USCGC WYACONDA PRICE/COST SHEET
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1.1 WYACONDA Statement of Work 75403_DD_MWC_09R0 1 .pdf | ||
| 1 WYACONDA DRYDOCK RFQ.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUPPLIES/SERVICES AND PRICE/COSTS FOR: | |||||
| USCGC WYACONDA (WLR-75403) DRY DOCK AVAILABILITY 2009 | |||||
| HSCG80-09-Q-3FAM73 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Barge) | EA | 200 | ||
| 2-D | Perform Ultrasonic Thickness Measurements - Underwater Hull Plating (Tender) | EA | 200 | ||
| 3-O | Perform Hull and Structural Plating Repairs (10.2-Pound) | 4 sqft | 25 | ||
| 4-O | Perform Hull and Structural Plating Repairs (12.75-Pound) | 4 sqft | 25 | ||
| 5-O | Perform Hull and Structural Steel Plate Repairs (15.3-Pound) | 4 sqft | 25 | ||
| 6-O | Perform Hull and Structural Plating Repairs – Eroded Welds (Steel) | ft | 50 | ||
| 7-O | Perform Hull and Structural Plating Repairs – Crack (Steel) | ft | 50 | ||
| 8-O | Perform Hull and Structural Plating Repairs – Overlay Welding (Steel) | 8 sqin | 6 | ||
| 9-D | Remove, Inspect, and Reinstall Propeller Shafts | JOB | 1 | ||
| 10-D | Remove, Inspect, and Reinstall Intermediate Shafts | JOB | 1 | ||
| 11-O | Straighten Shaft | JOB | 2 | ||
| 12-D | Renew Water-Lubricated Shaft Bearings | JOB | 1 | ||
| 13-D | Renew Propeller Shaft Sleeves | JOB | 1 | ||
| 14-0 | Renew Shaft Strut Barrel | JOB | 2 | ||
| 15-D | Remove, Inspect, and Reinstall Propellers | JOB | 1 | ||
| 16-O | Perform Minor Repairs and Reconditioning of Port Propeller | JOB | 1 | ||
| 17-D | Clean, Inspect, and Test Grid Coolers (Barge) | JOB | 1 | ||
| 18-D | Clean, Inspect, and Test Grid Coolers (Tender) | JOB | 1 | ||
| 19-D | Overhaul Simplex Sea Strainer (Barge) | JOB | 1 | ||
| 20-D | Overhaul Duplex Sea Strainer (Tender) | JOB | 1 | ||
| 21-D | Remove, Inspect and Reinstall Steering and Backing Rudder Assemblies | JOB | 1 | ||
| 22-O | Rebuild Rudder Stock and Rudder | JOB | 2 | ||
| 23-O | Renew Rudder Lower Bearing Trunk | JOB | 2 | ||
| 24-D | Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Barge) | JOB | 1 | ||
| 25-D | Preserve Spud and Spud Well Surfaces and Renew Spud Well Liners (Tender) | JOB | 1 | ||
| 26-0 | Preserve Underwater Body (Barge) - 100%" | JOB | 1 | ||
| 27-O | Preserve Underwater Body (Barge) - "Partial" | JOB | 1 | NSP | |
| 28-O | Preserve Underwater Body (Tender) - "100%" | JOB | 1 | ||
| 29-O | Preserve Underwater Body (Tender) - "Partial" | JOB | 1 | NSP | |
| 30-D | Preserve Tender Freeboard – 100% | JOB | 1 | ||
| 31-D | Routine Drydocking (Barge) | JOB | 1 | ||
| 32-D | Routine Drydocking (Tender) | JOB | 1 | ||
| 33-D | Provide Temporary Logistics | JOB | 1 | ||
| 34-D | Clean and Inspect Various Electrical Panels | JOB | 1 | ||
| 35-D | Install New Deck Covering System in Crew’s Berthing | JOB | 1 | ||
| 36-D | Install Additional Spud System on Barge | JOB | 1 | ||
| 37-D | Renew Hull Plating in Sewage Hold Compartment | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 140 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| Z-O | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&RPage 3 of 37
&C([03/26/2009] REV-0)
Page &P of &N