2015OCT23_Building_261Theater_Asbestos_Abatement_SOW.pdf

PDF 1 MB Posted

Attached to
THEATER ASBESTOS ABATEMENT
Solicitation number
HSCG49-16-P-QE2064
Issued by

About this file

SCOPE OF WORK

View the file

Other files

File Type Posted
lab_test.pdf PDF
SF-18_PG1.pdf PDF
SF-18_PG1.pdf PDF
Wage_Det._05-2069.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

U.S. Coast Guard Training Center

Petaluma, California 94952

Project Specification

For

BUILDING 261 THEATER CARPET MASTIC ASBESTOS ABATEMENT

November 2015

U.S. Coast Guard Training Center Petaluma Approval Date

Dave Coons, Environmental Protection Specialist

Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS 3

SECTION 01 11 00 - GENERAL PARAGRAPHS

SECTION 01 11 03 – CONTRACTOR QUALIFICATIONS

SECTION 01 11 05 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION

SECTION 01 11 06 – ASBESTOS ABATEMENT STATEMENT OF WORK

SECTION 01 33 00 - SUBMITTALS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 11 00 - GENERAL PARAGRAPHS

PART 1 GENERAL:

1.1 PROJECT BRIEF: The intent of this project is to safely and properly remove and properly dispose of approximately 1000 sq ft of red and black colored carpeting inside of Building 261 Theater. The existing carpet has been laid over remnants of mastic that still contains asbestos from a previous VAT or carpet removal project.

Limited initial testing of the mastic material shows that it still contains 5% Chryso-tile Asbestos. The cutting of various holes or ripping up sections of carpeting throughout the entire theater to perform a comprehensive investigation was not permitted due to safety concerns for the patrons and staff. It should be noted that the Theater is still currently in operation and used daily. The Theater will be closed for the duration of the carpet and mastic removal.

This Theater is used daily and by people of all ages and therefore AIR CLEARANCE TESTING is going to be required and must pass in order to prove that the indoor environment is suitable for occupancy.

The TRACEN Facilities Engineering Maintenance Department will remove the pop-corn machine, desk, shelving and cabinets that are moveable out of the way, prior to the start of the abatement work.

The abatement contractor will be allowed to cordon off as much of the parking lot in front of the Theater deemed necessary to set up the containment structure(s), staging of support equipment and the disposal dumpsters/containers.

1.2 PROJECT BACKGROUND: The Building 261 Theater underwent a renovation in the summer of 2007 and at that time records show that some VAT and Mastic were abated in the lobby and office/popcorn/refreshment room. Sampling results show that there are still some areas that contain mastic with Asbestos.

1.3 LOCATION: Project site is located in the TRACEN Town Center, Building 261 Thea-ter at Training Center, Petaluma, CA.

DKCoons Callout OFFICE/POPCORN/REFRESHMENT ROOM - Carpet is to be removed and thoroughly cleaned.

DKCoons Callout Cleaning Gear Room - Carpet is to remain

DKCoons Callout This is a older drawing and the carpeted area from the entry sliding glass doors to the auditorium doors has been replaced with ceramic tile.

DKCoons Line

DKCoons Callout Underneath all 3 seating sections is painted concrete floor.

BLDG 261 THEATER BUILDING

U.S. COAST GUARD TRAINING CENTER PETALUMA

599 TOMALES ROAD, PETALUMA, CA

BUILDING 261 THEATER FRONT

1.4 PRECONSTRUCTION CONFERENCE: The Contractor shall provide a list of all on-site personnel to Facility Engineering Representative, Ms. Sarah Case, e- mail ad-dress Sarah.L.Case@uscg.mil, including all sub-contractors and suppliers. The con-tractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be re-stricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have US Government issued photo identification, current car registration and insurance at all times while working on Coast Guard facilities.

1.5 POST AWARD: Contractors shall email the Facility Engineering Representative Ms.

Sarah Case, at 1 working day in advance for the contractor deliveries, subcontrac-tors and prime contractor personnel. Information to include company name, per-sonnel, and phone numbers. Otherwise access to the Coast Guard facility will be denied.

BUILDING 261 THEATER FRONT LOBBY ENTRANCE

POPCORN MACHINE AND OFFICE ROOM

mailto:Sarah.L.Case@uscg.mil

1.6 CONTINUITY OF FACILITIES OPERATION:

A. Schedule work to minimize interference with the facility’s normal operations.

Notify the COR in advance of any shutdowns.

B. Perform all on-site visitation or work between the hours of 7:00 AM and 4:30 PM, Monday through Friday (Federal Holidays excluded).

C. The Theater will not be occupied during this project.

1.7 NOTICE TO PROCEED (NTP) Notice to Proceed (NTP) begins the Project Award.

The Contractor shall not begin Construction until required materials are on site.

1.8 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall no-tify the Contracting Officer in writing five (5) working days in advance of the date he intends to commence on-site work, and five (5) working days prior to the date that work will be ready for final inspection.

1.9 The Prime Contractor is to have a company employee job superintendent or as-signed subcontractor project superintendent on site during construction of the project.

1.10 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess or waste materials result-ing from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recy-cling disposal shall be done in accordance with federal, state, and local laws and regulations.

1.11 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents.

1.12 TEMPORARY FACILITIES:

A. STORAGE: A location for exterior stock piling of materials shall be reviewed and approved by the Project Manager. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area. Contractor shall remove any residual ma-terials and return site to its original condition on completion of work.

B. SANITARY FACILITIES: Contractor to provide their own portable bathroom at the job site.

C. WATER AND ELECTRICITY: Water and 120V and 240V electricity are availa-ble at no cost to the Contractor, exception during outage when the contrac-tor has to provide their own portable generators. Cost of these utility con-nections and disconnections shall be the responsibility of the Contractor. Per-sonnel using extension cords to bring power from another location to con-struction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (gfcis), even if connecting to building wiring. Care shall be taken not to overload circuits providing power to existing equipment.

1.13 Any damage to building, site, etc shall be repaired by the Contractor at no addi-tional cost to the Government.

1.14 EXISTING UTILITIES: Utility locations shown are only approximate. The Contrac-tor shall field verify all utility locations with an certified and licensed utility locating company. An approved USCG dig permit is required prior to any trenching or dig-ging. This shall include but not be limited to the use of sonic, electronic or mag-netic detection devices, by noting pull box and utility box locations at the surface, and by potholing. Contractor shall be responsible for repairing any utilities dam-aged during construction at no additional cost to the Government.

1.15 PROJECT SCHEDULE: If applicable, the contractor to provide updates every 2 weeks that shows work in the next 2 weeks. There shall be weekly progress meet-ings.

1.16 DRAWINGS:N/A

1.17 ABBREVIATIONS:

A. GFE: Government furnished equipment.

B. IMC: International Mechanical Code

C. IBC: International Building Code

D. NEC: National Electric Code

E. ACM: Asbestos-containing material

F. ACBM: Asbestos-containing building material

G. AHERA: Asbestos Hazard Emergency Response Act of 1986

H. ANSI: American National Standards Institute

I. ASTM: American Society for Testing and Materials

J. BAAQMD: Bay Area Air Quality Management District

K. CAA: Clean Air Act

L. KO: Contracting Officer

M. COR: Contracting Officer’s Representative

N. EPA: Environmental Protection Agency

O. EPS: USCG TRACEN Environmental Protection Specialist

P. IH: Industrial Hygienist

Q. NESHAP: National Emission Standards for Hazardous Air Pollutants

R. NIOSH: National Institute for Occupational Safety and Health

S. OSHA: Occupational Safety and Health Administration

T. PEL: Permissible Exposure Limit

U. PLM: Polarized Light Microscopy

V. RCRA: Resource Conservation and Recovery Act

W. TEM: Transmission Electron Microscopy

X. TRACEN: Training Center

Y. TSCA: Toxic Substances Control Act

Z. USCG: U. S. Coast Guard

PART 2 PRODUCTS – NOT USED.

PART 3 EXECUTION - NOT USED.

END OF SECTION

SECTION 01 11 03 – CONTRACTOR QUALIFICATIONS

PART 1 GENERAL:

1.1 All Contractors to have current and active license.

1.2 Hazardous Removal Contractor Qualifications:

A. HAZ - Hazardous Substance Removal Certification.

B. ASB - Asbestos Certification.

C. Contractor shall provide copies of the following; Certificates or equivalent for Asbestos Supervisor and Asbestos Worker training, along with medical clearance and certificate verifying respirator training for each worker at the job site.

END OF SECTION

SECTION 01 11 05 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION

PART 1 GENERAL:

1.1 This Section is not intended to be a comprehensive list and does not include all of the requirements incorporated in the regulations listed. Prior to conducting asbes-tos, lead, and or Polychlorinated Biphenyl (PCB) abatement activities, all personnel associated with the project should review and fully understand the requirements of all applicable local, state, and federal regulations that may apply to the worksite.

1.2 CODES AND REGULATIONS: All work shall confirm to the standards set by appli-cable federal, state, and local laws, regulations, statutes, ordinances, and guide-lines in such form in which they exist at the time of the work on the contract and as may be required by subsequent revisions. While the following is not meant to be construed as, nor shall the Contractor shall consider it to be, an all inclusive list, this project is at least subject to compliance with the most current issue of the following regulations and publications:

A. The lists of Codes and Regulations have been placed in Section 01 11 06 – Asbestos Abatement for page conservation measures.

1.3 HAZARDOUS MATERIAL TESTING: Not known to exist.

1.4 UNFORESEEN HAZARDOUS MATERIALS: The contractor shall comply with the re-quirements of this specification in the event any materials are encountered which may pose a potential health hazard.

A. If, during the course of work, materials that are found that may be hazard-ous to human health upon disturbance during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days, the Government will determine if the material is hazard-ous. If the material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If the material is haz-ardous and handling of the material is necessary to accomplish the work, the Government will issue a contract modification.

B. If asbestos is the hazard of concern, the materials shall be tested following the negative assessment protocol found in 40 CFR Part 763, Asbestos Haz-ards and Emergency Response Act (AHERA).

1.5 DEFINITIONS:

A. Sediment: Soil and other debris that has been eroded and transported by runoff water.

B. Solid Waste: Rubbish, debris, sanitary waste, and other discarded solid ma-terials resulting from industrial, commercial, and agricultural operations, and from community activities.

C. Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

D. Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.

E. Chemical Wastes: Includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

F. Sanitary Waste (sewage):Wastes characterized as domestic sanitary sewage.

G. Sanitary Waste (garbage): Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

H. Asbestos and Asbestos Materials: Asbestos means actinolite, amosite, antophyllite, chrysotile, crocidolite, and tremolite. Asbestos material means asbestos or any material containing asbestos such as asbestos waste, scrap, debris bags, containers, equipment, and asbestos-contaminated clothing consigned for disposal. Friable asbestos material means any material that contains more than one percent asbestos by weight and that can be crum-bled, pulverized, or reduced to powder, when dry, by hand pressure.

I. Oily Waste: Includes petroleum products and bituminous materials.

J. PCB (Polychlorinated Biphenyls): Toxic and non-biodegradable materials used extensively under trade names, such as Pyranol or Askarel, as insulat-ing cooling fluids in capacitors and transformers.

K. Hazardous Material (HM): Chemicals defined by OSHA 29 CFR 1926.59 and under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transpor-tation to present risks to safety, health, and property during transportation.

The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.

L. Hazardous Substance: Substances defined under the Clean Water Act and CERCLA as chemicals which are harmful to aquatic life or the environment and are regulated, if spilled or otherwise released to the environment. The EPA has designated "reportable quantities" for each hazardous substance under CERCLA. If an amount equal to or greater than the reportable quantity of a hazardous substance is released to the environment, that spill must be reported.

M. Hazardous Waste (HW): Substances which are hazardous and have been discarded are regulated as hazardous waste under RCRA or State Health and Safety Codes and their implementing regulations. A waste is hazardous if it meets certain levels of reactivity, ignitability, corrosives, or toxicity, or is oth-erwise listed as a hazardous waste in Title 40 CFR Part 261 or in the respec-tive State Health and Safety Code or Code of Regulations.

N. Lead Containing Paint: Paint or other similar surface coating material con-taining lead or lead compounds and in which the lead content is in excess of 0.06% by weight of the total non-volatile content of the paint or the weight of the dried paint film. Abatement of paint containing even trace amounts of lead must meet the requirements of Federal and State laws for protection of employees (e.g., 29 CFR 1926.62).

1.6 SUBMITTALS: Submit the following in accordance with Section 01 33 00, "Submit-tals":

A. Hazardous Waste Handling Plan: Comply with all local, state, and federal laws and regulations when handling hazardous materials and disposing of and handling hazardous and other wastes. The Contractor shall have a com-pliance program outlining how the contractor handles and disposes of haz-ardous materials, petroleum products, hazardous substances, and hazardous waste. The program shall include, but is not limited to, the following ele-ments as appropriate: a general storage site plan, methods used to analyze whether generated material (blasting debris, paint waste, etc.) is hazardous, any hazardous waste licenses and permits, air district permits, and the iden-tification of hazardous waste and material transportation and disposal con-tractors. The Coast Guard has the right to require removal from the contract performance of any subcontractor who fails to comply with these laws and regulations or who fails to provide appropriate evidence of compliance with them.

B. Materials Safety Data Sheets (MSDS's): Copies of all MSDS's for all hazardous materials (including petroleum products) shall be submitted along with a list-ing of quantities of these hazardous materials proposed to be stored on site.

C. Asbestos Documentation: Copies of all notifications and documentation re-quired by 29 CFR 1926.1101 and 40 CFR 61.

D. Lead Sampling Certifications: If lead sampling is accomplished under this contract, provide EPA certificates for personnel evaluating the material (lead risk assessors) and certifications of laboratories performing analytical tests for lead.

E. Lead and Asbestos Test Results: Submit full copies of all lead and asbestos sampling and analysis results.

1.7 ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain environ-mental protection during the life of the Contract to control pollution or to correct conditions that develop during construction. Comply with all Federal, State, and local laws and regulations pertaining to water, air, soil, and noise pollution.

1.8 PROTECTION OF NATURAL RESOURCES: Construction equipment is to be kept in good repair, without leaks of hydraulic or lubricating fluids. If such leaks or drips do occur, they shall be cleaned up immediately. Drip pans shall be utilized when vehicles are parked. Confine equipment maintenance and/or repair to one loca-tion. Control runoff in this area to prevent contamination of soils and water.

A. At or before Contract completion, obliterate all signs of temporary construc-tion facilities such as haul roads, work areas, structures, foundations of tem-porary structures, stockpiles of excess or waste materials, and all other ves-tiges of construction. Temporary roads, parking areas, staging areas, and similar temporary use areas where excavation has been accomplished shall be graded in conformance with surrounding areas. Restore all disturbed are-as to their original condition.

1.9 CONTROL AND DISPOSAL OF WASTES: With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials become the contractor's property and shall be removed from the job site daily.

A. Hazardous Waste Disposal. Any hazardous waste generated by work under this contract is the responsibility of the Contractor and shall be disposed of in accordance with all applicable federal, state, and local regulatory require-ments. Along with the Government, the Contractor is the co-generator of any hazardous waste. As the other co-generator the Government shall make available its facility's EPA generator ID number for manifesting of hazardous waste. The Contractor shall arrange and be responsible for the transporta-tion and final disposal of any hazardous waste. Comply with applicable parts of 40 CFR 262. Any manifest of hazardous waste shall be signed by the Gov-ernment Hazardous Materials/Hazardous Waste Coordinator (aka. EPS) at the work site (hereinafter "HM/HW Coordinator"). The Contractor shall con-tact the HM/HW Coordinator for disposal of any hazardous waste. No con-tractor or subcontractor shall have the authority to sign a hazardous waste manifest using the facility's EPA generator ID number. Only the HM/HW Co-ordinator may sign a manifest for hazardous waste.

B. Hazardous Spill Response: Store chemical waste in corrosion resistant con-tainers labeled to identify type of waste and date filled. Comply with 49 CFR

178. Remove containers from Government property and dispose of in ac-cordance with Federal, State, and local regulations. Submit a certified copy of the acceptance receipts for these materials, indicating quantities. For oil and hazardous material spills which may be large enough to violate Federal, State, and local regulations, notify the Contracting Officer immediately.

C. Dispose of petroleum products and petroleum contaminated soil and water in accordance with procedures meeting Federal, State and Local regulations.

Comply with 40 CFR 761 for removal and disposal of PCB containing articles.

D. Comply with 40 CFR 262 and 263, 29 CFR 1910.120, and state regulations for removal, transportation and disposal of hazardous waste as discussed in the Contractor's HM/HW Handling Plan.

E. Asbestos. In no case, will any asbestos be cut or otherwise treated without compliance with the Coast Guard Asbestos Exposure Control Manual (COMDTINST M6260.16). In addition to COMDTINST M6260.16, any asbes-tos abatement operations must comply with all Federal, state and local laws and regulations including 40 CFR §61.150; National Emission Standards for Asbestos. Provide all notices to the EPA as required by 40 CFR §61.145 prior to commencing asbestos removal work. Whenever this contract provides more than one standard for asbestos abatement, the contractor must comply with the most restrictive law or regulation. The Contractor will provide forty-eight hours written notice to the Contracting Officer before commencing any asbestos work. Should there be any question as to the existence of asbestos in any material which may be disturbed, it must be treated as if it were as-bestos until positively identified.

1.10 FALL PROTECTION: Per 29 CFR 1926.501-502, employees engaged in roofing ac-tivities on low slope roofs, with unprotected sides and edges 6 feet or more above lower levels, shall be protected from falling by guardrail systems, safety net sys-tems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, warning line system and personal fall arrest system, or warning line system and safety monitoring sys-tem. Or, on roofs 50-feet or less in width, the use of a safety monitoring system alone (i.e. without the warning line system) is permitted.

1.11 DUST CONTROL: Keep dust down at all times, including non-working hours, weekends, and holidays. Sprinkle or treat with dust suppressors, and other areas disturbed by operations. No dry power brooming is permitted. Instead, use vacu-uming, wet mopping, wet sweeping, or wet power brooming. Air blowing is per-mitted only for cleaning non-particulate debris, such as steel reinforcing bars. No sandblasting is permitted unless dust is confined. Only wet cutting of concrete blocks, concrete, and asphalt is permitted. No unnecessary shaking of bags is permitted where bagged cement, concrete mortar, and plaster is used.

1.12 NOISE: Make the maximum use of "low-noise-emission products" as certified by EPA and described at 40 CFR Part 204. No blasting or use of explosives is permit-ted. Comply with applicable portions of the Noise Control Act (NCA). The Contrac-tor is responsible for complying with all other federal, state, and local noise control laws and regulations.

1.13 Provide safety of USCG personnel during construction.

1.14 During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction, and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4, Construction Safety Orders, and U.S. Army Corps of Engineers Safety and Health Requirements Manual. An Acci-dent Prevention Plan (or California Injury and Illness Prevention Plan) shall be submitted.

END OF SECTION

SECTION 01 11 06 – ASBESTOS ABATEMENT STATEMENT OF WORK

PART 1 GENERAL:

1.1 GENERAL SCOPE OF WORK: This asbestos abatement work area is located in the interior of the Theater Building and the work will consist of class II work in the removal of the existing red and black carpet (approximately 1000 sq ft) and the mastic (containing 5% Chrysotile Asbestos) underneath the carpet. The Contrac-tor SHALL make every effort and precaution to prevent the release of asbestos fi-bers outside of the containment barriers. This document is not intended to be a comprehensive list and does not include all of the requirements incorporated in the regulations listed. Prior to conducting asbestos abatement activities, all per-sonnel associated with the project should review and fully understand the re-quirements of ALL applicable local, state, and federal regulations that may apply to the worksite.

A. The Contractor shall provide all necessary transportation, supplies, equip-ment, labor and materials to perform abatement project work at USCG Train-ing Center, Petaluma, CA.

B. Perform all planning, coordination, administration, execution, and cleaning necessary to safely remove the Non-friable, Non Hazardous Waste Mastic and carpeting indicated in the Contract Documents. Asbestos survey reports are available at TRACEN Environmental Office.

C. Obtain acceptance from an authorized landfill that will accept this type of waste, and provide a copy of written approval from the landfill.

D. Theater Work: The work areas shall be contained by installing poly critical barriers and splashguards and a HEPA filtered exhaust system installed.

Carpet mastic is to be removed manually by utilizing an organic soybean sol-vent or similar product to remove the mastic. The carpet and removed mas-tic maybe disposed of as non-friable, non-hazardous asbestos waste and will be allowed to leave the TRACEN Property under a Non-hazardous Waste Manifest to the designated landfill.

E. Notify the COR or EPS for observation of initial cleaning to determine com-pleteness. Re-clean areas that are not completely cleaned.

F. After a settling period perform second cleaning of all horizontal surfaces in work area and immediately adjacent areas.

G. Notify the COR or EPS to schedule visual observation of final cleaning to de-termine completeness for encapsulation application.

H. Properly package and dispose of all ACM and asbestos-contaminated waste materials in an approved permitted landfill. Provide landfill receipts to docu-ment proper disposal of waste.

I. No work to commence until the contractor has an approved schedule to pro-ceed by USCG.

J. Contractor to move around equipment or other miscellaneous items and move back to perform work to gain adequate access.

K. Provide submittals per section 01 33 00.

1.2 FINAL ACCEPTANCE:

A. Final acceptance of the project is based on completion of work per specifica-tions and any modifications.

1.3 EXECUTION OF ABATEMENT WORK:

A. Work in a manner that has minimal disruption to the facility operations. Per-form daily cleanup to insure sanitary and safe conditions at the job site.

B. During abatement work, discrepancies or deficiencies will be transmitted by COR to the contractor in writing and/or verbal comments.

C. When applicable - The use of torches would be considered hot work and should be noted in the Contractor's Accident Prevention Plan as requiring the use of a hot work permit system for fire prevention (ref: EM-385-1-1 and NFPA 241, Chapter 5.1 Hot Work).

D. Wherever practicable, the work area shall be fenced, barricaded, or other-wise blocked off from the public to prevent unauthorized entry into the work area. When work is to be performed over a public thoroughfare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades.

When the exposure to heaving falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

1.4 ABATEMENT COMPLETION:

A. Upon completion, the Contractor shall insure that the project site is clean and ready for use.

B. A deficiency punch list will be generated by Contractor based on COR defect comments.

C. A final inspection will be held to determine whether any defects or omissions are apparent.

D. The BAAQMD requires a 10 day prior notification and permit fee to be paid for renovations and demolitions projects that contain Asbestos and even Non-Asbestos containing projects (See Reference 1.5.F.1.a – b).

E. The prevailing winds of TRACEN Petaluma come from the West blowing to the East and are generally stronger in the afternoon. The Contractor SHALL make every effort and precaution to prevent the release of Asbestos Fibers outside of the containment barriers.

F. This document is not intended to be a comprehensive list and does not in-clude all of the requirements incorporated in the regulations listed. Prior to conducting asbestos abatement activities, all personnel associated with the project should review and fully understand the requirements of ALL applica-ble local, state, and federal regulations that may apply to the worksite.

1.5 CODES AND REGULATIONS

A. All work shall conform to the standards set by applicable federal, state, and local laws, regulations, statutes, ordinances, and guidelines in such form in which they exist at the time of the work on the contract and as may be re-quired by subsequent revisions. While the following is not meant to be con-strued as, nor shall the Contractor shall consider it to be, an all inclusive list, this project is at least subject to compliance with the most current issue of the following regulations and publications:

B. U.S. Coast Guard Directives:

1. U. S. Coast Guard, Safety and Environmental Health Manual, COMDTINST M5100.47 (series)

2. U. S. Coast Guard, Hazardous Waste Management, COMDTINST M16478.1 (series)

3. U. S. Coast Guard, Civil Engineering Manual, COMDTINST M11000.11 (se-ries)

4. U. S. Coast Guard, Asbestos Exposure Control Program, TRACENPETINST M6260.3 (series)

C. U.S. Department of Labor, Occupational Safety and Health Administration

(OSHA):

1. 29 CFR 1910, General Industry Standard

2. 29 CFR 1926, Construction Industry Standard

D. U.S. Environmental Protection Agency (EPA):

1. 40 CFR 61 - Subparts A and M: U.S. Environmental Protection Agency Regulations for Asbestos.

2. 40 CFR 204, Noise Abatement Program for Construction Equipment.

3. 40 CFR 260, General Regulations for Hazardous Waste Management

4. 40 CFR 261, Identification and Listing of Hazardous Waste

5. 40 CFR 262, Standards Applicable to Generators of Hazardous Waste

6. 40 CFR 263, Standards Applicable to Transporters of Hazardous Waste

7. 40 CFR 264, Owners and Operators of Hazardous Waste Treatment, Stor-age, and Disposal Facilities

8. 40 CFR 265, Interim Status Standards for Owners and Operators of Haz-ardous Waste 1.3.3.9. Treatment, Storage and Disposal Facilities

9. 40 CFR 268, Land Disposal Restrictions

10. 40 CFR 302, Designation, Reportable Quantities (RQs) and Notification

11. 40 CFR Part 467: National Emission Standards for Asbestos, Asbestos Stripping, Work Practices, and Disposal of Waste.

12. 40 CFR 745, Lead; Requirements for Lead-Based Paint activities in Tar-get Housing and Child Occupied Facilities; Final Rule

13. EPA 560/5-85-024 Guidance for Controlling Asbestos Containing Mate-rials in Buildings.

E. U.S. Department of Transportation (DOT):

1. 49 CFR 172, Hazardous Materials Tables and Hazardous Materials Com-munications Regulations

2. 49 CFR 178, Shipping Container Specification

3. 34 CFR, Part 231 - Appendix C, Procedures for containing and Removing Building Materials Containing Asbestos.

4. American National Standards Institute (ANSI) Publication: Z9.2-79 Fun-damentals Governing the Design and Operation of Local Exhaust Sys-tems.

F. State and Local Regulations:

1. Bay Area Air Quality Management District (BAAQMD)

a. Regulation 11, Hazardous Pollutants, Rule 2 Asbestos Demolition, Renovation and Manufacturing.

b. Regulation 3, Fees, Section 317 and Schedule L.

2. California Code of Regulations, Title 8, Section 1529, Asbestos

3. California Code of Regulations, Title 8, Section 5208, Asbestos

G. NOTE: Contractor should contact all appropriate State and local officials to insure that all asbestos related rules and regulations are being complied with.

H. Upon request, the Abatement Contractor will be furnished a single copy of the lab reports for samples collected within target areas of this project.

1.6 PROTECTION/SECURITY

A. The Contractor shall take all necessary precautions to prevent injury to the public or damage to property of others. For the purpose of this contract, the public or building occupants shall include all persons not employed by the Contractor or a subcontractor working under his/her direction.

B. Storing, positioning or use of equipment, tools, materials, scraps, and trash in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.

C. Work shall not be performed in any area occupied by the public unless spe-cifically permitted by the contract or the COR or EPS and unless adequate steps are taken for the protection of the public.

D. Wherever practicable, the work area shall be fenced, barricaded, or other-wise blocked off from the public to prevent unauthorized entry into the work area.

E. Public Thoroughfare: When work is to be performed over a public thorough-fare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades. When the exposure to heaving falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

F. Fences and barricades shall be removed upon completion of the project, in accordance with local ordinance and to the satisfaction of the COR or EPS.

1.7 QUALITY ASSURANCE

A. Contractor Qualifications: The Contractor shall be firm of established reputa-tion (or if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which main-tains a regular force of workmen skilled in asbestos abatement, and shall have performed this work on previous projects. See the “Submittals” para-graph and Appendices “A “and “B” to this Section for additiona1, qualification requirements.

B. New Contractors: Newly formed/organized asbestos abatement CONTRAC- TORS must provide the same amount of documentation as established CON- TRACTORS. They are not exempt from any of the “Appendix A” submittal re-quirements. They too need to demonstrate a proficiency and knowledge based on both experience and training. This is especially true of the Superin-tendent they plan on using for the Project.

C. Independent Test Laboratory Qualifications: Laboratory shall be an inde-pendent test laboratory regularly engaged in asbestos testing, and a current and successful participant in the NIOSH-Proficiency Analytical Testing Pro-gram for Asbestos Air Sample Analysis. Personnel used for monitoring air-borne concentrations of asbestos fibers shall be proficient in this field, be an industrial hygienist who is qualified to be certified by the American Board of Industrial Hygienist or under the direct supervision of a certified industrial hygienist and have three years experience in air monitoring asbestos. The independent test laboratory shall provide IH personnel or recommend a IH/consultant source who are thoroughly trained and experienced in the fol-lowing.

D. “Monitoring” asbestos abatement projects to insure that these specifications, other EPA and OSHA regulations etc., are being complied with and that all aspects of abatement work are being performed in a safe and professional manner: keeping complete and meaningful daily logs, taking and analyzing all required air monitoring samples for the asbestos abatement project (PCM analysis)(Note: All samples will be PCM samples unless otherwise specified), and remaining at the project site full time during the asbestos abatement ac-tivities.

E. As a minimum, IH personnel used must have satisfactorily completed “NIOSH 582-Sampling and Evaluating Airborne Asbestos Dust” course and have “monitored” at least two asbestos abatement projects where the asbes-tos part of the contract exceeded $200,000.

F. Laboratory personnel shall take all air-monitoring samples and analyze them during the period of the asbestos abatement project and not analyze them after the project is done

1.8 ASBESTOS CONTROL LIMITS

A. Inside Asbestos Work Area: Permissible Exposure Limits (i.e., PEL'S) air con-centrations of asbestos shall not exceed an 8-hour time weighted average of

0.1 fibers (longer than 5 micrometers), per cubic centimeter of air and the Short Term Exposure Limit (STEL) shall not exceed 1.0 f/cc (longer than 5 micrometers) for any 30 minute period.

B. Outside Asbestos Work Area: Air concentrations of asbestos shall be main-tained at an 8-our time weighted average less than 0.01 fibers (longer than 5 microns) per cubic centimeter of air. This applies to all areas in the building except for the asbestos work area while in progress and after final clean-up and clearance.

C. In those cases where the outside work area levels are not 0.01 fibers per cubic centimeter those “baseline” values shall become the new control limits for corresponding “during” and "final clearance” levels.

D. Under no circumstances shall the air concentration baseline levels outside the work area increase from their “baseline” levels.

E. Certificates of Compliance: Submit certification that vacuums, ventilation equipment, and other equipment required to contain airborne asbestos fibers conform to ANSI 29.2.

F. Information on Encapsulating Material: Submit written evidence that material meets the latest requirements of the Environmental Protection Agency (EPA) and possesses the specified characteristics.

G. Safety Data Sheets (SDS): Submit a Safety Data Sheet (SDS) on encapsulants or sealants and on solvents proposed to be used to remove VAT mastics.

H. Landfill Location: Contractor should submit the name, address and telephone number of the owner/manager of the approved dumpsite. Contractor shall furnish a copy of transportation company manifest or receipt from dumpsite operation when and where waste was received for each load deposited. The

Contractor is also required by EPA to provide the OWNER a copy of the As-bestos Waste Manifest signed by an approved landfill manager not more than 30 calendar days after the asbestos waste has been transported off of the project site

I. Air Monitoring Reports: The air-monitoring records shall be reported by the air-monitor within 2 hours of each samples completion to the individual des-ignated by the Contracting Officer. In the event that the air monitoring re-sults exceed the control limits, the abatement shall be stopped until the nec-essary corrective actions which must be taken have been identified and im-plemented. Regular (daily) written information which should be made availa-ble to the COR or EPS shall include the following for each air sample taken:

1. The specific location of the pump,

2. The time of day and number of minutes, during which the sample was taken,

3. The calibration of the pump in liters per minute,

4. The total volume of air sampled,

5. The 8-hour time weighted average concentration of asbestos fibers per cc of air sampled.

6. Certify that all air-monitoring equipment used was in proper calibration during the project.

J. Asbestos – “Work Area” Sketch: Draw up a neat and legible sketch of each work area and adjacent room. On these sketches show the location of all air samples taken, the number designated to each sample at each location, the location of the decontamination chamber and the negative air machines and their exhausts, and the location of bag out (load out) chambers if used on project. There should be separate sketches for each shift.

K. Daily Log: A copy of the Superintendents and IH’s daily log shall be made available at the end of each asbestos abatement work day at the project.

L. These submittals in the paragraphs above are to be made available to the COR or EPS daily. If there are not Contracting Officer Representatives pre-sent at the end of any particular asbestos work day, this data shall be accu-mulated and given to the representative at the next on site visit. "Copies of the air sampling results should also be provided to the Buildings Manager on a daily basis for “Posting” for building occupant inspection.”

M. Paragraph 1.29.G presents the requirements for the Summary Air Monitoring Reports which are required to be submitted within two calendar weeks after the asbestos abatement portion of the abatement project has been complet-ed.

1.9 CONTRACTOR RESPONSIBILITY

A. Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection for workers, visitors to the “work area” and persons occupying areas adja-cent to the “work area”. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and local regulations, and shall hold the Gov-ernment harmless for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

1.10 DELIVERABLES

A. The Abatement Contractor will provide the COR and EPS with the following information and documentation prior to commencement of on-site work.

1. When applicable - The original Bay Area Air Quality Management Dis-trict’s Asbestos Demolition/Renovation Notification From with BAAQMD job number affixed to it. Refer to BAAQMD Regulation 11, Rule 2, Sec-tion 401, Regulation 3, Fees, Section 317 and Schedule L.

2. A copy of each on-site asbestos worker’s certificate of training. Certifi-cate must bear the name of the individual and state that the individual has received training complying to 29 CFR 1926.1101 or 40 CFR 763, Subpart E, Appendix C. Individuals without a certificate of training will not be permitted to enter the regulated area.

3. A current copy of Abatement Contractor’s certification as an asbestos abatement contractor.

4. The Abatement Contractor will provide the COR and EPS with the fol-lowing information and documentation prior to receiving 100% pay-ment, and/or final payment.

a. All manifests, hazardous or non-hazardous, used to transport ACM waste materials to an authorized disposal facility. All manifests returned to the Generator, the Training Center, shall bear the sig-nature of an authorized person for the disposal facility acknowl-edging receipt and acceptance of the Training Center’s waste.

1.11 PROJECT/SITE CONDITIONS

A. Means of Egress: Establish and maintain emergency and fire exits from the work area.

B. All non-asbestos containing building materials shall be segregated out from the waste ACM to the extent feasible and disposed of as construction debris.

C. Asbestos waste must be bagged wet in accordance with applicable federal, state and local requirements. Asbestos waste must be either double bagged, or the single bags must be in metal or plastic drums prior to their transport to the covered dumpster suitable for Asbestos Disposal.

D. Three days prior to the removal of the asbestos waste from the Training Center the Contractor shall supply the Project Manager with the name, tele-phone number, and EPA ID Number of the proposed waste disposal facility to be used in conjunction with this contract. The Training Center reserves the rights to either accept or reject proposed disposal facility. If rejected, it will be the Contractor’s responsibility to find an acceptable alternative dis-posal facility at no additional cost to the Coast Guard. All ACM waste materi-als shall be transported to the disposal site under the control of a hazardous waste manifest or non-hazardous manifest, whichever is applicable for the type of waste being transported. The Training Center’s EPS shall sign all manifests for the Generator.

E. The Covered dumpster must be lined with 6 mil plastic in a manner to cover over the entire load for transport.

F. Asbestos Abatement Contractor shall also have suitable WARNING SIGNS on display at the self contained dumpster while asbestos waste is being loaded and while full dumpster remains on site awaiting transport. The Contractor shall also insure that the transport vehicle is properly placarded with Hazard-ous Materials Warning Placard Class 9 Miscellaneous prior to departure from the site.

1.12 ENVIRONMENTAL CONDITIONS TO BE MAINTAINED

A. Inside Asbestos Work Area: Permissible Exposure Limits, (i.e., PEL'S). Air concentrations of asbestos shall not exceed an eight-hour time weighted av-erage of 0.1 fibers (longer than 5 micrometers) per cubic centimeter of air and the (STEL) Short Term Exposure Limit shall not exceed 1.0 f/cc (longer than 5 micrometers) for 30 minute period.

B. Outside Asbestos Work Area: Air concentrations of asbestos shall be main-tained below eight-hour time weighted average of 0.01 fibers (longer than 5 microns), per cubic centimeter of air. This applies to all areas in the building except for the asbestos work area, while work is in progress and after final clean-up and clearance.

C. In those cases where the outside work area levels are not 0.01 fibers per cubic centimeter those “baseline” values shall become the new control limits for corresponding “during” and “final clearance” levels.

D. Under no circumstances shall the air concentration baseline levels outside the work area increase from their “baseline” levels.

E. Access to Work Area: Access to work area shall be through decontamination chambers. Only those persons properly fit tested, under a current medical surveillance program, and outfitted in the proper PPE shall be granted access to the work area.

F. Daily air monitoring test results shall be furnished at the end of each asbes-tos abatement shift to the COR and EPS.

1.13 EQUIPMENT

A. Equipment, including protective clothing and respirators, used in the execu-tion of this contract and provided to visitors on the site, shall comply with all applicable Federal, State and local regulations.

1.14 PERSONNEL PROTECTION AND PROCEDURES

A. Work clothes shall consist of disposable coveralls and head covers, boots, and respiratory protective equipment as required by OSHA regulations. Eye protection and hard hats should be available and worn when appropriate.

B. Respiratory protection for workers shall be provided by the Contractor as re-quired by current OSHA regulation. Respirators shall be selected from those approved by the Mine Safety and Health Administration (MSHA) and the Na-tional Institute for Occupational Safety and Health (NIOSH) for use in at-mosphere containing asbestos fibers. A NIOSH approved respirator contains the following: an assigned identification number placed on each unit; a label identifying the type of hazard the respirator is designed to protect against;

additional information on the label which indicates limitations and identifies the component parts approved for use with the basic unit. The approved respirator shall be worn for the individual working conditions.

1.15 OSHA SPECIFIED PROTECTION FACTORS

A. Being a Certified Abatement Contractor, the contractor should be thoroughly familiar with these requirements; therefore they will not be listed.

1.16 ENCAPSULATING MATERIALS

A. This is a carpet and mastic removal project and Bridging and Penetrating en-capsulation materials (sealants) should not be required.

1.17 WETTING MATERIALS

A. For wetting prior to disturbance of asbestos containing materials, use either amended water or a removal encapsulant.

B. Provide water to which a surfactant has been added. Use a mixture of sur-factant and water which results in wetting of the asbestos containing materi-al and retardation of fiber release during disturbance of the material equal to be or greater than provided by the use of a surfactant consisting of one ounce of 50% polyoxyethylene ether mixed with five gallons of water.

C. Removal Encapsulant: Provide a penetrating, type encapsulant designated specifically for removal of asbestos-containing material. Use a material which results in wetting of the asbestos-containing material and retardation of fiber release during disturbance of the material equal to or greater, than that pro-vided by water amended with a surfactant consisting of one ounce of 50% polyoxyethylene enter and 50% polyoxyethylene ether mixed with five gal-lons of water.

1.18 PRE-ASBESTOS REMOVAL PREPARATION (FOR OTHER THAN GLOVE BAG RE-

MOVAL)

A. Being a Certified Abatement Contractor, the contractor should be thoroughly familiar with these requirements; therefore they will not be listed.

1.19 METHODS OF ASBESTOS REMOVAL FOR OTHER THAN GLOVE BAG REMOVAL

A. Being a Certified Abatement Contractor, the contractor should be thoroughly familiar with these requirements; therefore they will not be listed.

1.20 FIELD QUALITY CONTROL (ALL WORK AREAS)

A. Monitoring of airborne concentrations of asbestos shall be in accordance with 29 CFR 1926.1001, and Monitor the airborne concentration of asbestos be-fore starting work to obtain a baseline fiber concentration in the affected ar-eas. Then alternately (4 on & 4 off) monitor every eight hours inside the work area during the work shift. Air samples taken outside the entrance to the decontamination chambers entrance and at the exhaust opening of the local exhaust system shall be taken for eight hour periods, unless the results in the air filters become overloaded. If monitoring shows airborne concentra-tions greater than the asbestos control limits, stop all work, correct the con-ditions causing the excessive levels, and notify the COR or Contracting Of-ficer immediately. In addition, monitor airborne concentrations of asbestos after final clean-up and prior to the removal of the enclosure of the asbestos control area, both inside and outside all work areas. See 1.26., 1.27. and

1.28. of this section for additional Test Laboratory, Industrial Hygienist and Air- Monitoring requirements.