Text version

REQUEST FOR QUOTATIONS

SOLICITATION NUMBER:

HSCG52-16-Q-PRW044

QUOTE DUE: 1 SEPT 2016

QUOTE MAY BE FAXED TO: 617-223-3145 or emailed to Jane.Mckenzie@uscg.mil FOR: Replace fencing USCG Base Cape Cod per attached

IMPORTANT - NOTICE TO QUOTERS

2. Any entity wishing to do business with the federal government under a federally-funded contract or applying for federal grants, cooperative agreements or other forms of federal financial assistance through Grants.gov must be registered in the System for Award Management (SAM). To register an entity in SAM, follow these steps:

Step 1: Access the SAM online registration at www.sam.gov. Step 2: Create a User Account.

Step 3: Click on "Register New Entity" from the left side navigation pane. You must have a Data Universal Numbering System (DUNS) number in order to begin the registration process.

Step 4: Complete and submit the online registration.

3. Before emailing your offer, please recheck the following:

(a) Does your offer set forth full, accurate, and complete information as required by this solicitation?

(b) Have you rechecked your figures, including calculations on your work sheets?

(c) Have you completed and signed all required documents?

(d) Offerors offering less than sixty (60) calendar days acceptance time WILL NOT BE considered and WILL BE rejected.

4. Review this RFQ as soon as possible upon receipt. Any questions regarding the solicitation shall be submitted in writing via e- mail to the Contracting Officer @ Jane.mckenzie@uscg.mil no later than 29 AUG 2016

5. Quotations submitted via e-mail are authorized to the e-mail address above.

6. A tax exempt number will not be provided.

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time- consuming litigation.

OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum.

Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.

The Ombudsman Hotline telephone number is 202.372.3695.

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ

IS

IS NOT A SMALL BUSINESS SET ASIDE

PAGE OF PAGES

1 REQUEST NO.

HSCG52-16-Q-PRW044

2. DATE ISSUED

15 AUG 2016

3. REQUISITION/PURCHASE REQUEST NO.

21-16-526PRW044

4. CERT. FOR NAT. DEF. UNDER BDSA REG. 2 AND/OR DMS REG. 1
RATING

5a. ISSUED BY CO, USCG Base Boston, 427 Commercial St., Boston MA 02109

6. DELIVERY BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY

FOB DESTINATION

OTHER (See schedule)

NAME

Jane Mckenzie Jane.mckenzie@uscg.mil Site Visit: see below

TELEPHONE NUMBER

AREA CODE

NUMBER

9. DESTINATION

a. NAME OF CONSIGNEE

USCG BASE CAPE COD

8. TO:

a. NAME
b. COMPANY
b. STREET ADDRES

3424 Turpentine Road

c. STREET ADDRESS
c. CITY

Buzzards Bay

d. CITY
e. STATE
f. ZIP CODE
d. STATE

MA

e. ZIP CODE 02542

10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS (date)

QUOTE DUE 1 SEPT 2016

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

0001
Contractor shall provide all labor, equipment, materials, supervision, transportation to replace fencing at Building 3424 Turpentine Road, USCG Base Cape Cod, Buzzards Bay MA 02542 in accordance with attached scope of work Federal Acquisition Regulation (FAR) clauses, and DOL Davis Bacon Act Wage Determination

Payrolls will be required to be submitted to the contracting officer.

Quote may be faxed to 617-223-3145 or emailed to Jane.Mckenzie@uscg.mil Contractor submitting quotes SHALL include their DUNS and TIN with quote.

The estimated magnitude of construction is below $25,000 SITE VISIT: any contractor wishing to attend site visit MUST submit the “JBCC EVENT/PROJECT ROSTER” form posted on www.fbo.gov with the solicitation to Albert.J.Pulsifer@uscg.mil no later than 19 AUG 2016.

SITE VISIT will be conducted THURSDAY 25 AUG 2016 at 1300 EDT. Contractors who have not submitted the “JBCC EVENT/PROJECT ROSTER” will not be allowed at the site visit

12. DISCOUNT FOR PROMPT PAYMENT:
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS
NUMBER
PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN QUOTATION
15. DATE OF QUOTATION

a. NAME OF QUOTER

b. STREET ADDRESS

FAX #

16. SIGNER

a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

DUNS #

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or print)
NUMBER

STATEMENT OF WORK

FOR

D1 Enforcement Fence Project

BASE CAPE COD

JULY 2016

SECTION 01010

GENERAL REQUIREMENTS

PART 1 – GENERAL

1.1 SCOPE: The contractor shall provide all supervision, labor, tools, materials, transportation, equipment and other services necessary to demolish 150 linear feet of 8 foot tall security fence with rolling gates (2 openings). Furnish and install 225 linear feet of new 6 foot tall industrial grade, 9 gauge, galvanized fence with double swing gate 16 feet wide (1 opening) at Building 3424 Turpentine Road, USCG Base Cape Cod on Joint Base Cape Cod.

1.2 SITE VISITS: Bidders are strongly recommended to inspect the site where work is to be performed to satisfy them regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Arrangements for such visits shall be made by completing the “JBCC EVENT/PROJECT ROSTER “ and emailing to albert.j.pulsifer@uscg.mil no later than 19 AUG 2016, any questions regarding this specification or the work shall be addressed in writing and directed to the Contracting Officer. Questions must be submitted no later than 29 AUG 2016.

1.3 LOCATION: Building 3424 Turpentine Road, USCG Base Cape Cod on Joint Base Cape Cod.

1.4 HOURS OF WORK: Normal working hours for the contract are 7:00 A.M. to 4:00 P.M., Monday through Friday (excluding Federal Holidays). If the contractor desires to work other than normal duty hours, on weekends or federal holidays, he/she must request written permission from the Contracting Officer at least 36 hours in advance of such work and approval must be received prior to the requested work time. The contractor shall coordinate the work schedule and all work with the COR. The contractor shall not make any attempt to access any work areas without prior arrangements with the COR.

1.5 PRECONSTRUCTION CONFERENCE: Upon award of the contract and prior to starting the project, the contractor shall attend a pre-construction conference with the Contracting Officer to ensure a complete understanding of the project. The contractor shall pay for all expenses incurred by him in this regard. All questions shall be resolved and confirmed in writing if required.

1.6 SECURITY REQUIREMENTS: All contractor personnel scheduled to work on JBCC shall be subject to a National Crime Information Center (NCIC) background check in order to gain access through the Base security gates. In addition to the NCIC background check, all contractors shall provide the following information: name, citizenship, drivers’ license state and number, and date of birth. The NCIC form shall be filled out by the contractor, listing all personnel that require access to JBCC; form shall be submitted to the COR for processing at least 7 calendar days prior to the date of access.

1.6.1 Contractor’s vehicles shall have a valid and current proof of insurance and vehicle registration. The drivers shall have a valid license and all passengers shall have a positive photo ID. All contractor vehicles must enter the Base through the main gate on the Bourne side of the Base property. At the beginning and end of each visit, contractor personnel shall check in/out with the COR to obtain initial access to BCC and verify the schedule.

1.7 REMOVAL OF CONTRACTOR EMPLOYEES: All employees of the contractor in the performance of this contract, or any representative of the contractor entering the worksite, shall abide by all applicable regulations and shall submit to security checks as may be deemed necessary. The Government reserves the right to direct the contractor to remove from the performance under this contract, any employee, for misconduct or security reasons. This shall not relieve or constitute an excuse from the contract performance. Upon dismissal the employee shall render any and all identification for entry to the worksite.

1.8 SCHEDULE OF WORK: After receiving the notice to proceed, the contractor shall submit a Schedule of Work on the Government furnished form or other form approved by the Contracting Officer. The contractor shall not commence work under this contract without receiving a copy of the signed, approved schedule.

1.9 CONTRACTOR’S DAILY LOGS: All personnel shall be skilled and have sufficient knowledge and experience necessary to perform work assigned to them. The contractor shall provide qualified supervision at all times when work is being conducted by contractor employees or subcontractor employees. The contractor shall complete the Base Cape Cod daily log form at the end of each working day and deliver it to the COR. The Government will attest to its accuracy by initialing the form and providing a copy back to the contractor.

1.10 COORDINATION OF CONTRACT WORK WITH GOVERNMENT WORK: The Government will continue to operate within its buildings and areas during the execution of the contract. The Government will keep interference with the contractor’s operation to a minimum. The contractor shall conduct his/her operations so as not to interfere with the Governments operation of the facility.

1.11 ON SITE SUPERVISION: Prior to commencing work, the contractor shall submit a letter to the Contracting Officer designating an employee from his/her company as the foreman or supervisor. The supervisor shall be on site any time work is being performed. The supervisor shall be able to read, write, speak English, and have the authority to approve and accept delivery orders and minor (under $2000.00) modifications to delivery orders.

1.12 PROTECTION OF PROPERTY: The contractor shall comply with the requirements of Paragraph 52.236-9 and 52.236-10 of the Federal Acquisition Regulation and the following: All existing grounds, fences, utilities, equipment, building components and adjacent property, including vehicles, shall be protected from any damage resulting from contract operations. Contractors will be responsible for any damage to Government property. Damaged property (done by the contractor) shall be repaired by the contractor, at contractor’s expense, to meet previous existing conditions.

1.12.1 The contractor shall take all necessary precautions to meet proper safety standards and regulations of the State and Federal Codes. OSHA regulations apply to all work performed on site. In addition, they shall conform to any restrictions as may be outlined by the Base Safety Officer and Fire Department during the course of the contract.

1.12.2 Prior to doing any welding or burning with a torch the contractor shall obtain a “hot work” permit from the USCG FED Safety Office.

1.13 HAZARDOUS MATERIAL: The contractor shall be solely responsible for any and all contractor generated or owned hazardous materials. While performing work Specific herein, if potentially hazardous materials are utilized a MSDS will be submitted to the COR prior to its use. If the hazardous materials are encountered, the contractor shall notify the COR immediately. The contractor’s responsibility for handling hazardous material is incidental to work performed, i.e., the contractor shall handle, remove, and properly dispose of only those hazardous materials necessary to complete the contract work.

1.13.1 Any commercial adhesives, sealants, adhesive primers, sealant primers, and associated surface preparation and cleanup solvents in containers greater than a net volume of 16 fluid ounces, or a net weight of one pound shall not exceed volatile organic compounds (VOC) limits as established in the Massachusetts Department of Environmental Protection promulgated Adhesives and Sealants regulations, 310 CMR 7.18(30)."

1.14 DISPOSAL OF REMOVED MATERIALS: Dumpsters placed on site require a permit. Permits are obtained from the USCG FED Safety Office. All material removed by the contractor that is not indicated to be salvaged by the Government shall become the property of the contractor. This material shall be disposed of legally off of Joint Base Cape Cod property. The contractor shall not cause, suffer, or permit the handling, transportation, or storage of any material in a manner which results, or may result in emissions that cause or contribute to a condition of air pollution, any debris which could create air-borne dust must be shipped in a closed container or wet down and securely tarped over. The contractor is responsible to comply with all applicable federal, state and local environmental and disposal regulations. The contractor shall submit to the COR the following:

1.14.1 Bill of lading for all disposed materials.

1.14.2 Copy of landfill receipts.

1.14.3 Recyclers operating permit.

1.15 SUBMITTAL DESCRIPTION: Samples, catalog cuts, shop drawings, and other information shall be submitted by the contractor as required by the list of submittals on the Submittal Register Form(s) which is included in this specification. No other forms shall be used or will be accepted by the COR

1.15.1 The contractor shall submit a list of all hazardous materials with Material Safety Data Sheets (MSDS) to the COR for approval prior to work commencement on this project. Storage of hazardous materials will not be permitted on Joint Base Cape Cod property.

1.15.2 The contractor shall submit a list of all trade licenses.

1.15.3 All materials used by the contractor shall comply with VOC Emission limits for use in the Commonwealth of Massachusetts (310 CMR 7.00). Cleaning and maintenance of the contractor's and sub-contractor's equipment shall not be conducted on Joint Base Cape Cod property.

1.15.4 The contractor shall ensure that adequate protective measures are taken to minimize personnel exposure to harmful substances. If protective measures are required, the contractor shall include them in a Safety Plan and they shall be reviewed by the Contracting Officer prior to the start of any contract work involving use of the harmful substance.

1.16 RESTORATION AND CLEAN-UP: All areas disturbed by construction shall be restored to match the condition and material that existed prior to the start of work. The contractor shall keep the work areas clean of trash and debris at all times. The contractor shall not allow trash or debris to blow from the work area.

1.17 GOVERNMENT INSPECTION: The contractor shall keep the COR informed of contract operations and plans so that they may arrange to be present at the various times that work is being performed.

1.18 PERFORMANCE PERIOD: All work under this contract including site cleanup, punch list, acceptance by the COR and required submittals shall be completed within (30) calendar days of issuance of the Notice to Proceed (NTP) by the Contracting Officer unless stated otherwise.

1.19 WARRANTY: The provisions of the entire warranty clause from paragraph 52.246-21 (April 84) and Federal Acquisition Regulation are incorporated into this contract. The clause is written, in part, as follows:

“In addition to any other warranties set out elsewhere in this contract, the contractor shall warrant that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material, or design furnished or workmanship performed by the contractor or any of his sub-contractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the work.”

END OF GENERAL SECTION

SECTION 323113

D1 ENFORCEMENT FENCE PROJECT

1.0 GENERAL

The contractor shall provide all supervision, labor, tools, materials, transportation, equipment and other services necessary to demolish 150 linear feet of 8 foot tall security fence with rolling gates (Fig. 2). Furnish and install 225 linear feet of new 6 foot tall industrial grade, 9 gauge, galvanized fence with double swing gate 16 feet wide (Fig. 3) The 6 foot height consists of 6 ft of fabric. Refer to Figure (1) below for general requirements. Taut reinforcing wires shall be installed and interwoven or affixed with fabric ties along the top of the fence. The bottom of the fence shall receive a rail. The fence shall receive corner braces for stabilization. Top guard is not authorized. This list should not be considered complete. It represents the general items needed to complete the contract requirements.

1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A 116

(2005) Standard Specification for Metallic-Coated, Steel Woven Wire Fence Fabric

ASTM A 153/A 153M

(2005) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A 702

(1989; R 2006) Standard Specification for Steel Fence Posts and Assemblies, Hot Wrought

ASTM A 780

(2001; R 2006) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A 90/A 90M

(2007) Standard Test Method for Weight [Mass] of Coating on Iron and Steel Articles with Zinc or Zinc-Alloy Coatings

ASTM B 117

(2007) Standing Practice for Operating Salt Spray (Fog) Apparatus

ASTM C 94/C 94M

(2007) Standard Specification for Ready-Mixed Concrete

ASTM F 1043

(2006) Strength and Protective Coatings on Metal Industrial Chain-Link Fence Framework

ASTM F 1083

(2006) Standard Specification for Pipe, Steel, Hot-Dipped Zinc Coated (Galvanized) Welded, for Fence Structures

ASTM F 567

(2000) Standard Practice for Installation of Chain Link Fence

ASTM F 626

(1996a; R 2003) Standard Specification for Fence Fittings

ASTM F 883

(2004) Padlocks

ASTM G 23

(1996) Operating Light-Exposure Apparatus (Carbon-Arc Type) With and Without Water for Exposure of Nonmetallic Materials

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS RR-F-191

(Rev K) Fencing, Wire and Post Metal (and Gates, Chain-Link Fence Fabric, and Accessories)

FS RR-F-191/1

(Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Fabric)

FS RR-F-191/2

(Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Gates)

FS RR-F-191/3

(Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Posts, Top Rails and Braces)

FS RR-F-191/4

(Rev D) Fencing, Wire and Post, Metal (Chain-Link Fence Accessories)

1.2 SUBMITTALS: Government approval is required for submittals with a “G” designation. Submit the following in accordance with section 01 33 00 SUBMITTAL PROCEDURES:

A. Shop drawings for the following items:

a. Fence assembly

b. Location of gate corner end and pull posts

c. Gate assembly

d. Gate hardware and accessories

B. Product Data:

a. Fence Assembly

b. Gate Assembly

c. Gate Hardware and Accessories

C. Certificates:

a. Zinc Coating

b. Concrete

D. Manufacturer’s Instructions:

a. Fence Assembly

b. Gate Assembly

c. Hardware Assembly

d. Accessories

1.3 ASSEMLBY AND INSTALLATION INSTRUCTIONS:

Contractor shall provide manufacturer’s instructions that detail proper assembly and materials in the design for fence, gate, hardware and accessories.

Submit Erection/Installation drawing along with manufacturer’s catalog data for complete fence assembly, gate assembly, hardware assembly and accessories.

2 PRODUCTS

2.1 GENERAL:

Provide fencing materials that conform to the requirements of ASTM A 116, ASTM A 702, ASTM F 626, and as specified.

2.2 ZINC COATING

Ferrous-metal components and accessories must be hot-dip galvanized after fabrication and tested in accordance with ASTM A 90/A 90M.

2.3 FABRIC

FS RR-F-191/1; Type I, zinc-coated steel, 9 gage. Mesh size, 2 inches. Provide twisted and barbed at selvage. Height of fabric shall be 7 feet.

2.4 POSTS, BOTTOM RAILS, AND BRACES

FS RR-F-191/3; Class 1, steel pipe, Grade A; minimum sizes listed in FS RR-F-191/3 for each class and grade.

2.5 LINE POSTS

Minimum acceptable line posts over 6 feet high must be 2 inch outside diameter pipe weighing 3.65 pounds per linear foot.

2.6 END, CORNER, AND PULL POSTS

End, corner, and pull posts shall be grade A: 2.87 inch outside diameter pipe weighing 5.79 pounds per linear foot.

2.7 SLEEVES

Provide sleeves for setting into concrete constriction of the same material as post sections. Size shall be 1 inch greater than the diameter or dimension of the post. Weld flat plates to each sleeve base to provide anchorage and percent intrusion of concrete.

2.8 BOTTOM RAIL

Bottom rails must conform to minimum sizes specified in FS RR-F-191/3 for each class and grade.

2.9 POST-BRACE ASSEMBLY

Bracing must consist of 1.66 inches outside diameter pipe Grade A weighing 2.27 pounds per linear foot and 3/8 inch adjustable truss rods and turnbuckles.

2.10 TENSION WIRE

Wire shall be galvanized, No. 7 gage, coiled spring wire, provided at the bottom of the fabric only. Provide zinc coating that weighs not less than 1.6 ounces per square foot.

2.11 STRETCHER BARS

Provide bars that have one piece lengths equal to the full height of the fabric with a minimum cross section of 3/16 by ¾ inches, in accordance with ASTM A 116, ASTM A 702, and ASTM F 626.

2.12 POST TOPS

Provide tops that are steel designed as a weather tight closure cap. Provide one cap for each post, unless equal protection is provided by a combination post-cap and barbed wire supporting arm.

2.13 STRETCHER BAR BANDS

Provide bar bands for securing stretcher bars to posts that are steel, wrought iron, or malleable iron spaced not over 15 inches on center. Bands may also be used in conjunction with special fittings for securing rails to posts. Provide bands with projecting edges chamfered or eased.

2.14 GATE HARDWARE AND ACCESSORIES

Provide gate hardware and accessories that conform to ASTM A 116, ASTM A 702, ASTM F 626, and be as specified:

· Provide latch that permits operation from either side of the gate, with a padlock eye provided as an integral part of the latch.

· Provide stops and holders of malleable iron for vehicular gates.

2.15 MISCELLANEOUS HARDWARE

Provide miscellaneous hot dip galvanized hardware as required.

2.16 WIRE TIES

Wires for tying fabric to line posts must be nine gage galvanized steel wire spaced 12 inches on center. For tying fabric to rails and braces, wire ties must be spaced 24 inches on center. For tying fabric to tension wire, 0.105 inch hog rings must be spaced 24 inches on center.

Manufacturer’s standard procedure will be accepted if of equal strength and durability.

2.17 CONCRETE

Provide concrete conforming to ASTM C 94/C 94M. Concrete mix must obtain a minimum 28 day compressive strength of 3,000 psi.

2.19 PADLOCKS

Provide padlocks conforming to ASTM F 883, with chain.

PART 3 EXECUTION

3.1 GENERAL

Complete installation must conform to ASTM G 567.

3.2 EXCAVATION

Excavation for post footings must be drilled holes in virgin or compacted soil, of minimum sizes as indicated.

Placement of footings for the line posts shall be in accordance with the manufacturer’s recommendation and not less than a maximum of 10 feet on center and closer intervals as necessary.

Bottoms of the holes must be approximately 3 inches below the bottoms of the posts. Set bottom of each post not less than 3 feet 6 inches below finished grade when in firm, undisturbed soil. Footing diameter shall be minimum 10 inches for fence posts and 16 inch diameter for gate posts. Set posts deeper as required, in soft and problem soils and for heavy, lateral loads.

3.3 SETTING POSTS

Remove loose and foreign materials from holes and the soil moistened prior to placing concrete.

Provide tops of footing that are trowel finished and sloped or domed to shed water away from posts. Set hold-open devices, sleeves, and other accessories in concrete.

Keep exposed concrete moist for at least 7 calendar days after placement or cured with a membrane curing material, as approved.

3.4 CONCRETE STRENGTH

Provide concrete that has attained at least 75 percent of its minimum 28 day compressive strength, but in no case sooner than 7 calendar days after placement, before rails, tension wire, or fabric are installed. Fabric and wires must not be stretched or gates hung until the concrete has attained its full design strength.

Samples and test concrete must be taken to determine strength as specified.

3.5 CENTER RAILS

Center rails must be one piece between posts set flush with posts on the fabric side, using special offset fittings where necessary.

3.6 BRACE ASSEMBLY

Contractor must provide bracing assemblies at end and gate posts and at both sides of corner and pull posts, with the horizontal brace located at mid height of the fabric.

Install brace assemblies so posts are plumb when the diagonal rod is under proper tension.

3.7 TENSION WIRE INSTALLATION

Install tension wire by weaving them through the fabric and tying them to each post with not less than 7 gauge galvanized wire or by securing the wire to the fabric with 9 gauge ties or clips spaced 24 inches on center.

3.8 FABRIC INSTALLATION

Provide fabric in single lengths between stretch bars with bottom barbs placed approximately 1 ½ inches above the ground line. Pull fabric taut and tied to posts, rails, and tension wire with wire ties and bands.

Install fabric on the security side of fence, unless otherwise directed.

Fabric shall remain under tension after the pulling force is released.

3.9 STRETCHER BAR INSTALLATION

Thread stretcher bars through or clamped to fabric 4 inches on center and secured to posts with metal bands spaced 15 inches on center.

3.10 GATE INSTALLATION

Install gates plumb, level, and secure, with full opening without interference. Install ground set items in concrete for anchorage as recommended by the fence manufacturer. Adjust hardware for smooth operation and lubricated where necessary.

3.11 TIE WIRES

Provide tie wires that are U shaped to the pipe diameters to which attached. Twist ends of tie wires not less than two full turns and bent so as not to present a hazard.

3.12 FASTENERS

Install nuts for tension bands and hardware on the side of the fence opposite the fabric side. Peen ends of bolts to prevent removal of nuts.

3.13 ZINC COATING REPAIR

Clean and repair galvanized surfaces damaged by welding or abrasion, and cut ends of fabric, or other cut sections with specified galvanizing repair material applied in strict conformance with the manufacturer’s printed instructions.

3.14 TOLERANCES

Provide posts that are straight and plumb within a vertical tolerance of ¼ inch after the fabric has been stretched. Provide fencing and gates that are true to line with no more than ½ inch deviation from the established centerline between line posts. Repair defects as directed.

3.15 FENCE INSTALLATION

Secure fastening and hinge hardware in place to fence framework by peening or welding. Allow for proper operation of components. Coat peened or welded areas with a repair coating matching original coating. Install fence in accordance with fence manufacturer’s written installation instructions except as modified herein.

3.15.1 Post Spacing

Provide line posts spaced equidistantly apart, not exceeding 10 feet on center. Provide gate posts spaced as necessary for size of gate openings. Do not exceed 500 feet on straight runs between braced posts. Provide corner or pull posts, with bracing in both directions, for changes in direction of 15 degrees or more, or for abrupt changes in grade. Provide drawings showing location of gate, corner, end and pull posts.

3.15.2 Top and Bottom Tension Wire

Install top and bottom tension wires before installing chain link fabric, and pull wires taut. Place top and bottom tension wires within 8 inches of respective fabric line.

3.16 ACCESSORIES INSTALLATION

3.16.1 Post Caps

Install post caps as recommended by the manufacturer.

3.16.2 Padlocks

Provide padlocks for gate openings and provide chains that are securely attached to gate or gate posts. Provide padlocks keyed alike, and provide two keys for each padlock.

3.17 CLEANUP

Remove waste fencing materials and other debris from the work site.

(Fig. 1) Standard chain link fence design - security wire is not authorized

(Fig. 2) Fence section to be demolished

(Fig. 3) New fence to be installed

(Fig.4) Detail of existing fence and gates to be demolished

(Fig.5) Detail of existing fence and gate to be demolished

(Fig.6) Detail of existing gate to be demolished

All entries shall be filled in by typewriter or pen and ink.

CONTRACT NUMBER:
Project Title / Location:
____________________
_________________________________________________
PROJECT NUMBER:
Date:_______________

Item

No.

Specification Section and Paragraph No.
Description of Material (include Type, Model No., Manufacturer, etc.)
Appr-

Oved Dis-

Appvd See

Below Init

Items Marked Properly
Contractor (Name/Address)
By (Signature/Date)

Yes No

****FOR GOVERNMENT USE ONLY****

CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE

TO: CONTRACTOR

1. Approved or disapproved as indicated above and subject to any applicable comments noted below and/or on submittals.

2. Require prompt resubmittal on disapproved items.

Name and Grade (Typed or Printed)
Signature
Date

INSPECTION AND ACCEPTANCE

INSPECTION OF CONSTRUCTION (FAR 52.246-12) (AUG 1996)

DELIVERIES OR PERFORMANCE

COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (FAR 52.211-10) (APR 1984)

Work shall be completed, inspected and accepted no later than 45 days after award or approved schedule without prior approval of contracting officer.

SUSPENSION OF WORK (FAR 52.242-14) (APR 1984)

CONTRACT ADMINISTRATION

INVOICING REQUIREMENTS (FIRM FIXED-PRICE)

(a) Invoices shall be prepared and submitted in accordance with the provisions of FAR clause 52.232-27, "Prompt Payment for Construction Contracts." Payments will not be made more frequently than once per month.

(b) Each invoice shall contain the following information:

(1) Contract and Delivery/Task Order Number

(2) Name of the Contract Specialist or Contracting Officer

(3) Invoice Routing Code (IRC) assigned by the Coast Guard

(4) Annotate on the invoice indicating that the Contractor represents a small business for accelerated payments

NOTE: SCANNED INVOICES FOR FINAL PAYMENT SHALL BE ACCOMPANIED BY A FULLY

EXECUTED CONRACTOR’S RELEASE, DHS FORM 700-3. Partial payments –complete house only are authorized.

(c) The Coast Guard unique Invoice Routing Code (IRC) for this contract or delivery/task order is:

BASE

BOSTON

(d) Each invoice must be submitted to the designated billing office via one of the following modes, listed in descending order of preference:

(1) FINCEN Website invoice receipt form: http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm (2) Fax: (757-523-6900) (3) Mailed to: Commercial Invoices U.S. Coast Guard Finance Center 1430A Kristina Way Chesapeake, VA 23326

(e) To facilitate processing, all proper invoices and any supporting information submitted electronically using the FINCEN web based invoice submission capability must be submitted as a single Adobe .pdf formatted file, or as otherwise specified in the contract.

(f) Supporting documentation along with a courtesy copy of the invoice shall also be e-mailed to the Contract Specialist and COR at the addresses cited below:

Contract Specialist: Jane.mckenzie@uscg.mil Inspector: Albert Pulsifer, USCG Base Cape Cod

(g) In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed or transmitted via facsimile, the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;

(2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or

(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(4) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(5) Payment inquiries and status may be obtained - at the following website: https://www.fincen.uscg.mil/secure/payment.htm.

CONTRACT ADMINISTRATION

The Contracting Officer, U.S. Coast Guard, Base Boston will administer this contract. All matters related to the performance of this contract, and all correspondence, shall be coordinated with the Contract Branch and be directed to:

USCG Base Boston Attention: Jane Mckenzie 427 Commercial St Boston MA 02109 Tel: 617-223-3159 Fax: 617-223-3145 E-mail:

Jane.Mckenzie@uscg.mil

SPECIAL CONTRACT REQUIREMENTS

INSURANCE - WORK ON A GOVERNMENT INSTALLATION (FAR 52.228-5) (JAN 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective

(1) for such period as the laws of the State in which this contract is to be performed prescribe or

(2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

REQUIREMENT FOR INSURANCE

In accordance with the provisions of FAR Clause 52.228-5, "Insurance - Work on a Government Installation," the Contractor shall furnish to the Contracting Officer, a certificate of insurance, identified by contract number, as evidence of the existence of the following minimum insurance coverages:

Type of Coverage

Accident
Per Person
Per Accident
Property

Comprehensive

General Liability

$500,000

Automobile Liability
$200,000
$500,000
$20,000

Workmen's Compensation--As required by Federal and State Law. Full insurance coverage in accordance with the U.S. Longshoremen's and Harbor Worker's Compensation Act, 33 USC 901 et seq. will be required when a specific project involves operations in or on piers or waterways. All insurance policies shall provide for notice of cancellation and shall be given to the Contracting Officer not less than 30 days before the effective date of such cancellation, and the certificates of insurance shall indicate that the above provision has been included.

NOTIFICATION OF MILLER ACT PAYMENT BOND PROTECTION (USCG) (HSAR 3052.228-90)(DEC 2003) This notice clause shall be inserted by first tier subcontractors in all their subcontracts and shall contain the surety which has provided the payment bond under the prime contract.

(a) The prime contract is subject to the Miller Act (40 USC 270), under which the prime contractor has obtained a payment bond. This payment bond may provide certain unpaid employees, suppliers, and subcontractors a right to sue the bonding surety under the Miller Act for amounts owed for work performed and materials delivered under the prime contract.

(b) Persons believing that they have legal remedies under the Miller Act should consult their legal advisor regarding the proper steps to take to obtain these remedies. This notice clause does not provide any party any rights against the Federal Government, or create any relationship, contractual or otherwise, between the Federal Government and any private party.

(c) The surety which has provided the payment bond under the prime contract is:

(Name)

(Street Address)

(City, State, Zip Code)

(Contact and Telephone No.)

SUBCONTRACT DATA

The Contractor shall submit an executed Statement and Acknowledgement (SF 1413), to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done BEFORE the subcontractor begins work.

This form provides an acknowledgment by the subcontractor that mandatory "flow-down" contract clauses have been included in his contract in accordance with FAR clause 52.222-11, "Subcontracts (Labor Standards)." A copy of Form SF 1413 will be given to the Contractor at time of award. Completing this form creates no contractual relationship between the subcontractor and the Government.

CONTRACT CLAUSES

TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL ITEMS) (FAR 52.213-4)(FEB 2016)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

(ii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(iii) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

(iv) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(v) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(vi) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply: (i) 52.232-1, Payments (Apr 1984).

(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).

(iii) 52.232-11, Extras (Apr 1984).

(iv) 52.232-25, Prompt Payment (Jul 2013).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

(vii) 52.233-1, Disputes (May 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (Dec 2015).

(ix) 52.253-1, Computer Generated Forms (Jan 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).

(ii) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2016) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (May 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).

(v) 52.222-36, Equal Employment for Workers with Disabilities (Jul 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States.) (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (Oct 2015) (38 U.S.C. 4212) (Applies to contracts of $150,000 or more).

(vii) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf.)

(viii)(A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).

(B) Alternate I (Mar 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (Executive Order 13658) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(x) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xi) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP) will be—

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xii) 52.225-1, Buy American —Supplies (May 2014) (41 U.S.C. chapter 83) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition--

(A) Is set aside for small business concerns; or

(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792) (Applies to contracts greater than $25,000 that provide for the provision, the service, or the sale of food in the United States).

(xiv) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) database as its source of EFT information.)

(xv) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)

(xvi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. App.1241) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)

(2) Listed below are additional clauses that may apply:

(i) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (Applies to contracts over $35,000).

(ii) 52.211-17, Delivery of Excess Quantities (Sep 1989) (Applies to fixed-price supplies).

(iii) 52.247-29, F.o.b. Origin (Feb 2006) (Applies to supplies if delivery is f.o.b. origin).

(iv) 52.247-34, F.o.b. Destination (Nov 1991) (Applies to supplies if delivery is f.o.b. destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-13 Systems for Award Management Maintenance (Jul 2013) 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-14 Limitations on Subcontracting (Nov 2011) 52.219-28 Post Award Small Business Program Representation (Jul 2013) 52.222-6 Construction Wage Rate Requirements (May 2014) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (May 2014) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (Sep 2013) 52.223-17

Affirmative Procurement of EPA-designated items in Service and Construction Contracts (May 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.228-1 Bid Guarantee (Sep 1996) Bid Guarantee is not required;

52.228-2 Additional Bond Security (Oct 1997) 52.228-11 Pledges of Assets (Jan 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.232-5 Payments Under fixed-Price Construction Contracts…