Schedule for Pricing CHINOOK 08 DD.xls
XLS spreadsheet 34 KB Posted
- Attached to
- USCGC CHINOOK (WPB-87308) 08 DRYDOCK REPAIR
- Solicitation number
- HSCG80-08-Q-3FAE66
About this file
SCHEDULE FOR PRICING CGC CHINOOK (WPB 87308) 08 DRYDOCK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 2 OF SOLICITATION CHINOOK 08 DD .doc | DOC document | |
| Schedule for Pricing CHINOOK 08 DD.xls | XLS spreadsheet | |
| SPEC CHINOOK 08 DD REV2.doc | DOC document | |
| AMENDMENT 1 OF SOLICITATION CHINOOK 08 DD .doc | DOC document | |
| Schedule for Pricing CHINOOK 08 DD.xls | XLS spreadsheet | |
| SPEC CHINOOK 08 DD REV1.doc | DOC document | |
| RFQ CHINOOK 08 DD.DOC | DOC document | |
| SPEC CHINOOK 08 DD REV0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-08-_-3FA___ | Page___of___ | ||||||
| USCGC CHINOOK (WPB-87308) | |||||||
| DRYDOCKING AVAILABILITY | |||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | |||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1 | 0001 | WELDING REPAIRS | NSP | NSP | NSP | NSP | |
| OPT | 1 | 0001AA | WELDING REPAIRS: Crack Repair (Steel) | 1 foot | 6 | ||
| OPT | 1 | 0001AB | WELDING REPAIRS: Steel Plate (5.0 or 5.1# Steel) | 4 sqft | 5 | ||
| OPT | 1 | 0001AC | WELDING REPAIRS: Aluminum Plate (7.0 # plate) | 4 | 27 | ||
| OPT | 1 | 0001AD | WELDING REPAIRS: Steel Plate (3/16" Steel Shell Plating) | 4 sqft | 10 | ||
| OPT | 1 | 0001AE | WELDING REPAIRS: Overlay Welding (Steel) | 8 sqin | 6 | ||
| OPT | 1 | 0001AF | WELDING REPAIRS: Eroded Weld Renewal (Steel) | 1 foot | 6 | ||
| OPT | 1 | 0001AG | WELDING REPAIRS: Stud Renewal (Stainless Steel) | EA | 20 | ||
| OPT | 1 | 0001AH | WELDING REPAIRS: Chine Renewal, 3/16" Steel Plate | 2 foot | 10 | ||
| BASE | 2 | 0002 | CLEAN AND INSPECT SEWAGE AND GREY WATER TANKS | JOB | 1 | ||
| OPT | 3 | 0003 | REALIGN MAIN ENGINE/REDUCTION GEAR | EA | 2 | ||
| BASE | 4 | 0004 | REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTS | JOB | 1 | ||
| OPT | 4 | 0004AA | Inspect Government-furnished Propeller Shaft | EA | 2 | ||
| OPT | 5 | 0005 | REPAIR SHAFT | EA | 2 | ||
| OPT | 6 | 0006 | STRAIGHTEN SHAFT | JOB | 2 | ||
| 7 | 0007 | RENEW WATER-LUBRICATED SHAFT BEARINGS | NSP | NSP | NSP | NSP | |
| OPT | 7 | 0007AA | Renew Intermediate Bearing | EA | 2 | ||
| OPT | 7 | 0007AB | Renew Aft Bearing | EA | 2 | ||
| OPT | 7 | 0007AC | Renew Bearing Carriers | EA | 4 | ||
| BASE | 8 | 0008 | REMOVE, INSPECT, AND REINSTALL PROPELLERS | JOB | 1 | ||
| OPT | 9 | 0009 | PERFORM MINOR REPAIR AND RECONDITION OF PROPELLER | EA | 2 | ||
| BASE | 10 | 0010 | RENEW TRANSDUCER | JOB | 1 | ||
| BASE | 11 | 0011 | PRESERVE TRANSDUCER HULL RINGS | JOB | 1 | ||
| 12 | 0012 | OVERHAUL AND RENEW VALVES | NSP | NSP | NSP | NSP | |
| OPT | 12 | 0012AA | Overhaul 8" Butterfly Sea Valves | EA | 4 | ||
| OPT | 12 | 0012AB | Renew 3" Butterfly Sea Valves | EA | 4 | ||
| BASE | 13 | 0013 | CLEAN AND INSPECT SEA STRAINERS | JOB | 1 | ||
| BASE | 14 | 0014 | REMOVE, INSPECT, AND REINSTALL RUDDER ASSEMBLIES | JOB | 1 | ||
| OPT | 14 | 0014AA | Renew Rudder Lower Bearing | JOB | 1 | ||
| BASE | 15 | 0015 | PRESERVE FORWARD PEAK COMPARTMENT | JOB | 1 | ||
| BASE | 16 | 0016 | INSPECT RHIB NOTCH SKID PADS | JOB | 1 | ||
| OPT | 17 | 0017 | PRESERVE UNDERWATER BODY-PARTIAL | JOB | 1 | ||
| OPT | 18 | 0018 | PRESERVE UNDERWATER BODY-COMPLETE | JOB | 1 | ||
| BASE | 19 | 0019 | ULTRASONIC THICKNESS MEASUREMENTS - UNDERWATER BODY (Includes 200 UT Shots) | JOB | 1 | ||
| BASE | 20 | 0020 | ULTRASONIC THICKNESS MEASUREMENTS - FREEBOARD (Includes 100 UT Shots) | JOB | 1 | ||
| BASE | 21 | 0021 | RENEW CATHODIC PROTECTION SYSTEM | JOB | 1 | ||
| BASE | 22 | 0022 | INSPECT TRANSDUCER FAIRING | JOB | 1 | ||
| OPT | 23 | 0023AA | RENEW TRANSDUCER FAIRING | JOB | 1 | ||
| BASE | 24 | 0024 | ROUTINE DRYDOCKING | JOB | 1 | ||
| OPT | 23 | 0023AA | Additional Fuel removal and disposal(up to 250 gallons) | JOB | 4 | ||
| BASE | 24 | 0024AA | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | ||
| OPT | 25 | 0025 | Provide Additional Temporary Logistics | DAY | 5 | ||
| BASE | 26 | 0026 | RENEW HATCH COAMINGS | JOB | 1 | ||
| BASE | 27 | 0027 | PRESERVE DAMAGE CONTROL (DC) LOCKER | JOB | 1 | ||
| BASE | 28 | 0028 | INSTALL AFFF BILGE SPRINKLER SYSTEM | JOB | 1 | ||
| BASE | 29 | 0029 | INSPECT PILOTHOUSE DECK | JOB | 1 | ||
| OPT | A | Composite Labor Rate | Hour | 110 | |||
| BASE | B | GFP report in accordance with solicitation. | NSP | EA | 1 | NSP | |
| OPT | Z | Laydays | DAY | 5 | |||
| Subtotal BASE and OPTION Items: | |||||||
| Total of all Items: |
File details come from the government source that posted it. Updated .