2015JUL29_Building_130_Boiler_Exhaust_Stack_Asbestos_Abatement_SOW.pdf

PDF 3 MB Posted

Attached to
ASBESTOS REMOVAL Federal contract opportunity
Solicitation number
HSCG49-16-P-PFP100
Issued by
Department of Homeland Security US Coast Guard

About this file

Scope of work

View the file

Other files for this federal contract opportunity

Other files attached to ASBESTOS REMOVAL, newest first.
File Type Posted
Wage_Det._05-2069.txt TXT text file
SF-18_PG1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

U.S. Coast Guard Training Center

Petaluma, California 94952

Project Specification

For

BUILDING 130 BOILER EXHAUST STACK ASBESTOS ABATEMENT

PSN 7067897

July 2015

U.S. Coast Guard Training Center Petaluma Approval Date

Dave Coons, Environmental Protection Specialist David K. Coons 08/07/2015

Tony Van Winden, P.E.

Chief, Engineering Services

Anthony van Winden

08/07/2015

Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS 3

SECTION 01 11 00 - GENERAL PARAGRAPHS

SECTION 01 11 01 – SUMMARY OF WORK

SECTION 01 11 03 – CONTRACTOR QUALIFICATIONS

SECTION 01 11 05 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION

SECTION 01 11 06 – ASBESTOS ABATEMENT

SECTION 01 33 00 - SUBMITTALS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 11 00 - GENERAL PARAGRAPHS

PART 1 GENERAL

1.1 PROJECT BRIEF: A pre-proposal submittal site walk visit is recommended. The intent of this project is to safely remove and properly dispose of what appears to be the original boiler exhaust stack from 1966. The stack is being removed as part of a boiler replacement project and the stack is not required for the new boil-er being installed.

This project will be awarded based on Price and Technical Capability. The per-spective bidders must submit a resume and/or proof of their capability in handling the proper removal and disposal of five (5) boiler stack sections of an undeter-mined weight.

1.2 PROJECT BACKGROUND: The Building 130 Mace Hall Barracks was constructed in 1966 and is a two (2) story building with a low pitched roof. The building is asymmetrical and constructed of concrete masonry units. The boiler room is a 10’ by 16’ room (approx. 160 sq.ft), a ceiling height of approximately 20’ with 6 foot wide double doors that open to a concrete porch. The stack is located in the far back left corner of the bldg 130 Mace Hall Barracks mechanical room. There are some interferences (heating water supply and return piping, propane piping, uni-strut metal channeling, ventilation ducting) that will need to be removed and properly restored to their original found positions. The stack is a twenty-three

(23) inch outside diameter and approximately 20’ in height with a sheet metal ex-terior. The stack has five (5) visible sections. During a second phase of investiga-tive sampling, the stack was discovered to have a dark gray colored cementitious lining (not sampled). The contractor will be requested to sample this cementitious lining material and request a same day turnaround from a certified lab for further determination and the proper disposal considerations of the stack. The stack joints contain a gray cementitious sealant underneath the sheet metal bands and was sampled and found to contain 15% Chrysotile Asbestos. The joint sealant is in a degraded state and could be considered friable and therefore, deemed as a regulated asbestos containing material (RACM). The contractor shall reduce the risk of Asbestos exposure to those individuals, who during the course of executing Asbestos abatement operations in the Building 130 Mace Hall Barracks boiler room and surrounding area will be exposed to RACM. This action is in alignment with Commandant Instruction M6260.16A, which states, “Unprotected personnel shall not be exposed to airborne asbestos fiber concentrations greater than 0.1 fibers per cubic centimeter (0.1 f/cc) averaged over an eight-hour day” for occupational exposure levels. In addition, the intent of this project is to comply with the Bay Area Air Quality Management District’s (BAAQMD) Regulation 11, Rule 2, which requires the removal of RACM from a structure prior to demolition beginning

BLDG 130 MACE

HALL BARRACKS,

MECHANICAL ROOM

IS LOCATED ON THE

EAST SIDE IN THE

MIDDLE OF THE

BLDG

BLDG 130 MACE HALL BARRACKS, EAST SIDE

MECHANICAL ROOM ENTRY

DOORS. THE ONLY SIDEWALK IS

FROM THE NORTH PARKING LOT

1.3 LOCATION: Project site is located in Building 130 Mace Hall Barracks at Training Center, Petaluma, CA.

1.4 PRECONSTRUCTION CONFERENCE: The Contractor shall provide a list of all on-site personnel to Facility Engineering Rep, jeffrey.w.bradshaw@uscg.mil, including all sub-contractors and suppliers. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas.

Any personnel violating this policy may lose access to the Coast Guard facility.

Contractor personnel shall have a valid US Government issued photo identification, current car registration and insurance at all times while working on Coast Guard facilities.

1.5 POST AWARD: Contractors shall email the Facility Engineering Representative Mr.

Jeffrey Bradshaw, at least 24 working hours in advance for the contractor deliver-ies, subcontractors and prime contractor personnel. Information to include com-pany name, personnel, and phone numbers. Otherwise access to the Coast Guard facility will be denied.

BLDG 130 MACE HALL BARRACKS, EAST SIDE

THE BOILER STACK CAP IS LOCATED BE-

HIND VENTILATION ROOF TOP HOOD

ROOF TOP ACCESS

MECHANICAL ROOM ENTRY DOORS.

mailto:jeffrey.w.bradshaw@uscg.mil

1.6 CONTINUITY OF FACILITIES OPERATION:

A. Schedule work to minimize interference with the facility’s normal operations.

Notify the COR five (5) working days in advance of any shutdowns.

B. Perform all on-site visitation or work between the hours of 7:00 AM and 4:30 PM, Monday through Friday (Federal Holidays excluded).

C. The room will not be occupied during this project.

1.7 NOTICE TO PROCEED (NTP) Notice to Proceed (NTP) begins the Project Award.

The Contractor shall not begin Construction until required materials are on site.

1.8 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall no-tify the Contracting Officer in writing five (5) working days in advance of the date he intends to commence on-site work, and five (5) working days prior to the date that work will be ready for final inspection.

1.9 The Prime Contractor is to have a company employee job superintendent or as-signed subcontractor project superintendent on site during construction of the project.

1.10 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess or waste materials result-ing from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recy-cling disposal shall be done in accordance with federal, state, and local laws and regulations.

1.11 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents.

The abatement contractor will be allowed to cordon off as much of the area in front of the boiler room deemed necessary to set up the containment structure(s), staging of support equipment and the disposal dumpsters/containers.

1.12 TEMPORARY FACILITIES:

A. STORAGE: A location for exterior stock piling of materials shall be reviewed and approved by the Project Manager. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area. Contractor shall remove any residual ma-terials and return site to its original condition on completion of work.

B. SANITARY FACILITIES: Contractor will be allowed to utilize the bathroom fa-cilities on the 1st floor, provided that all workers are clean prior to entry into the building.

C. WATER AND ELECTRICITY: Water and 120V and 240V electricity are availa-ble at no cost to the Contractor, exception during outage when the contrac-tor has to provide their own portable generators. Cost of these utility con-nections and disconnections shall be the responsibility of the Contractor. Per-sonnel using extension cords to bring power from another location to con-struction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (gfcis), even if connecting to building wiring. Care shall be taken not to overload circuits providing power to existing equipment.

1.13 Any damage to building, site, etc shall be repaired by the Contractor at no addi-tional cost to the Government.

1.14 PROJECT SCHEDULE: The contractor to provide updates every 2 weeks that shows work in the next 2 weeks. There shall be weekly progress meetings.

1.15 DRAWINGS:N/A

1.16 ABBREVIATIONS:

A. GFE: Government furnished equipment.

B. IMC: International Mechanical Code

C. IBC: International Building Code

D. NEC: National Electric Code

E. ACM: Asbestos-containing material

F. ACBM: Asbestos-containing building material

G. AHERA: Asbestos Hazard Emergency Response Act of 1986

H. ANSI: American National Standards Institute

I. ASTM: American Society for Testing and Materials

J. BAAQMD: Bay Area Air Quality Management District

K. CAA: Clean Air Act

L. KO: Contracting Officer

M. COR: Contracting Officer’s Representative

N. EPA: Environmental Protection Agency

O. EPS: USCG TRACEN Environmental Protection Specialist

P. IH: Industrial Hygienist

Q. NESHAP: National Emission Standards for Hazardous Air Pollutants

R. NIOSH: National Institute for Occupational Safety and Health

S. OSHA: Occupational Safety and Health Administration

T. PEL: Permissible Exposure Limit

U. PLM: Polarized Light Microscopy

V. RCRA: Resource Conservation and Recovery Act

W. TEM: Transmission Electron Microscopy

X. TRACEN: Training Center

Y. TSCA: Toxic Substances Control Act

Z. USCG: U. S. Coast Guard

PART 2 PRODUCTS – NOT USED.

PART 3 EXECUTION - NOT USED.

END OF SECTION

SECTION 01 11 01 – SUMMARY OF WORK

PART 1 GENERAL

1.1 GENERAL SCOPE OF WORK:

This abatement project will take place in TRACEN Petaluma’s Bldg 130 Mace Hall Bar-racks Mechanical Room. The Contractor SHALL make every effort and precaution to prevent the release of asbestos fibers outside of the containment barriers. This docu-ment is not intended to be a comprehensive list and does not include all of the re-quirements incorporated in the regulations listed. Prior to conducting asbestos abate-ment activities, all personnel associated with the project should review and fully under-stand the requirements of ALL applicable local, state, and federal regulations that may apply to the worksite.

A. The Contractor shall provide all necessary supervision, transportation, sup-plies, equipment, labor and materials to perform construction work to facili-tate this abatement project at USCG Training Center, Petaluma, CA.

B. Perform all planning, coordination, administration, execution, and cleaning necessary to safely remove Regulated Asbestos-Containing Materials (RACM) found to be 15% Chrysotile Asbestos from the boiler room as indicated in the Contract Documents. Asbestos survey reports are available at TRACEN Envi-ronmental Office. Properly remove one (1) twenty-three (23) inch outside di-ameter and approximately 20’ in height with a sheet metal exterior boiler stack. This stack has five (5) visible sections covered by sheet metal bands that are fasten by threaded fasteners. Due to the finding of the dark gray cementitious inner lining a weight for each section is undetermined at this time.

C. Boiler Room Clean Up: Remove all visible accumulations of ACM or contami-nated material and debris, pieces of loose pipe and wood. The end result shall be a clean floor, raised cement boiler foundation and any piping per-manently attached to the floor by bolted down clamps. Clean all surfaces in-side of the containment area in the boiler room.

NOTE: Secondary containment or a decontamination station may have to be constructed /setup outside of the mechanical room.

D. Notify the COR or EPS for observation of initial cleaning to determine com-pleteness. Re-clean areas that are not completely cleaned.

E. After a settling period perform second cleaning of all horizontal surfaces in work area and immediately adjacent areas.

F. Notify the COR or EPS to schedule visual observation of final cleaning to de-termine completeness for encapsulation application.

G. Properly package and dispose of all ACM and asbestos-contaminated waste materials in an approved permitted landfill. Provide landfill receipts to docu-ment proper disposal of waste.

H. Provide submittals per section 01 33 00.

I. No work to commence until the contractor has an approved schedule to pro-ceed by USCG.

J. Contractor to move around equipment or other miscellaneous items and move back to perform work to gain adequate access.

K. Provide submittals per section 01 33 00.

1.2 FINAL ACCEPTANCE:

A. Final acceptance of the project is based on completion of work per specifica-tions and any modifications.

1.3 CONSTRUCTION MATERIAL SUBMITTALS: Prior to purchasing and installing mate-rials, submittals for the materials shall receive government approval. See Section 01 33 00.

1.4 CONSTRUCTION SERVICES: After Notice to Proceed (NTP), provide all labor, de-sign, materials and equipment needed to complete the construction of the new equipment in accordance with the approved plans and specifications.

1.5 EXECUTION OF CONSTRUCTION WORK:

A. Work in a manner that has minimal disruption to the facility operations. Per-form daily cleanup to insure sanitary and safe conditions at the job site.

B. During construction, discrepancies or deficiencies will be transmitted by COR to the contractor in writing and/or verbal comments.

C. The use of torches would be considered hot work and should be noted in the Contractor's Accident Prevention Plan as requiring the use of a hot work permit system for fire prevention (ref: EM-385-1-1 and NFPA 241, Chapter

5.1 Hot Work).

D. Wherever practicable, the work area shall be fenced, barricaded, or other-wise blocked off from the public to prevent unauthorized entry into the work area. When work is to be performed over a public thoroughfare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades.

When the exposure to heaving falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

Note: The Contractor will be allowed to fence/barricade off as much of the area in front of the boiler room to properly accomplish this tasking. Fences and barricades shall be removed upon completion of the project, in accordance with local ordi-nance and to the satisfaction of the COR or EPS.

1.6 CONSTRUCTION COMPLETION:

A. Upon completion, the Contractor shall insure that the project site is clean and ready for use.

B. A deficiency punch list will be generated by Contractor based on COR defect comments.

C. A final inspection will be held to determine whether any defects or omissions are apparent.

PART 2 PRODUCTS – NOT USED.

PART 3 EXECUTION - NOT USED.

PART 4 PHOTOS

VIEW OF HEATING WATER SUPPLY AND RETURN PIPING,

PROPANE PIPING INTERFERENCES

CONTRACTOR CAN OBTAIN PERMISSION TO

SECURE WATER HEATER AND REMOVE THE

PROPANE PIPING FOR THE DURATION OF

THE PROJECT

CEILING IS REPORTED TO BE

5/8 INCH GYPSUM BOARD AND

APPEARS TO BE ORIGINAL.

DUE TO HEIGHT RESTRICTIONS

NO SAMPLING WAS PER-

FORMED. THE CONTRACTOR

MAY PRESUME THAT THE IT

MAY CONTAIN ASBESTOS. THE

CONTRACTOR MAYBE RE-

QUIRED REMOVING ENOUGH

GYPSUM BOARD TO ALLOW FOR

THE REMOVAL OF THE TOP

STACK SECTION.

VENTILATION CONNECTION

BOX AND DUCTING MAY BE RE-

MOVED IF NEEDED.

CLOSE UP VIEW OF STACK BASE AND INTERFERENCES

BOILER FLUE PIPE CONNECTION INTO THE STACK. THE ORIGINAL 1965 BUILDING

DRAWINGS SHOW THIS CONNECTION WAS SUPPOSE TO HAVING AN ASBESTOS FLEX

COUPLING TO JOIN THE BOILER FLUE PIPE TO THE STACK. IN 1990 THE ORIGINAL

BOILER WAS REPLACED AND APPARENTLY THE ASBESTOS FLEX COUPLING WAS RE-

MOVED, ONLY FIBERGLASS MATERIAL WAS FOUND. THE LIGHT TAN CEMENTITIOUS

WAS APPARENTLY PUT IN 1990 WITH THE NEW BOILER. IT DOES NOT MATCH THE

DARK GRAY CEMENTITIOUS MATERIAL FURTHER BACK IN THE PIPE. THE TAN MA-

TERIAL WAS SENT OUT FOR ANALYSIS AND FOUND TO BE NON-DETECT FOR ASBES-

TOS FIBERS.

IT IS THE DARK GRAY CEMENTITIOUS MATERIAL THAT IS SUSPECTED AND RE-

QUIRED TO BE TESTED FOR PROOF THAT ASBESTOS FIBERS DO NOT EXIST, PRIOR

TO THE PROPER DISPOSAL OF THE PIPE SECTIONS.

SECTION 01 11 03 – CONTRACTOR QUALIFICATIONS

PART 1 GENERAL:

1.1 All Contractors to have current and active license.

1.2 Hazardous Removal Contractor Qualifications:

A. HAZ - Hazardous Substance Removal Certification.

B. ASB - Asbestos Certification.

C. Contractor shall provide copies of the following; Certificates or equivalent for Asbestos Supervisor and Asbestos Worker training, along with medical clearance and certificate verifying respirator training for each worker at the job site.

SECTION 01 11 05 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 This Section is not intended to be a comprehensive list and does not include all of the requirements incorporated in the regulations listed. Prior to conducting asbes-tos, lead, and or Polychlorinated Biphenyl (PCB) abatement activities, all personnel associated with the project should review and fully understand the requirements of all applicable local, state, and federal regulations that may apply to the worksite.

1.2 CODES AND REGULATIONS: All work shall confirm to the standards set by appli-cable federal, state, and local laws, regulations, statutes, ordinances, and guide-lines in such form in which they exist at the time of the work on the contract and as may be required by subsequent revisions. While the following is not meant to be construed as, nor shall the Contractor shall consider it to be, an all inclusive list, this project is at least subject to compliance with the most current issue of the following regulations and publications:

A. The lists of Codes and Regulations have been placed in Section 01 11 06 – Asbestos Abatement for page conservation measures.

1.3 HAZARDOUS MATERIAL TESTING: Not known to exist.

1.4 UNFORESEEN HAZARDOUS MATERIALS: The contractor shall comply with the re-quirements of this specification in the event any materials are encountered which may pose a potential health hazard.

A. If, during the course of work, materials that are found that may be hazard-ous to human health upon disturbance during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days, the Government will determine if the material is hazard-ous. If the material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If the material is haz-ardous and handling of the material is necessary to accomplish the work, the Government will issue a contract modification.

B. If asbestos is the hazard of concern, the materials shall be tested following the negative assessment protocol found in 40 CFR Part 763, Asbestos Haz-ards and Emergency Response Act (AHERA).

1.5 DEFINITIONS

A. Sediment: Soil and other debris that has been eroded and transported by runoff water.

B. Solid Waste: Rubbish, debris, sanitary waste, and other discarded solid ma-terials resulting from industrial, commercial, and agricultural operations, and from community activities.

C. Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

D. Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.

E. Chemical Wastes: Includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.

F. Sanitary Waste (sewage):Wastes characterized as domestic sanitary sewage.

G. Sanitary Waste (garbage): Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

H. Asbestos and Asbestos Materials: Asbestos means actinolite, amosite, antophyllite, chrysotile, crocidolite, and tremolite. Asbestos material means asbestos or any material containing asbestos such as asbestos waste, scrap, debris bags, containers, equipment, and asbestos-contaminated clothing consigned for disposal. Friable asbestos material means any material that contains more than one percent asbestos by weight and that can be crum-bled, pulverized, or reduced to powder, when dry, by hand pressure.

I. Oily Waste: Includes petroleum products and bituminous materials.

J. PCB (Polychlorinated Biphenyls): Toxic and non-biodegradable materials used extensively under trade names, such as Pyranol or Askarel, as insulat-ing cooling fluids in capacitors and transformers.

K. Hazardous Material (HM): Chemicals defined by OSHA 29 CFR 1926.59 and under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transpor-tation to present risks to safety, health, and property during transportation.

The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.

L. Hazardous Substance: Substances defined under the Clean Water Act and CERCLA as chemicals which are harmful to aquatic life or the environment and are regulated, if spilled or otherwise released to the environment. The EPA has designated "reportable quantities" for each hazardous substance under CERCLA. If an amount equal to or greater than the reportable quantity of a hazardous substance is released to the environment, that spill must be reported.

M. Hazardous Waste (HW): Substances which are hazardous and have been discarded are regulated as hazardous waste under RCRA or State Health and Safety Codes and their implementing regulations. A waste is hazardous if it meets certain levels of reactivity, ignitability, corrosives, or toxicity, or is oth-erwise listed as a hazardous waste in Title 40 CFR Part 261 or in the respec-tive State Health and Safety Code or Code of Regulations.

N. Lead Containing Paint: Paint or other similar surface coating material con-taining lead or lead compounds and in which the lead content is in excess of 0.06% by weight of the total non-volatile content of the paint or the weight of the dried paint film. Abatement of paint containing even trace amounts of lead must meet the requirements of Federal and State laws for protection of employees (e.g., 29 CFR 1926.62).

1.6 SUBMITTALS: Submit the following in accordance with Section 01 33 00, "Submit-tals":

A. Hazardous Waste Handling Plan: Comply with all local, state, and federal laws and regulations when handling hazardous materials and disposing of and handling hazardous and other wastes. The Contractor shall have a com-pliance program outlining how the contractor handles and disposes of haz-ardous materials, petroleum products, hazardous substances, and hazardous waste. The program shall include, but is not limited to, the following ele-ments as appropriate: a general storage site plan, methods used to analyze whether generated material (blasting debris, paint waste, etc.) is hazardous, any hazardous waste licenses and permits, air district permits, and the iden-tification of hazardous waste and material transportation and disposal con-tractors. The Coast Guard has the right to require removal from the contract performance of any subcontractor who fails to comply with these laws and regulations or who fails to provide appropriate evidence of compliance with them.

B. Materials Safety Data Sheets (MSDS's): Copies of all MSDS's for all hazardous materials (including petroleum products) shall be submitted along with a list-ing of quantities of these hazardous materials proposed to be stored on site.

C. Asbestos Documentation: Copies of all notifications and documentation re-quired by 29 CFR 1926.1101 and 40 CFR 61.

D. Lead Sampling Certifications: If lead sampling is accomplished under this contract, provide EPA certificates for personnel evaluating the material (lead risk assessors) and certifications of laboratories performing analytical tests for lead.

E. Lead and Asbestos Test Results: Submit full copies of all lead and asbestos sampling and analysis results.

1.7 ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain environ-mental protection during the life of the Contract to control pollution or to correct conditions that develop during construction. Comply with all Federal, State, and local laws and regulations pertaining to water, air, soil, and noise pollution.

1.8 PROTECTION OF NATURAL RESOURCES: Construction equipment is to be kept in good repair, without leaks of hydraulic or lubricating fluids. If such leaks or drips do occur, they shall be cleaned up immediately. Drip pans shall be utilized when vehicles are parked. Confine equipment maintenance and/or repair to one loca-tion. Control runoff in this area to prevent contamination of soils and water.

A. At or before Contract completion, obliterate all signs of temporary construc-tion facilities such as haul roads, work areas, structures, foundations of tem-porary structures, stockpiles of excess or waste materials, and all other ves-tiges of construction. Temporary roads, parking areas, staging areas, and similar temporary use areas where excavation has been accomplished shall be graded in conformance with surrounding areas. Restore all disturbed are-as to their original condition.

1.9 CONTROL AND DISPOSAL OF WASTES: With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials become the contractor's property and shall be removed from the job site daily.

A. Hazardous Waste Disposal. Any hazardous waste generated by work under this contract is the responsibility of the Contractor and shall be disposed of in accordance with all applicable federal, state, and local regulatory require-ments. Along with the Government, the Contractor is the co-generator of any hazardous waste. As the other co-generator the Government shall make available its facility's EPA generator ID number for manifesting of hazardous waste. The Contractor shall arrange and be responsible for the transporta-tion and final disposal of any hazardous waste. Comply with applicable parts of 40 CFR 262. Any manifest of hazardous waste shall be signed by the Gov-ernment Hazardous Materials/Hazardous Waste Coordinator (aka. EPS) at the work site (hereinafter "HM/HW Coordinator"). The Contractor shall con-tact the HM/HW Coordinator for disposal of any hazardous waste. No con-tractor or subcontractor shall have the authority to sign a hazardous waste manifest using the facility's EPA generator ID number. Only the HM/HW Co-ordinator may sign a manifest for hazardous waste.

B. Hazardous Spill Response: Store chemical waste in corrosion resistant con-tainers labeled to identify type of waste and date filled. Comply with 49 CFR

178. Remove containers from Government property and dispose of in ac-cordance with Federal, State, and local regulations. Submit a certified copy of the acceptance receipts for these materials, indicating quantities. For oil and hazardous material spills which may be large enough to violate Federal, State, and local regulations, notify the Contracting Officer immediately.

C. Dispose of petroleum products and petroleum contaminated soil and water in accordance with procedures meeting Federal, State and Local regulations.

Comply with 40 CFR 761 for removal and disposal of PCB containing articles.

D. Comply with 40 CFR 262 and 263, 29 CFR 1910.120, and state regulations for removal, transportation and disposal of hazardous waste as discussed in the Contractor's HM/HW Handling Plan.

E. Asbestos. In no case, will any asbestos be cut or otherwise treated without compliance with the Coast Guard Asbestos Exposure Control Manual (COMDTINST M6260.16). In addition to COMDTINST M6260.16, any asbes-tos abatement operations must comply with all Federal, state and local laws and regulations including 40 CFR §61.150; National Emission Standards for Asbestos. Provide all notices to the EPA as required by 40 CFR §61.145 prior to commencing asbestos removal work. Whenever this contract provides more than one standard for asbestos abatement, the contractor must comply with the most restrictive law or regulation. The Contractor will provide forty-eight hours written notice to the Contracting Officer before commencing any asbestos work. Should there be any question as to the existence of asbestos in any material which may be disturbed, it must be treated as if it were as-bestos until positively identified.

1.10 FALL PROTECTION: Per 29 CFR 1926.501-502, employees engaged in roofing ac-tivities on low slope roofs, with unprotected sides and edges 6 feet or more above lower levels, shall be protected from falling by guardrail systems, safety net sys-tems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, warning line system and personal fall arrest system, or warning line system and safety monitoring sys-tem. Or, on roofs 50-feet or less in width, the use of a safety monitoring system alone (i.e. without the warning line system) is permitted.

1.11 DUST CONTROL: Keep dust down at all times, including non-working hours, weekends, and holidays. Sprinkle or treat with dust suppressors, and other areas disturbed by operations. No dry power brooming is permitted. Instead, use vacu-uming, wet mopping, wet sweeping, or wet power brooming. Air blowing is per-mitted only for cleaning non-particulate debris, such as steel reinforcing bars. No sandblasting is permitted unless dust is confined. Only wet cutting of concrete blocks, concrete, and asphalt is permitted. No unnecessary shaking of bags is permitted where bagged cement, concrete mortar, and plaster is used.

1.12 NOISE: Make the maximum use of "low-noise-emission products" as certified by EPA and described at 40 CFR Part 204. No blasting or use of explosives is permit-ted. Comply with applicable portions of the Noise Control Act (NCA). The Contrac-tor is responsible for complying with all other federal, state, and local noise control laws and regulations.

1.13 Provide safety of USCG personnel during construction.

1.14 During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction, and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4, Construction Safety Orders, and U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385– 1–1. When the standards differ, the more restrictive standard shall apply. An Acci-dent Prevention Plan (or California Injury and Illness Prevention Plan) shall be submitted.

SECTION 01 11 06 – ASBESTOS ABATEMENT

PART 1

1.1 INTENT

A. The intent of this project is to perform all planning, coordination, administra-tion, execution, and cleaning necessary to safely remove Regulated Asbes-tos-Containing Materials (RACM) found to be 15% Chrysotile Asbestos from the BLDG 130 Mace Hall Barracks mechanical room. Properly remove one

(1) twenty-three (23) inch outside diameter and approximately 20’ in height with a sheet metal exterior boiler stack. This stack has five (5) visible sec-tions covered by sheet metal bands that are fasten by threaded fasteners.

Due to the finding of the dark gray cementitious inner lining a weight for each section is undetermined at this time. The contractor shall reduce the risk of Asbestos exposure to those individuals, who during the course of exe-cuting Asbestos abatement operations of Building 130 Mace Hall Barracks boiler and boiler room and surrounding area may be exposed to RACM. This action is in alignment with Commandant Instruction M6260.16A, which states, “Unprotected personnel shall not be exposed to airborne asbestos fi-ber concentrations greater than 0.1 fibers per cubic centimeter (0.1 f/cc) av-eraged over an eight-hour day” for occupational exposure levels. In addi-tion, the intent of this project is to comply with the Bay Area Air Quality Management District’s (BAAQMD) Regulation 11, Rule 2, which requires the removal of RACM from a structure prior to demolition beginning.

B. The BAAQMD requires a 10 day prior notification and possible permit fee to be paid for renovations and demolitions projects that contain Asbestos and even Non-Asbestos containing projects.

C. The prevailing winds of TRACEN Petaluma come from the West blowing to the East and are generally stronger in the afternoon. The Contractor SHALL make every effort and precaution to prevent the release of Asbestos Fibers outside of the containment barriers.

D. This document is not intended to be a comprehensive list and does not in-clude all of the requirements incorporated in the regulations listed. Prior to conducting asbestos abatement activities, all personnel associated with the project should review and fully understand the requirements of ALL applica-ble local, state, and federal regulations that may apply to the worksite.

1.2 CODES AND REGULATIONS

A. All work shall conform to the standards set by applicable federal, state, and local laws, regulations, statutes, ordinances, and guidelines in such form in which they exist at the time of the work on the contract and as may be re-quired by subsequent revisions. While the following is not meant to be con-strued as, nor shall the Contractor shall consider it to be, an all inclusive list, this project is at least subject to compliance with the most current issue of the following regulations and publications:

B. U.S. Coast Guard Directives:

1. U. S. Coast Guard, Asbestos Exposure Control Manual, COMDTINST M6260.16 (series)

2. U. S. Coast Guard, Hazardous Waste Management, COMDTINST M16478.1 (series)

3. U. S. Coast Guard, Civil Engineering Manual, COMDTINST M11000.11 (se-ries)

4. U. S. Coast Guard, Asbestos Exposure Control Program, TRACENPETINST M6260.3 (series)

C. U.S. Department of Labor, Occupational Safety and Health Administration

(OSHA):

1. 29 CFR 1910, General Industry Standard

2. 29 CFR 1910.20, Subpart C, General Safety and Health Provisions.

3. 29 CFR 1910.21, Walking/Working Surfaces

4. 29 CFR 1910.28, Safety Requirements for Scaffolding

5. 29 CFR 1910.30, Other Working Surfaces

6. 29 CFR 1910.94, Abrasive Blasting

7. 29 CFR 1910.134, Respiratory Protection

8. 29 CFR 1910.145, Signs and Tags

9. 29 CFR 1910.1025, Occupational Exposure to Lead (General Industry)

10. 29 CFR 1910.1200, Hazard Communication

11. 29 CFR 1926, Construction Industry Standard

12. 29 CFR 1926.20, General Health and Safety Procedures

13. 29 CFR 1926.21, Safety Training

14. 29 CFR 1926.25, Housekeeping

15. 29 CFR 1926.28, Personal Protective Equipment

16. 29 CFR 1926.51, Sanitation

17. 29 CFR 1926.52, Occupational Noise Exposure

18. 29 CFR 1926.55, Gases, Vapors, Fumes, Dusts, and Mists

19. 29 CFR 1926.57, Ventilation

20. 29 CFR 1926.59, Hazard Communication

21. 29 CFR 1926.62, Lead Exposure in Construction

22. 29 CFR 1926.103, Respiratory Protection

23. 29 CFR 1926.200, Accident Prevention Signs and Tags

24. 29 CFR 1926.353, Ventilation and Protection in Welding, Cutting, and Heating

25. 29 CFR 1926.501 – 502, Fall Protection

26. 29 CFR 1926.1101 - Occupational Safety and Health Administration (Construction)

D. U.S. Environmental Protection Agency (EPA):

1. 40 CFR 61 - Subparts A and M: U.S. Environmental Protection Agency Regulations for Asbestos.

2. 40 CFR 204, Noise Abatement Program for Construction Equipment.

3. 40 CFR 260, General Regulations for Hazardous Waste Management

4. 40 CFR 261, Identification and Listing of Hazardous Waste

5. 40 CFR 262, Standards Applicable to Generators of Hazardous Waste

6. 40 CFR 263, Standards Applicable to Transporters of Hazardous Waste

7. 40 CFR 264, Owners and Operators of Hazardous Waste Treatment, Stor-age, and Disposal Facilities

8. 40 CFR 265, Interim Status Standards for Owners and Operators of Haz-ardous Waste 1.3.3.9. Treatment, Storage and Disposal Facilities

9. 40 CFR 268, Land Disposal Restrictions

10. 40 CFR 302, Designation, Reportable Quantities (RQs) and Notification

11. 40 CFR Part 467: National Emission Standards for Asbestos, Asbestos Stripping, Work Practices, and Disposal of Waste.

12. 40 CFR 745, Lead; Requirements for Lead-Based Paint activities in Tar-get Housing and Child Occupied Facilities; Final Rule

13. EPA 560/5-85-024 Guidance for Controlling Asbestos Containing Mate-rials in Buildings.

E. U.S. Department of Transportation (DOT):

1. 49 CFR 172, Hazardous Materials Tables and Hazardous Materials Com-munications Regulations

2. 49 CFR 178, Shipping Container Specification

3. 34 CFR, Part 231 - Appendix C, Procedures for containing and Removing Building Materials Containing Asbestos.

4. American National Standards Institute (ANSI) Publication: Z9.2-79 Fun-damentals Governing the Design and Operation of Local Exhaust Sys-tems.

F. State and Local Regulations:

1. Bay Area Air Quality Management District (BAAQMD)

a. Regulation 11, Hazardous Pollutants, Rule 2 Asbestos Demolition, Renovation and Manufacturing.

b. Regulation 3, Fees, Section 317 and Schedule L.

2. California Code of Regulations, Title 8, Section 1529, Asbestos

3. California Code of Regulations, Title 8, Section 5208, Asbestos

G. NOTE: Contractor should contact all appropriate State and local officials to insure that all asbestos related rules and regulations are being complied with.

1.3 SCOPE OF WORK

A. This project consists of the following distinct Asbestos Removal operations;

1. Remove and dispose of the stack.

B. Upon request, the Abatement Contractor will be furnished a single copy of the lab reports for samples collected within target areas of this project.

1.4 PROTECTION/SECURITY

A. The Contractor shall take all necessary precautions to prevent injury to the public or damage to property of others. For the purpose of this contract, the public or building occupants shall include all persons not employed by the Contractor or a subcontractor working under his/her direction.

B. Storing, positioning or use of equipment, tools, materials, scraps, and trash in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.

C. Work shall not be performed in any area occupied by the public unless spe-cifically permitted by the contract or the COR or EPS and unless adequate steps are taken for the protection of the public.

D. Wherever practicable, the work area shall be fenced, barricaded, or other-wise blocked off from the public to prevent unauthorized entry into the work area.

E. Public Thoroughfare: When work is to be performed over a public thorough-fare such as a sidewalk, lobby, or corridor, the thoroughfare shall be closed, if possible, or other precautions taken such as the installation of screens or barricades. When the exposure to heaving falling objects exists, as during the erection of building walls or during demolition, special protection of the type detailed in 29 CFR 1910/1926 shall be provided.

F. Fences and barricades shall be removed upon completion of the project, in accordance with local ordinance and to the satisfaction of the Construction Project Manager/COR or EPS.

1.5 ASBESTOS ABATEMENT PROCEDURES

A. General: This section includes all work necessary to reduce air concentra-tions of asbestos to the specified level and maintain the specified asbestos control limits during the life of the Contract. It also includes removal, encap-sulation, containment, and disposal of asbestos containing materials.

B. The following Asbestos-Containing Building Materials (ACBM) are to be re-moved.

1. Surfacing materials, Thermal Systems Insulation and Miscellaneous

ACM.

2. “Surfacing Materials” means material in a building that is sprayed on, troweled on or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

3. “Thermal System Insulation” means material in a building which is ap-plied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensa-tion, or for other purposes.

4. “Miscellaneous ACM” means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal insulation.

C. The following asbestos-containing materials are to be encapsulated in ac-cordance with applicable federal, state and local requirements.

1. All surfaces "bared” by the removal of the ACM.

a. Note: Encapsulation is not required on either the poly or “bared” surfaces where floor tile and mastic have been removed.

2. The following materials are to be coated with a “lock-down” mist coat-ing in accordance with applicable federal, state and local requirements.

3. All prepped surfaces and any other “non-bared” surfaces which had not been encapsulated.

4. All poly forming the inside surface of the containments. Note: Lock-down mist is not required on the “splash poly” and “critical barrier poly” after removal of VAT and mastic from floor surfaces.

D. Enclosure requirements, if any will be specified in the individual Asbestos Abatement Projects.

1.6 QUALITY ASSURANCE

A. Contractor Qualifications: The Contractor shall be firm of established reputa-tion (or if newly organized, whose personnel have previously established a reputation in the same field), which is regularly engaged in, and which main-tains a regular force of workmen skilled in asbestos abatement, and shall have performed this work on previous projects. See the “Submittals” para-graph and Appendices “A “and “B” to this Section for additiona1, qualification requirements.

B. New Contractors: Newly formed/organized asbestos abatement CONTRAC- TORS must provide the same amount of documentation as established CON- TRACTORS. They are not exempt from any of the “Appendix A” submittal re-quirements. They too need to demonstrate a proficiency and knowledge based on both experience and training. This is especially true of the Superin-tendent they plan on using for the Project.

C. Independent Test Laboratory Qualifications: Laboratory shall be an inde-pendent test laboratory regularly engaged in asbestos testing, and a current and successful participant in the NIOSH-Proficiency Analytical Testing Pro-gram for Asbestos Air Sample Analysis. Personnel used for monitoring air-borne concentrations of asbestos fibers shall be proficient in this field, be an industrial hygienist who is qualified to be certified by the American Board of Industrial Hygienist or under the direct supervision of a certified industrial hygienist and have three years experience in air monitoring asbestos. The independent test laboratory shall provide IH personnel or recommend a IH/consultant source who are thoroughly trained and experienced in the fol-lowing.

D. “Monitoring” asbestos abatement projects to insure that these specifications, other EPA and OSHA regulations etc., are being complied with and that all aspects of abatement work are being performed in a safe and professional manner: keeping complete and meaningful daily logs, taking and analyzing all required air monitoring samples for the asbestos abatement project (PCM analysis)(Note: All samples will be PCM samples unless otherwise specified), and remaining at the project site full time during the asbestos abatement ac-tivities.

E. As a minimum, IH personnel used must have satisfactorily completed “NIOSH 582-Sampling and Evaluating Airborne Asbestos Dust” course and have “monitored” at least two asbestos abatement projects where the asbes-tos part of the contract exceeded $200,000.

F. Laboratory personnel shall take all air-monitoring samples and analyze them during the period of the asbestos abatement project and not analyze them after the project is done

1.7 ASBESTOS CONTROL LIMITS

A. Inside Asbestos Work Area: Permissible Exposure Limits (i.e., PEL'S) air con-centrations of asbestos shall not exceed an 8-hour time weighted average of

0.1 fibers (longer than 5 micrometers), per cubic centimeter of air and the Short Term Exposure Limit (STEL) shall not exceed 1.0 f/cc (longer than 5 micrometers) for any 30 minute period.

B. Outside Asbestos Work Area: Air concentrations of asbestos shall be main-tained at an 8-our time weighted average less than 0.01 fibers (longer than 5 microns) per cubic centimeter of air. This applies to all areas in the building except for the asbestos work area while in progress and after final clean-up and clearance.

C. In those cases where the outside work area levels are not 0.01 fibers per cubic centimeter those “baseline” values shall become the new control limits for corresponding “during” and "final clearance” levels.

D. Under no circumstances shall the air concentration baseline levels outside the work area increase from their “baseline” levels.

E. Certificates of Compliance: Submit certification that vacuums, ventilation equipment, and other equipment required to contain airborne asbestos fibers conform to ANSI 29.2.

F. Information on Encapsulating Material: Submit written evidence that material meets the latest requirements of the Environmental Protection Agency (EPA) and possesses the specified characteristics.

G. Material Safety Data Sheets (MSDS): Submit a Material Safety Data Sheet (MSDS) on encapsulates or sealants and on solvents proposed to be used to remove VAT mastics.

H. Landfill Location: Contractor should submit the name, address and telephone number of the owner/manager of the approved dumpsite. Contractor shall furnish a copy of transportation company manifest or receipt from dumpsite operation when and where waste was received for each load deposited. The Contractor is also required by EPA to provide the OWNER a copy of the As-bestos Waste Manifest signed by an approved landfill manager not more than 30 calendar days after the asbestos waste has been transported off of the project site

I. Air Monitoring Reports: The air-monitoring records shall be reported by the air-monitor within 2 hours of each samples completion to the individual des-ignated by the Contracting Officer. In the event that the air monitoring re-sults exceed the control limits, the abatement shall be stopped until the nec-essary corrective actions which must be taken have been identified and im-plemented. Regular (daily) written information which should be made availa-ble to the COR or EPS shall include the following for each air sample taken:

1. The specific location of the pump,

2. The time of day and number of minutes, during which the sample was taken,

3. The calibration of the pump in liters per minute,

4. The total volume of air sampled,

5. The 8-hour time weighted average concentration of asbestos fibers per cc of air sampled.

6. Certify that all air-monitoring equipment used was in proper calibration during the project.

J. Asbestos – “Work Area” Sketch: Draw up a neat and legible sketch of each work area and adjacent room. On these sketches show the location of all air samples taken, the number designated to each sample at each location, the location of the decontamination chamber and the negative air machines and their exhausts, and the location of bag out (load out) chambers if used on project. There should be separate sketches for each shift.

K. Daily Log: A copy of the Superintendents and IH’s daily log shall be made available at the end of each asbestos abatement work day at the project.

L. These submittals in the paragraphs above are to be made available to the COR or EPS daily. If there are not Contracting Officer Representatives pre-sent at the end of any particular asbestos work day, this data shall be accu-mulated and given to the representative at the next on site visit. "Copies of the air sampling results should also be provided to the Buildings Manager on a daily basis for “Posting” for building occupant inspection.”

M. Paragraph 1.29.G presents the requirements for the Final Summary Air Moni-toring Reports which are required to be submitted within two calendar weeks after the asbestos abatement portion of the abatement project has been completed.

1.8 CONTRACTOR RESPONSIBILITY

A. Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection for workers, visitors to the “work area” and persons occupying areas adja-cent to the “work area”. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and local regulations, and shall hold the Gov-ernment harmless for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

1.9 DELIVERABLES

A. The Abatement Contractor will provide the COR and EPS with the following information and documentation prior to commencement of on-site work.

1. The original Bay Area Air Quality Management District’s Asbestos Demolition/Renovation Notification From with BAAQMD job number af-fixed to it. Refer to BAAQMD Regulation 11, Rule 2, Section 401, Regu-lation 3, Fees, Section 317 and Schedule L.

2. A copy of each on-site asbestos worker’s certificate of training. Certifi-cate must bear the name of the individual and state that the individual has received training complying to 29 CFR 1926.1101 or 40 CFR 763, Subpart E, Appendix C. Individuals without a certificate of training will not be permitted to enter the regulated area.

3. A current copy of Abatement Contractor’s certification as an asbestos abatement contractor.

4. The Abatement Contractor will provide the COR and EPS with the fol-lowing information and documentation prior to receiving…