4=REV(1)=PENOBSCOT BAY cost sheet.xls
XLS spreadsheet 21 KB Posted
- Attached to
- USCGC PENOBSCOT BAY (WTGB-107) DRYDOCK REPAIR
- Solicitation number
- HSCG80-09-Q-3FAB19
About this file
USCGC PENOBSCOT BAY (WTGB-107) PRICING SHEET PAGE 3 0f 38
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2=PENOBSCOT BAY DRYDOCK RFQ.DOC | DOC document | |
| 3=REV(1)=PENOBSCOT BAY SPECIFICATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: USCGC PENOBSCOT BAY (WTGB-107) DRYDOCK AVAILABILITY 2009 | |||||
| ITEM* | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1-D | Remove, Inspect, and Reinstall Propeller Shaft | JOB | 1 | ||
| 2-D | Overhaul Shaft Seal Assembly | JOB | 1 | ||
| 3-D | Remove, Inspect, and Reinstall Propeller | JOB | 1 | ||
| 4-D | Perform Minor Repairs and Reconditioning of Propeller | JOB | 1 | ||
| 5-D | Clean SSDG Exhaust Stacks | JOB | 1 | ||
| 6-D | Renew Depth Indicating Transducer | JOB | 1 | ||
| 7-D | Overhaul and Renew Sea Valves | JOB | 1 | ||
| 8-D | Inspect and Test Relief Valves | JOB | 1 | ||
| 9-D | Overhaul Steering Pump Motors | JOB | 1 | ||
| 10-D | Overhaul Steering Pumps | JOB | 1 | ||
| 11-D | Remove, Inspect and Reinstall Rudder Assembly | JOB | 1 | ||
| 12-D | Perform Boat Boom Maintenance | JOB | 1 | ||
| 13-D | Perform Anchor Windlass Maintenance | JOB | 1 | ||
| 14-D | Preserve Weather Decks | JOB | 1 | ||
| 15-D | Preserve Underwater Body – “100%” | JOB | 1 | ||
| 16-D | Preserve Stern Tube | JOB | 1 | ||
| 17-D | Renew Cathodic Protection System | JOB | 1 | ||
| 18-D | Preserve Grey Water Collection and Holding Tanks - Partial | JOB | 1 | ||
| 19-D | Routine Drydocking | JOB | 1 | ||
| 20-D | Provide Temporary Logistics | JOB | 1 | ||
| 21-D | Renew Section of J/W Piping for No. 2 MDE | JOB | 1 | ||
| 22-D | Perform Inspection and Maintenance of Steering System | JOB | 1 | ||
| 23-D | Renew Steering System Hydraulic Hoses | JOB | 1 | ||
| 24-D | Renew Various Boat Boom Hoses | JOB | 1 | ||
| 25-D | Reseal Cosmetic Polymeric Deck Covering Systems | JOB | 1 | ||
| A-O | Composite Labor Rate | Hour | 600 | ||
| B-D | GFP Report | NSP | EA | 1 | NSP |
| C-D | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| *Note: A suffix 'D' in the ITEM column denotes a Definite Item; A suffix 'O' denotes a Optional Item. (01/22/2009 REV-1) |
&L&9HSCG80-09-Q-3FAB19
USCGC PENOBSCOT BAY (WTGB-107)
DRYDOCK REPAIRS&RPAGE 3 OF 38
Sheet2
Sheet3
File details come from the government source that posted it. Updated .