guard Drawing 225B WLB 556-010 Rev D, CPP Hydraulics System A/D, Hull Block 940
Coast Guard Drawing 225B WLB 801-006, Rev C, Docking Drawing
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 3524, Section 245-01-01, March 2005, Instruction Manual for the Model 110251007 Controllable Pitch Propeller and Shafting System
INDUSTRY STANDARDS
Page v (Rev-2)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
1 N Transducer Cover Plate N/A 4 $150
2 Y Hub Assembly 2010-01-421-3952 1 $150,064
Y Propeller Blades (set) 2010-01-421-8904 1 $135,707
Y Blade Bolts 5306-01-410-6893 6 $2,072 Y Blade Bolt O-Rings 5330-01-408-7251 48 $4
Y Blade Seals, 23.000 ID x 0.275 Buna-N 5330-01-409-1058 6 $26
Y Hub Stat-O-Seal 0-4-4-22 12 $756
N Hex Head Screw 0.62-11x2.00LG MNL PN: K-8-3-18 12 $34
Y O-Ring 4.250 ID x
0.139 Buna-N PN: 0-2-2-5 12 $60
Y Lifting device 2010-01-F02-6825 1 $100 Y O-Ring PN: 0-10-4-14 1 $38
Y O-Ring 3.125 ID x
0.139 Buna-N PN: 0-2-1-25 1 $1
Y O-Ring 1.500 ID x
0.139 Buna-N PN: 0-2-1-13 3 $3
Y O-Ring 2.375 ID x
0.210 Buna-N PN: 0-3-1-7 24 $1
N Pellet 0.25 DIA x
0.27 LG NYL J-1-2-29 48 $1
N Pellet 0.25 DIA x
0.39 LG NYL J-1-3-5 12 $2
Y O-Ring 11.500 ID x
0.210 Buna-N O-3-2-22 1 $20
N O.D. Box Seal Kit 5330-01-522-7327 1 $1188
N Hydraulic Fluid ST 77 700 Gals $39/gal
N Fluid Filter Element P/N: KS3 4 $33.72
N Fluid Filter Element P/N: 924450 4 $22.27
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page vi (Rev-2)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
2 Renew the Controllable Pitch Propeller Hub, Blades, OD Box Seals, and Flush and Renew System Oil
Page vii (Rev-2)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page viii (Rev-2) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
PC_225 WLB
(07 Jan 2004)
Principal Characteristics
225' WLB Seagoing Buoy Tender
Length Overall 225' 9"
Depth (main deck at side to baseline) N/A
Maximum Beam 46'
Height of Highest Projection (above DWL) 84'
Frame Spacing 24" up to Fm-30 /22" from Fr-30 Forward
Full Load Draft 13'
Full Load Displacement 2000 long tons
Shore Tie Voltage Requirements N/A
PROPELLER / SHAFT
Number of Propellers 1
Number of Blades per Propeller 4
Diameter of Propeller 10'
Pitch controllable
Revolutions per Minute (RPM) 254
Shaft Diameter N/A
Page ix (Rev-2)
00000_DLA_FLT (23 Oct 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor
shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
Page 1 (Rev-2)
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
Page 2 (Rev-2) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 3 (Rev-2)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 4 (Rev-2)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 5 (Rev-2)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 6 (Rev-2)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 7 (Rev-2)
86340_KAM_FLT (11 May 2009) 225B WLB (08 May 2009)
WORK ITEM 1: Routine Drydocking
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to drydock and undock the cutter, and perform various drydocking-related inspections and tests.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST
($/UNIT)
N *Transducer cover plate N/A 4 ea. $150
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4ISR Service Center
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Drawing 225B WLB 801-006, Rev C, Docking Drawing
3. REQUIREMENTS
3.1 General. The Contractor shall drydock and undock the
cutter, in accordance with Std Spec 8634_STD, using Coast Guard Drawing 225B WLB 801-006 for guidance.
3.2 Cutter Conditions. The Contractor shall use the below-
listed information for purposes of performing calculations, as described in paragraph 20.2 of Appendix B of Std Spec 8634_STD.
(See Note 4.4 (Cutter characteristics)). The Contractor shall be responsible for any change to the cutter’s loading condition necessary, for drydocking, to meet the capability of the Contractor’s dock.
Page 8 (Rev-2)
• Displacement (LT): 1905.6
• VCG (FT ABL): 17.87
• LCG (FT aft FP): 106.29
• Length Overall: 225.792
• Length Between Perpendiculars (FT): 206.0
• Length of supported keel (FT):152.
3.3 Blocking position. The Contractor shall arrange keel and
side blocks, as shown on the vessel's docking plan, to facilitate docking of the vessel in blocking position No. 1.
Ensure that the minimum keel block height is 48 inches above the docking facility deck.
3.4 Routine work.
3.4.1 The Contractor shall perform the below-designated routine drydocking work, in accordance with Std Spec 8634_STD, Appendix A (Requirements for Routine Drydocking Work). (See Note 4.3 (Paragraph number relationships)). Follow the timeline for work completion and inspection report submission, as specified in Std Spec, 8634_STD, Appendix A, paragraph 20.2 (Inspections and repair work).
SUBSECTION TITLE
20.5 Propeller and shaft inspection.
3.5 Hull cleaning – removal of marine growth. The Contractor
shall start cleaning the hull within four hours after the vessel has been lifted, to facilitate marine growth removal. Complete all cleaning operations within 24 hours after the vessel has been lifted.
3.6 Immediate work. The Contractor shall perform the following work, within 24 hours after the lifting of the vessel.
3.6.1 Temporary protective coverings. As soon as practicable
after drydocking and underwater body surface cleaning, wrap all bearings and seals (except CPP seals) immediately after the vessel is drydocked to prevent entry of debris, abrasives, etc.
NOTICE!
Do not remove protective covers except for inspection or accomplishing specific work items.
3.6.2 Overboard discharge channeling and plugging. Place drain
Page 9 (Rev-2) channels in overboard discharges in use to direct discharges away from the hull. Provide and install wooden plugs or coverings in sea chest spool pieces and overboard discharges not in use to prevent entry of sandblast grit or paint.
3.7 Allowable block timber stresses. The Contractor shall use information contained in the below table, in place of that which is provided in paragraph 20.5.1 (Allowable block timber stresses) of Appendix B, in Std Spec 86340_STD.
WOOD PROPERTIES
Block Material
Permissible Compressive Stress Perpendicular to the grain (psi)
Permissible Compressive Stress Parallel to the grain (psi)
Proportional limit Perpendicular to the grain (psi)
SOFTWOOD
Douglas Fir 400 1400 800 Yellow Pine 300 900 700
HARDWOOD
Red & White Oak 600 1300 1300
NOTICE!
When setting keel blocks particular attention should be paid to ensure clearance around the speed log transducer and cover plate at Frames 16-20.
Fuel offloading is not mandatory to drydock the vessel.
4. NOTES
4.1 Drydock terms. As used in these specifications, all
references to drydock facilities include graving drydocks, floating drydocks, marine railways, building ways or vertical lifts.
4.2 Arrival conditions. The Engineer Officer (EO) will advise the Contractor of the actual tank and draft readings when the vessel arrives, and will discuss with the Contractor any ballast requirements necessary to accommodate the vessel draft and trim.
4.3 Paragraph number relationships. The paragraph number for
each subsection listed herein relates directly to identical sub-paragraph numbers in Std Spec 8634_STD.
Page 10 (Rev-2)
4.4 Cutter Characteristics. The data shown does not represent the arrival displacement or docking displacement of the cutter.
4.5 Keel loading. The keel loading is expected to be between 12 and 16 LT/ft.
4.6 No keel blocks shall be placed under the forward scan
sonar. A minimum of a 24-inch clearance must be maintained.
4.7 Clearances.
ITEM RUNNING WATER
ABSORPTION
THERMAL
EXPANSION MINIMUM MAX
ALLOWABLE
Stern Tube Bearing
0.060" 0.012" (after 3000- 4000 hrs)
0.004" (from 70 degs F)
0.076" 0.370"
Rudder Thordon Bearing
0.020" 0.012" (after 3000- 4000 hrs)
0.005" (from 70 degs F)
0.038" 0.218"
Page 11 (Rev-2)
S24510_225 (18 May 2009) ALDER_216 Emergency Drydock (18 May 2009)
WORK ITEM 2: Renew the Controllable Pitch Propeller Hub, Blades, OD Box Seals, and Flush and Renew System Oil
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the controllable pitch propeller hub, blades, OD box seals, and to flush and renew the CPP system oil.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PART NO. QTY
ESTIMATED
COST
($/UNIT)
Y Hub Assembly 2010-01-421-3952 1 $150,064 Y Propeller Blades (set) 2010-01-421-8904 1 $135,707 Y Blade Bolts 5306-01-410-6893 6 $2,072 Y Blade Bolt O-Rings 5330-01-408-7251 48 $4
Y Blade Seals, 23.000 ID x
0.275 Buna-N 5330-01-409-1058 6 $26
Y Hub Stat-O-Seal PN: 0-4-3-5 12 $22
N Hex Head Screw 0.62- 11x2.00LG MNL PN: K-8-3-18 12 $125
Y O-Ring 4.250 ID x 0.139 Buna-N PN: 0-2-2-5 12 $2
Y Removal/Lifting device 2010-01-F02-6825 1 $100
Y O-Ring 33.625 ID x .275 Buna-N PN: 0-10-2-14 1 $320
Y O-Ring 3.125 ID x 0.139 Buna-N PN: 0-2-1-25 1 $2
Y O-Ring 1.500 ID x 0.139 Buna-N PN: 0-2-1-13 3 $1
Y O-Ring 2.375 ID x 0.210 Buna-N PN: 0-3-1-7 24 $2
N Pellet 0.25 DIA x 0.27 LG
NYL PN: J-1-2-29 48 $1
N Pellet 0.38 DIA x 0.39 LG
NYL PN: J-1-3-5 12 $2
Y O-Ring 11.500 ID x 0.210 Buna-N PN: O-3-2-22 1 $20
N O.D. Box Seal Kit 5330-01-522-7327 1 $1188
N Hydraulic Fluid ST 77 700 Gals $39/gal
N Fluid Filter Element P/N: KS3 4 $33.72 N Fluid Filter Element P/N: 924450 4 $22.27
Page 12 (Rev-2)
*Government-loaned Property which shall be returned to the vessel upon completing the availability.
**Government-furnished property for which the Government reserves the right to provide as indicated in the work item.
***Government-furnished property which is to be supplied by either the vessel or local Electronics Maintenance Division.
2. APPLICABLE DOCUMENTS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 225B WLB 556-008, Rev C, CPP Hydraulic System Diagram
Coast Guard Drawing 225B WLB 556-010 Rev D, CPP Hydraulics System A/D, Hull Block 940
Coast Guard Technical Publication (TP) 3524, Section 245-01-01, March 2005, Instruction Manual for the Model 110251007 Controllable Pitch Propeller and Shafting System
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.3.1.2 (Bolt tightness verification).
• 3.3.2 (Hub and blade renewal).
Page 13 (Rev-2)
3.1.2 Technical Representative. The Contractor shall provide
the services of a Technical Representative (Tech Rep), who is familiar with the Bird Johnson CPP system, and authorized by the manufacturer, to accomplish the following tasks – on site:
• Assist with proper removal, installation and repair methods for the CPP blade and hub system.
• Ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair and reassembly of the CPP blade and hub system.
3.1.2.1 The Contractor shall ensure that the Tech Rep possess a résumé of demonstrated experience with the system described above.
3.1.2.2 The Contractor shall submit a copy of the Tech Rep’s
résumé and a list of references to the COTR at the Arrival Conference.
3.1.3 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to piping.
WARNING!
Minimize pitch changes in dry-dock. To prevent damage to the blade seal o-rings, pitch changes in dry-dock should be kept to a minimum. The blade port areas must be continually flushed with water during the entire pitch changing operation in accordance with TP-3524, Chapter 6-5 (Draining, Charging and Testing the CPP System)
3.2 CPP work particulars. Using TP-3524 and Coast Guard
Drawings 225B WLB 556-008 and 225B WLB 556-010 as guidance, the Contractor shall perform the following in accordance with
5000_STD:
3.3 CPP work. Under the supervision of the technical
representative, the Contractor shall perform the work specified below. Disassembly, reassembly, grooming, tests, and data-submission-inspections require authorization from and the direct involvement of the technical representative.
3.3.1 Post-drydocking, pre-disassembly tests and inspections.
Page 14 (Rev-2)
3.3.1.1 Hub case pressures. Measure and record the pressure of the hub case, using an appropriately-rated pressure gauge with a valid calibration sticker, in the following 4 states: (a) with system de-energized/secured, (b) with system operational at steady state and blades not being cycled, (c) while cycling system ahead, (d) cycling system astern. When cycling blades, all affected dynamic seals must be constantly lubricated with a flow of water from a hose. Keep blade cycling to an absolute minimum. Hub pressure can be measured from a hub drain port, ensure a high pressure piston port is not used. Submit CFR.
3.3.1.2 Bolt tightness verification. Verify the tightness of
the hub flange bolts and blade bolts by applying a torque wrench, set to each respective maximum per TP-3524, to each bolt and check the tightness. Note specific bolts which have not met the proper torque per TP-3524. Submit CIR.
3.3.2 Hub and blade renewals. Renew the CPP hub and blades, and all associated components listed in the Government-furnished material list in paragraph 1.2. Refer to Chapter 6 and Chapter 8 of TP-3524. The Government will furnish a blade-removal/lifting device. Carefully remove, inspect, and photograph all existing hub and blade seals/o-rings. Submit
CIR.
NOTICE!
Blade bolts in acceptable condition shall be reused.
Turn the removed hub and blade seals/o-rings over to the Coast Guard Inspector.
Re-torque the hub flange bolts in accordance with TP-3524, Section 245-A, Subsection 4-4.1 to 4-4.3, inclusive. Renew all associated seals, gaskets, o-rings, stat-o-seal washers and all other disturbed software. Re-torque blade bolts and verify the pitch alignment, in accordance with TP-3524. Prior to and in conjunction with installing new blades perform the following.
3.3.2.1 New blade and hub inspections. Complete the following inspections on each blade. Submit a CFR for the results of each inspection.
3.3.2.1.1 Measure crank ring thrust clearance. Use a dial
indicator, hydraulic jack, and a strong back. Complete for all four blades.
Page 15 (Rev-2)
3.3.2.1.2 Perform a visual inspection of the blade sealing
surface. Inspect each blade sealing surface for condition, noting any defects or irregularities. Measure blade sealing surface finish with a profilometer. Three surface finish measurements shall be taken approx 120 degrees from each other.
Measurement shall be taken where blade seal contacts blade and shall be measured from an outer diameter to center of blade direction.
3.3.2.1.3 Perform a visual inspection of the gland sealing
surface. Inspect each gland sealing surface for condition, noting any defects or irregularities. Measure gland sealing surface finish with a profilometer. Three surface finish measurements shall be taken approx 120 degrees from each other.
3.3.2.1.4 Measure depth and width of gland. Also note
condition and configuration of outer gland edge. Note whether edge is sharp, radius, or chamfer. Provide photos of edge.
3.3.2.2 Old hub inspections. Prior to packaging the old hub
and blades, complete the following inspections. Submit a CFR for the results of each inspection, including photos.
3.3.2.2.1 Measure crank ring thrust clearance. Use a dial
indicator, hydraulic jack, and a strong back. Complete for all four blades.
3.3.2.2.2 Perform a visual inspection of each blade sealing
surface. Inspect each blade sealing surface for condition, noting any defects or irregularities. Photos shall be taken with a high resolution digital camera. Measure blade sealing surface finish with a profilometer. Three surface finish measurements shall be taken approx 120 degrees from each other.
Measurement shall be taken where blade seal contacts blade and shall be measured from an outer diameter to center of blade direction.
3.3.2.2.3 Perform a visual inspection of each gland sealing
surface. Inspect each gland sealing surface for condition, noting any defects or irregularities. Photos shall be taken with a high resolution digital camera. Measure gland sealing surface finish with a profilometer. Three surface finish measurements shall be taken approx 120 degrees from each other.
3.3.2.2.4 Measure depth and width of each gland. Also note
condition and configuration of outer gland edge. Note whether edge is sharp, radius, or chamfer. Provide pictures of edge.
Page 16 (Rev-2)
3.3.3 Hub and blade packaging and shipping. Package the old
hub and blades in the crate furnished with the new hub and blades and ship to ELC (Baltimore return address will be provided in new hub/blade packaging).
3.3.4 OD Box seal renewal. Renew the OD Box seals using the
Government-furnished seal kit listed in paragraph 1.2. Refer to Chapters 6 and 8 of TP-3524 for guidance.
3.3.5 Sump and head tank cleaning. The Contractor shall clean the oil system sump and head tank to “Cleanliness Grade A” as specified in paragraph 5.1.2 of Std Spec 5000_STD. Blow out with clean dry air. Take all necessary precautions to ensure that the tank level indicator sensors do not become damaged during the cleaning process. Use lint-free rags.
3.3.6 System flushing. “Flush” the system in accordance with
paragraph 20.8 of appendix C of Std Spec 5000_STD. Submit CFR for flushing plan. In lieu of fluid specification provided in paragraph 20.8.1.1 of appendix C of 5000_STD, use Government-furnished system fluid. Do not disassemble the following components: OD box, pump, directional control valve. Ensure all piping between the OD box and hub flange is flushed. Ensure all other piping and hose assemblies in the system are flushed. Max contamination level: -/16/12.
3.3.7 CPP fluid renewal. The Contractor shall “Renew” all
system hydraulic fluid in accordance with TP—3524 and Std Spec 5000_STD, Appendix C, Paragraph 20.1 (Fluids) using Government-furnished hydraulic fluid. Remove as much old fluid from the system as practicable. Max contamination level: -/16/12.
WARNING!
Minimize pitch changes in dry-dock. To prevent damage to the blade seal o-rings, pitch changes in dry-dock should be kept to a minimum. The blade port areas must be continually flushed with water during the entire pitch changing operation in accordance with TP-3524, Chapter 6-5 (Draining, Charging and Testing the CPP System)
3.3.8 Groom and lubricate all disturbed components. Under the supervision of a Coast Guard provided technical representative, “Groom and Lubricate” the entire CPP system in accordance with Std Spec 3.2.2.6 of Std Spec 5000_STD. Refer to section 4-3 of TP-3524 verifying relief valve, unloading valve, and all other system pressures and fluid levels.
Page 17 (Rev-2)
3.3.8.1 Prior to undocking, measure and record the pressure of the hub case, using an appropriately-rated pressure gauge with a valid calibration sticker, in the following 4 states: (a) with system de-energized/secured, (b) with system operational at steady state and blades not being cycled, (c) while cycling system ahead, (d) cycling system astern. When cycling blades, all affected dynamic seals must be constantly lubricated with a flow of water from a hose. Keep blade cycling to an absolute minimum. Hub pressure can be measured from a hub drain port, ensure a high pressure piston port is not used. Submit CFR.
3.4 Dock trials. The Contractor shall conduct dock trials to
demonstrate the operational readiness of the ship and to verify successful repair (proper function throughout the full range of pitch changes without leaks) to the CPP blades and hub, in-water. Submit a CFR.
3.4.1 The Contractor shall provide a pier facility (or allow
the cutter to move to a Coast Guard pier) in order to support dock trials. Dock trials may not be conducted while the cutter remains floating inside the dry-dock (not touching the blocks).
3.4.2 During dock trials, Contractor personnel shall observe
tests under their cognizance and make such adjustments and repairs, as required.
3.5 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutters and Boats Exterior Painting Systems) and Appendix B (Cutters and Boats Interior Painting Systems), respectively, and as applicable, to match existing adjacent surfaces. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
4. NOTES
This section is not applicable to this work item.
Page 18 (Rev-2)
86350_LNM_FLT (23 Jan 2009)
WORK ITEM 3: Provide Temporary Logistics
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide temporary logistics.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
3. REQUIREMENTS
3.1 General. The Contractor shall provide the below listed
temporary logistics, in accordance with Std Spec 8635_STD (see 4.1):
PARAGRAPH TITLE
3.2.2 Telephone. (To include long distance lines.
3.2.3 Parking (4 vehicles).
3.2.5 Light and power.
3.2.7 Hazardous Waste Disposal.
LIQUIDS (GALLONS) SOLIDS
Empty Containers* Used Lube Oil
Paint Thinners
Engine Coolant
Bilge Water
Oily Filters
Oily Rags (lbs) 1-gal 5-gal 55-gal
20 00 00 00 00 10 00 00 00 *Empty containers that previously housed hazardous materials.
3.2.10 Potable water: 1000 gallons per day, at 60
psig
3.2.11 Refuse disposal.
3.2.12 Sewage and Grey Water Disposal.
3.2 Additional temporary logistics. If the performance period of the contract is extended by the Contracting Officer, the contractor shall continue to provide all temporary logistics as specified herein for the extension period.
Page 19 (Rev-2)
3.3 Light and power revision. In addition to the requirements of Standard Specification 8635_STD, 2004 Edition, Section 3.2.5, the shall adhere to the following additional requirements:
3.3.1 Ungrounded shore power. Except for those cutters with an onboard shore power isolation transformer, only a single ungrounded shore power source shall be used for supplying electrical power, i.e. the generator or the transformer secondary supplying the shore tie must have all phases and any neutral insulated from earth with the frame of such equipment bonded to ground. Parallel transformers or generators shall not be used.
3.3.2 Grounding straps. Immediately after successful drydocking and before connecting the electrical shore tie cable to the vessel, the Contractor shall ground the vessel’s hull to a shore side grounding source as follows:
3.3.2.1 Cable lugs. Tightly secure the grounding cable lugs to the grounding plates; ensure the lug contact area is cleaned thoroughly to bare metal, and that resistance of the connection is a maximum of 125 microhms.
3.3.2.2 Cable size. Ensure that the cross sectional areas of
return ground cables are one million circular mils (1000 kcmil) minimum for each 1000 amps for each 100 feet (one or more cables, connected in parallel, may be used to meet the cross sectional area requirements). Return grounding cables smaller in diameter than 85 MCM (No. 1 AWG) are not permitted.
3.3.2.3 Cable insulation. All return grounding cables shall
have completely insulated copper conductors with an insulation resistance value of no less than 0.1 megohms.
CAUTION!
The contractor shall not use the vessel’s shore-tie cable when making electrical shore-tie connections.
4. NOTES
4.1 Paragraph number relationships. The paragraph number for
each paragraph listed in 3.1 (General) relates directly to the identical sub-paragraph number in Std Spec 8635_STD.
Page 20 (Rev-2)
86850_FLT (23 Dec 2008) 216_WLB (20 May 2009)
WORK ITEM 4: Conduct CPP Performance Sea Trials
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct sea trials to demonstrate successful completion of the CPP system repairs.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
None.
3. REQUIREMENTS
3.1 General.
3.1.1 Technical Representative. The Contractor shall provide
the services of a Technical Representative (Tech Rep), who is familiar with the Bird Johnson CPP system, and authorized by the manufacturer, to accomplish the following tasks – on site:
• Assist with additional troubleshooting, if required.
• Verify the successful completion of repairs (proper operation with no system leaks) done on the CPP blade and hub system.
3.1.1.1 The Contractor shall ensure that the Tech Rep possess a résumé of demonstrated experience with the system described above.
3.1.1.2 The Contractor shall submit a copy of the Tech Rep’s
résumé and a list of references to the COTR at the Arrival Conference.
Page 21 (Rev-2)
3.1.2 Trial applicability. If a Change Request has been
authorized by the KO, the Contractor shall perform sea trials for all work items that require conducting operational tests while the vessel is waterborne or underway, prior to their certification as being complete. The Contractor shall be responsible for ensuring all test procedures are prepared, approved, and distributed for the sea trials, and shall be responsible for recording test data and submitting CFRs to the
COTR.
3.2 Sea trials particulars. Under the supervision of the
technical representative, the Contractor shall demonstrate the hub and blade seals show no signs of oil leakage by performing a sea trial (see 4.1 (Equipment operation)). The sea trial shall consist of operating the CPP system, in accordance with TP-3524, through its full range of propeller pitch in transit mode starting at the quarter speed throttle setting and increasing the speed in quarter speed increments until full throttle is achieved. Hold each throttle setting for at least 15 minutes.
Repeat the trial described above. From a full stop position operate the CPP system in full astern for approximately 200 yards. Demonstrate control from the Pilot House and the Engineering Control Center (ECC). The Technical Representative shall attend the sea trial and assist with final adjustments and assessment. Contractor shall repair any leaks found. Submit a CFR. Ship’s Force will operate all cutter equipment.
3.3 Sea trial agenda. The Contractor shall prepare an agenda
that details the Contractor’s plans for completing the required sea trials.
3.3.1 Agenda contents.
3.3.1.1 The agenda shall consist of chronological list of
administrative events, inspection events and test events.
Events shall be arranged to permit expeditious conduct with minimum interference between concurrent events.
3.3.1.2 The agenda shall identify installation of any test
equipment or component modification that could impact the normal operation of equipment or systems during performance of the trials.
3.3.1.3 The agenda shall identify any operating instructions or special test procedures that could impact the normal operations of equipment or systems.
Page 22 (Rev-2)
3.3.1.4 The agenda shall include the full name, title, security clearance, home address, home telephone number and name of next of kin of each Contractor-personnel scheduled to ride the ship during performance of the trials.
3.3.2 Agenda submission requirements. The Contractor shall
submit four legible copies of the sea trial agenda to the COTR two days prior to the scheduled trials. The Contractor shall coordinate both the planning and conduct of the post-overhaul ship trials with the ship’s force (see 4.1 (Equipment operation)).
3.4 Environmental compliance. The Contractor shall abide by
all Federal, state, and local rules governing the overboard discharge of garbage and oil in the water.
WARNING!
Violators are subject to substantial civil and/or criminal sanctions including fines and imprisonment.
3.5 Sea trials. As soon as possible after completion of the
dock trials, the Contractor shall conduct the sea trials, based on the operational tests required in the work items listed in paragraph 3.1 (Trial applicability), for the following purpose:
• Perform tests that could not be performed while the ship was moored.
• Serve as final step in proving the success of the overhaul/repair tasks required in the designated work items, and ensure that Contractor and COTR are both satisfied that the ship is in all respects ready for final acceptance.
3.5.1 The Contractor shall have representatives (Tech Rep) on board the cutter to observe the trials for the purpose of observing whether or not the repairs are satisfactory.
3.5.2 The sea trials shall be carried out in free route, away from other shipping, as designated by the COTR.
3.6 Post-trial examination. After the completion of the sea
trial and under the supervision of the Tech Rep, the Contractor shall perform a careful and thorough assessment of the repaired CPP system. If any part of the ship or its equipment fails to meet contractual requirements during trials, perform additional trials after corrective measures have been taken.
Page 23 (Rev-2)
Representatives of manufacturers who have furnished ship components may be invited to witness trials subject to approval of the CO of the ship.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all tests.