1.2 WYACONDA Schedule of Supplies .xls

XLS spreadsheet 22 KB Posted

Attached to
USCGC WYACONDA (WLR-75403) DRYDOCK & REPAIR
Solicitation number
HSCG80-09-Q-3FAM73
Issued by

About this file

USCGC WYACONDA PRICE/COST SHEET

View the file

Other files

File Type Posted
1.1 WYACONDA Statement of Work 75403_DD_MWC_09R0 1 .pdf PDF
1 WYACONDA DRYDOCK RFQ.DOC DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUPPLIES/SERVICES AND PRICE/COSTS FOR:
USCGC WYACONDA (WLR-75403) DRY DOCK AVAILABILITY 2009
HSCG80-09-Q-3FAM73
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
1-DPerform Ultrasonic Thickness Measurements - Underwater Hull Plating (Barge)EA200
2-DPerform Ultrasonic Thickness Measurements - Underwater Hull Plating (Tender)EA200
3-OPerform Hull and Structural Plating Repairs (10.2-Pound)4 sqft25
4-OPerform Hull and Structural Plating Repairs (12.75-Pound)4 sqft25
5-OPerform Hull and Structural Steel Plate Repairs (15.3-Pound)4 sqft25
6-OPerform Hull and Structural Plating Repairs – Eroded Welds (Steel)ft50
7-OPerform Hull and Structural Plating Repairs – Crack (Steel)ft50
8-OPerform Hull and Structural Plating Repairs – Overlay Welding (Steel)8 sqin6
9-DRemove, Inspect, and Reinstall Propeller ShaftsJOB1
10-DRemove, Inspect, and Reinstall Intermediate ShaftsJOB1
11-OStraighten ShaftJOB2
12-DRenew Water-Lubricated Shaft BearingsJOB1
13-DRenew Propeller Shaft SleevesJOB1
14-0Renew Shaft Strut BarrelJOB2
15-DRemove, Inspect, and Reinstall PropellersJOB1
16-OPerform Minor Repairs and Reconditioning of Port PropellerJOB1
17-DClean, Inspect, and Test Grid Coolers (Barge)JOB1
18-DClean, Inspect, and Test Grid Coolers (Tender)JOB1
19-DOverhaul Simplex Sea Strainer (Barge)JOB1
20-DOverhaul Duplex Sea Strainer (Tender)JOB1
21-DRemove, Inspect and Reinstall Steering and Backing Rudder AssembliesJOB1
22-ORebuild Rudder Stock and RudderJOB2
23-ORenew Rudder Lower Bearing TrunkJOB2
24-DPreserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Barge)JOB1
25-DPreserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Tender)JOB1
26-0Preserve Underwater Body (Barge) - 100%"JOB1
27-OPreserve Underwater Body (Barge) - "Partial"JOB1NSP
28-OPreserve Underwater Body (Tender) - "100%"JOB1
29-OPreserve Underwater Body (Tender) - "Partial"JOB1NSP
30-DPreserve Tender Freeboard – 100%JOB1
31-DRoutine Drydocking (Barge)JOB1
32-DRoutine Drydocking (Tender)JOB1
33-DProvide Temporary LogisticsJOB1
34-DClean and Inspect Various Electrical PanelsJOB1
35-DInstall New Deck Covering System in Crew’s BerthingJOB1
36-DInstall Additional Spud System on BargeJOB1
37-DRenew Hull Plating in Sewage Hold CompartmentJOB1
A-OComposite Labor RateHour140
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&RPage 3 of 37

&C([03/26/2009] REV-0)

Page &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .