Schedule for Pricing MATINICUS 09 DD.xls
XLS spreadsheet 35 KB Posted
- Attached to
- CGC MATINICUS (WPB-1315) 08 DRYDOCK REPAIR
- Solicitation number
- HSCG80-08-Q-3FAP88
About this file
CGC MATINICUS SCHEDULE FOR PRICING
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1 OF SOLICITATION MATINICUS 09 DD.doc | DOC document | |
| RFQ MATINICUS 09 DD.doc | DOC document | |
| SPEC MATINICUS 09 DD REV0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-09-Q-3FAP88 | Page___of___ | |||||||
| USCGC MATINICUS (WPB-1315) | ||||||||
| DRYDOCKING AVAILABILITY | ||||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | ||||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | |
| OPT | 1 | 0001 | WELDING REPAIRS: Crack Repair (Steel) | 1 foot | 6 | |||
| OPT | 1 | 0001AA | WELDING REPAIRS: Crack Repair (Aluminum) | 1 foot | 8 | |||
| OPT | 1 | 0001AB | WELDING REPAIRS: Shell Plating - Flat (5.0# or 5.1# Steel) | 4 sqft | 10 | |||
| OPT | 1 | 0001AC | WELDING REPAIRS: Shell Plating - Flat (7.0# or 7.5# or 7.65# Steel) | 4 sqft | 10 | |||
| OPT | 1 | 0001AD | WELDING REPAIRS: Shell Plating - Flat (10.0 or 10.2 Steel) | 4 sqft | 2 | |||
| OPT | 1 | 0001AE | WELDING REPAIRS: Corrugated Plate (4.0#) | 1 sqft | 5 | |||
| OPT | 1 | 0001AF | WELDING REPAIRS: Overlay Welding (Steel) | 8 sqin | 6 | |||
| OPT | 1 | 0001AG | WELDING REPAIRS: Overlay Welding (Aluminum) | 6 sqin | 8 | |||
| OPT | 1 | 0001AH | WELDING REPAIRS: Eroded Weld Renewal (Steel) | 1 foot | 6 | |||
| OPT | 1 | 0001AI | WELDING REPAIRS: Eroded Weld Renewal (Aluminum) | 1 foot | 8 | |||
| BASE | 2 | 0002 | ROUTINE DRYDOCKING | JOB | 1 | |||
| BASE | 3 | 0003 | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | |||
| OPT | 3 | 0003AA | Provide Additional Temporary Logistics | DAY | 5 | |||
| BASE | 4 | 0004 | PROVIDE SMALL BOAT STORAGE | JOB | 1 | |||
| BASE | 5 | 0005 | CLEAN AND INSPECT FUEL SERVICE TANKS | JOB | 1 | |||
| BASE | 6 | 0006 | CLEAN AND INSPECT FUEL STOWAGE AND OVERFLOW TANKS | JOB | 1 | |||
| BASE | 7 | 0007 | CLEAN AND INSPECT OIL AND OILY WASTE TANKS | JOB | 1 | |||
| BASE | 8 | 0008 | PRESERVE OIL TANKS 100% | JOB | 1 | |||
| BASE | 9 | 0009 | CLEAN AND INSPECT SEWAGE AND GREY WATER COLLECTION AND HOLDING TANKS | JOB | 1 | |||
| BASE | 10 | 0010 | PRESERVE SEWAGE AND GREY WATER COLLECTION AND HOLDING TANKS - 100% | JOB | 1 | |||
| BASE | 11 | 0011 | PRESERVE AND DISINFECT POTABLE WATER TANKS - PARTIAL | EA | 1 | |||
| BASE | 12 | 0012 | INSPECT MDE EXHAUST SYSTEM | JOB | 1 | |||
| BASE | 13 | 0013 | OVERHAUL STABILIZING FINS | JOB | 1 | |||
| BASE | 14 | 0014 | OVERHAUL AND RENEW SEA VALVES | JOB | 1 | |||
| BASE | 15 | 0015 | OVERHAUL AND RENEW FIREMAIN VALVES | JOB | 1 | |||
| BASE | 16 | 0016 | OVERHAUL AND RENEW ASW VALVES | EA | 1 | |||
| BASE | 17 | 0017 | REMOVE,INSPECT AND REINSTALL PROPELLERS | JOB | 1 | |||
| OPT | 18 | 0018 | REPAIR PROPELLER ROOT EROSION | |||||
| (1.0 cubic inch) | EA | 20 | ||||||
| OPT | 18 | 0018AA | Balance Propeller | EA | 2 | |||
| BASE | 19 | 0019 | REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTS | JOB | 1 | |||
| BASE | 20 | 0020 | OVERHAUL MECHANICAL SHAFT SEAL ASSEMBLIES | JOB | 1 | |||
| BASE | 21 | 0021 | INSPECT AND MAINTAIN CATHODIC PROTECTION SYSTEM | JOB | 1 | |||
| BASE | 22 | 0022 | RENEW WATER LUBRICATED PROPELLER SHAFT BEARINGS | JOB | 1 | |||
| BASE | 23 | 0023 | INSPECT BRONZE SLEEVES IN VARIOUS AREAS | JOB | 1 | |||
| BASE | 24 | 0024 | REMOVE, INSPECT, AND REINSTALL RUDDER ASSEMBLIES | JOB | 1 | |||
| BASE | 25 | 0025 | OVERHAUL STEERING GEAR COMPONENTS | JOB | 1 | |||
| BASE | 26 | 0026 | RENEW SPEED DOPPLER | JOB | 1 | |||
| BASE | 27 | 0027 | RENEW DEPTH INDICATING TRANSDUCER | JOB | 1 | |||
| BASE | 28 | 0028 | PRESERVE UNDERWATER BODY "100%" | JOB | 1 | |||
| BASE | 29 | 0029 | PRESERVE FREEBOARD | JOB | 1 | |||
| BASE | 30 | 0030 | PRESERVE WEATHER DECKS | JOB | 1 | |||
| BASE | 31 | 0031 | PRESERVE FORWARD PEAK COMPARTMENT | JOB | 1 | |||
| BASE | 32 | 0032 | PRESERVE FORWARD VOID | JOB | 1 | |||
| BASE | 33 | 0033 | PERFORM HULL REPAIRS | JOB | 1 | |||
| BASE | 34 | 0034 | RENEW FLOATING DECK SYSTEM IN CO'S CABIN | JOB | 1 | |||
| BASE | 35 | 0035 | RENEW SHOWER STALLS | JOB | 1 | |||
| BASE | 36 | 0036 | RENEW STRUCTURAL CLOSURE (S) | JOB | 1 | |||
| BASE | 37 | 0037 | RENEW SEWAGE SYSTEM PIPING | JOB | 1 | |||
| BASE | 38 | 0038 | INSTALL P-100 FIXED PIPING (EC 110-C-126) | JOB | 1 | |||
| OPT | 39 | 0039 | ULTRASONIC THICKNESS MEASUREMENTS | JOB | 1 | |||
| BASE | 40 | 0040 | RENEW CAPASTIC FAIRING | JOB | 1 | |||
| BASE | 41 | 0041 | RENEW PILOTHOUSE WINDOWS | JOB | 1 | |||
| OPT | A | Composite Labor Rate | Hour | 430 | ||||
| BASE | B | GFP report in accordance with solicitation. | NSP | EA | 1 | NSP | ||
| OPT | Z | Laydays | DAY | 5 | ||||
| Subtotal BASE and OPTION Items: | ||||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .