NOTICE FOR FILING AGENCY PROTESTS
It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe that a Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum.
In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:
Commandant (CG-9131) U.S. Coast Guard Headquarters
Acquisition Planning and Performance Measurement 1900 Half St. SW, Room 11-0203 Telephone: (202) 372-3695 Fax: (202) 475-3904
SOLICITATION, OFFER, 1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
AND AWARD X SEALED BID (IFB)
(Construction, Alteration, or Repair) HSCG47-12-B-3EFK06 NEGOTIATED (RFP) 03/29/2012 1 of 28 IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
HSCG47-12-B-3EFK06 CONSTRUCTION
7. ISSUED BY CODE : 8. ADDRESS OFFER TO
CONTRACTING DIVISION, USCG CONTRACTING DIVISION, USCG
FACILITIES DESIGN & CONSTRUCTION CENTER (ATLANTIC) FACILITIES DESIGN & CONSTRUCTION CENTER (ATLANTIC)
5505 ROBIN HOOD ROAD, SUITE K 5505 ROBIN HOOD ROAD, SUITE K
NORFOLK, VIRGINIA 23513-2431 NORFOLK, VIRGINIA 23513-2431
9. FOR INFORMATION A. NAME B. TELEPHONE NO. (include area code) (NO COLLECT CALLS)
CALL: VINCE BOWMAN (757) 852-3416 FAX (757) 852-3495
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
ON-BASE PARKING PAVING PAVED AREAS AT U. S. COAST GUARD TRAINING CENTER, CAPE MAY, NJ
Provide all materials and services necessary to perform all work in accordance with applicable clauses, provisions, special contract requirements, specifications and drawings, as set forth in Section A, Page 3.
THIS SOLICITATION IS 100% SET-ASIDE FOR) SMALL BUSINESS CONCERNS.
NAICS CODE: 237310 SIZE STANDARD: $33.5M
CAUTION TO BIDDERS: Bidders are urged to visit the site and take such steps as may be reasonably necessary to ascertain the nature and exact location of the work. Failure to visit the site for this purpose does not relieve bidders from the responsibility for estimating properly the difficulty or cost of successfully performing the work. See Section L (page 26), 52.236-27, Site Visit (Construction) for information regarding organized site visits
PUBLIC BID OPENING TO BE HELD AT USCG FACILITIES DESIGN & CONSTUCTION CENTER, NORFOLK, VA BIDS SHOULD BE SENT TO THE ADDRESS SHOWN IN BLOCKS 7 & 8 ABOVE BY THE DATE AND TIME ESTABLISHED FOR THE BID OPENING VIA HAND DELIVERY, FEDEX, U. S. POSAL SERVICE, UNITED PARCEL
SERVICE, ETC. LATE BIDS WILL NOT BE OPENED OR ACCEPTED.
Note: EMAIL OR FACSIMILE BIDS WILL NOT BE ACCEPTED.
11. The Contractor shall begin performance within 14 calendar days and complete it within 90 calendar days after receiving __X__ award, ______ notice to proceed. This performance period is X mandatory, negotiable. (See SECTION F ) 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? 12B. CALENDAR DAYS (If “Yes”, indicate within how many calendar days after award in Item 12B.)
__X__ YES NO Performance and Payment bonds must be approved prior to commencement of work (See Section L) 10
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Proposals in original and TWO copies to perform the work required are due at the place specified in Item 8 by 2:00 P. M. (hour) local time on MAY 1, 2012. If this is a sealed bid solicitation, offers, will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee __x__ is, _____ is not required.
C. All offers are subjects to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA NSN 7540-01-155-3212 1442-102 FAR (48 CFR) 53.235-1(d)
VWBowman Typewritten Text
OFFER (Must be fully completed by offeror) HSCG47-12-B-3EFK06 PAGE 2 OF 28
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NUMBER: (Must be filled in)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if the offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum re-quirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SECTION B
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20B. SIGNATURE 20C. OFFER DATE (Type or print)
AWARD (To be completed by Government)
21. ITEM ACCEPTED:
CONTRACT COMPLETION DATE:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
(4 COPIES UNLESS OTHERWISE SPECIFIED) 26 10 U.S.C.2304(c) ( ) 41 U.S.C.253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING DIVISION, USCG
FACILITIES DESIGN & CONSTRUCTION CENTER, ATLANTIC SAME AS BLOCK NO. 26
5505 ROBIN HOOD ROAD, SUITE K
NORFOLK, VIRGINIA 23513-2431
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this 29. AWARD (Contractor is not required to sign this document.) Your offer document and return copies to issuing office.) Contractor agrees on this solicitation is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work requirements identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print) TO SIGN (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA 31C. AWARD
DATE
BY
GPO : 1985 O - 469-796 STANDARD FORM 1442 BACK (REV.4-85)
HSCGG47-12-B-3EFK06
SECTION A
SOLICITATION/CONTRACT FORM
TABLE OF CONTENTS
X SECT DESCRIPTION PAGES(S)
PART I – THE SCHEDULE
X A SOLICITATION/CONTRACT FORM 1-3
X B SUPPLIES OR SERVICES AND PRICES/COSTS 4
X C DESCRIPTION/SPECS/WORK STATEMENT 5
X D PACKAGING AND MARKING 6
X E INSPECTION AND ACCEPTANCE 7
X F DELIVERIES OR PERFORMANCE 8
X G CONTRACT ADMINISTRATION DATA 9
X H SPECIAL CONTRACT REQUIREMENTS 10-13
PART II – CONTRACT CLAUSES
X I CONTRACT CLAUSES 14-20
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
X J LIST OF ATTACHMENTS 21
PART IV – REPRESENTATIONS AND INSTRUCTIONS
X K REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
22-25
X L INSTRUCTIONS, CONDITIONS AND NOTICES TO
OFFEROR
26-27
X M EVALUATION FACTORS FOR AWARD 28
The estimated cost of this project ranges between $250,000.00 and $500,000.00.
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
BASE BID ITEM
Provide all services and materials necessary for the repaving of various parking lots located at the U. S.
Coast Guard Training Center (TRACEN) Cape May, NJ. Specification No.2167960 and Drawing No.
2167970, sheets 1 through 11.
Construction Cost $
BASE BID ITEM $
OPTIONAL BID ITEM 0001
Provide all services and materials necessary for the demolition of approximately 200 LF of abandoned steam trench including a abatement of asbestos pipe insulation.
OPTIONAL BID ITEM 1 $
TOTAL BASE BID ITEM AND OPTIONAL BID ITEM 0001
NOTE: The Base Bid and Optional Bid Item shall be deemed to include all costs required for the specified work to be completed in accordance with the drawings and specifications.
The bid will be evaluated based on the total sum of the Base Bid and Optional Bid Item 0001 in accordance with FAR clause 52.217-5 entitled “Evaluation of Options”. Evaluation of the options shall not obligate the Government to exercise the options.
Optional Bid Item No(s) 0001, if exercised by the Government, will be exercised within 60 days after award or at time of award. The contractor will be notified in writing should the Optional Bid Item(s) be exercised. If exercised, the Optional bid Item(s) shall be completed within the established period in accordance with FAR Clause 52.211-10 "Commencement, Prosecution, and Completion of Work (APR 1984)” (See Section "F").
CAUTION: Bids will be analyzed to determine whether they are unbalanced in regards to the bid price for the basic bid item in relationship to the bid price for the options. Unbalanced bids will be rejected as nonresponsive.
SECTION C
DESCRIPTION/SPECIFICATIONS
SECTION "C" IS NOT APPLICABLE. SEE SECTION "J".
SECTION D
PACKAGING AND MARKING
SECTION "D" IS NOT APPLICABLE.
SECTION E
INSPECTION AND ACCEPTANCE
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may--
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
SECTION F
DELIVERIES OR PERFORMANCE
52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
(a) The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date of award, (b) prosecute the work diligently, and (c) complete the entire work ready for use within 90 calendar days. The time stated for completion shall include final cleanup of the premises.
(b) The Government reserves its right to award any or the Optional Bid Item at time of contract award or within 60 calendar days after contract award. The Contractor shall be required to (a) commence work under any or all Optional Bid Items within 14 calendar days after award of Optional Bid Items, (b) prosecute the work diligently, and (c) complete the entire work ready for use within the original contract performance period of 90 calendar days.
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer.
If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
SECTION G
CONTRACT ADMINISTRATION DATA
G.1. INSTRUCTIONS FOR SUBMITTING MATERIAL APPROVALS
Materials, samples, drawings, etc., shall be submitted on "Material Approval Request" form (FDCC LANT REV. 12-98) prior to start of construction unless otherwise noted.
G.2. AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER
Mr. Joe Anzur is the Contracting Officer's Representative for the purpose of day to day technical administration/inspection of all work under the contract. This includes, but is not limited to, administration of progress, approval of submittals, final inspection and providing technical assistance when required.
The contractor is cautioned that in no instance is the above named person authorized to approve any changes which will involve the quantity, quality, price or performance of the contract.
Mr. Thomas Peacock is the representative of the Contracting Officer for the purpose of inspection of work under the contract. The Contractor is cautioned that in no instance is the above named person authorized to approve any changes, which will involve the quantity, quality, price, or performance of the contract.
Mr. Vince Bowman of the Contracting Division, U.S. Coast Guard, Facilities Design & Construction Center (Atlantic), 5505 Robin Hood Road, Suite K, Norfolk, VA 23513-2431, telephone number (757) 852-3416, is the Contracting Officer's Administrator/Negotiator for this contract. All matters related to performance of this contract shall be coordinated through her.
G.3 DESIGNATED BILLING OFFICE
Submit original monthly invoice with any required supporting documentation to the following Contracting Office:
CONTRACTING OFFICER
U. S. COAST GUARD
Facilities Design & Construction Center 5505 Robin Hood Road, Suite K Norfolk, VA 23513
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 52.246-21 WARRANTY OF CONSTRUCTION (APR 1984) ALTERNATE I ( APR 1984)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (j) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of -
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The contractor shall restore any work damaged in fulfilling the terms and conditions of this clause.
The contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall -
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(k) Defects in design or manufacture of equipment specified by the Government on a "brand name and model" basis, shall not be included in this warranty. In this event, the Contractor shall require any subcontractors, manufacturers, or suppliers thereof to execute their warranties, in writing, directly to the Government.
H.2 PRICING OF ADJUSTMENTS
When costs are a factor in any determination of a contract price adjustment pursuant to the Changes Clause or any other provision of this contract, such costs shall be in accordance with the contract cost principles and procedures in Part 31 of the Federal Acquisition Regulations, as applicable, which are in effect on the date of this contract.
H.3 WORK OUTSIDE REGULAR WORK HOURS
If the contractor desires to perform work under this contract outside regular work hours or on Saturdays, Sundays or holidays, he shall apply, in writing, to the Contracting Officer no less than 10 calendar days prior to the planned start of such work. Regular work hours are, for the purpose of this clause, those hours the activity or Command where the work is to be performed normally works on a day-by-day basis.
Application by the Contractor does not imply consent by the Government. Each application will be considered, and a decision made, on the potential benefit of permitting such work. Approval of a Contractor's application under this clause will be, unless otherwise agreed in writing, at no additional cost to the Government.
H.4 SAFETY AND HEALTH
(a) The Contractor shall take all reasonable safety and health measures in performing under this contract and shall, to the extent set forth in the Schedule of the contract, submit a safety plan and a health plan for the Contracting Officer's approval. The Contractor is subject to (i) all applicable Federal, state and local laws, regulations, ordinances, codes and orders relating to safety and health in effect on the date of this contract; and (ii) shall comply with all pertinent provisions of the latest version of the U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of this contract;
and (iii) shall comply with the Safety and Health Standards, specifications and issuances, reporting requirements, and provisions as set forth in the Schedule of the contract.
(b) Further, the Contractor shall take or cause to be taken such other safety and health measures as the Contracting Officer shall direct. To the extent that the Contractor is entitled to an equitable adjustment under the terms and conditions of this contract, or any other obligations of the parties, such equitable adjustment shall be determined pursuant to the procedures of the clause of this contract entitled "Changes"; provided, that no adjustment shall be made under this clause for any change for which an equitable adjustment is expressly provided under any other provision of this contract.
(c) The Contractor shall immediately notify and promptly report to the Contracting Officer or his representative, any accident or incident or exposure resulting in fatality, disabling occupational injury or occupational disease or contamination of property beyond stated acceptable threshold limits set forth in the Schedule of the contract, or property loss of $10,000 or more arising out of work performed under this contract; provided, however, the Contractor will not be required to include in any report an expression of opinion as to the fault or negligence of any employee. In addition, the Contractor shall comply with any illness, incident and injury experience reporting requirement set forth in the Schedule of the contract. The Contractor will investigate all such work related incidents or accidents to persons and property to the extent necessary to positively conclude what cause or causes resulted in said accident or incident, and furnish the Contracting Officer with a report, in such form as the Contracting Officer may require, of the investigative findings, together with proposed and/or completed corrective actions.
(d) (1) The Contracting Officer may, from time to time, notify the Contractor in writing of any noncompliance with the provisions of this clause and may specify corrective actions to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action.
(2) If the Contractor fails or refuses to institute prompt corrective action in accordance with (d)(1) above, the Contracting Officer may invoke the provisions of the clause in the contract entitled "Stop Work", or may invoke whatever other rights are available to the Government under the terms and conditions of this contract or at common law, to remedy such failure or refusal to institute prompt corrective action.
(e) The Contractor (or subcontractor or supplier) shall cause the substance of this clause including this paragraph (e) and any applicable Schedule Provisions, with appropriate changes of designations of the parties to be inserted in subcontracts of every tier which: (i) Amount to $1,000,000 or more unless the Contracting Officer makes a written determination that this is not required; (ii) require construction, repair, or alteration in excess of $10,000; or (iii) the Contractor, regardless of dollar amount, determines that hazardous materials or operations are involved.
(f) The Contractor agrees that authorized Government representatives of the Contracting Officer shall have access to and the right to examine the sites or areas where work under this contract is being performed to determine the adequacy of the Contractor's safety and health measures under this clause.
H.5 WAGE RATES
If crafts or trades are required in the performance of this project for which no wage is listed in the Department of Labor Wage Decision (See Section J), the Contracting Officer shall be notified in writing.
No work in unlisted crafts or trades will be permitted until a wage has been negotiated between the Contracting Officer and the Contractor.
H.6 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT
All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C.
201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws.
H.7 REQUIRED INSURANCE
The contractor shall procure and maintain insurance during the entire period of his performance under this contract, in accordance with Federal Acquisition Regulation Clause No. 52.228-5, entitled “INSURANCE - WORK ON A GOVERNMENT INSTALLATION”. (See Section I) FAR 28.307-2 states the following minimum amounts of liability:
(a) Workers’ Compensation and Employer’s Liability. Contractors are required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General Liability. (1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile Liability. The Contracting Officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contracting Officer shall require aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel Liability. When contract performance involves use of vessels, Contracting Officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.
(f) Prior to commencement of work hereunder, the contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective until thirty (30) days after written notice thereof to the Contracting Officer. The contractor agrees to insert the substance of this clause, including this paragraph, in all subcontracts hereunder.
ATTENTION BIDDERS: IF THIS PROJECT INVOLVES WORK ON NAVIGABLE WATERS,
LONGSHOREMEN’S AND HARBORWORKER’S COMPENSATION ACT (33 U.S.C. 904) IS
APPLICABLE.
H.8 SUBCONTRACTING PLAN
As required by FAR 19.702, the bidder selected for award, if not a small business concern (See Section K), will be required to submit a Subcontracting Plan within 5 calendar days after bid opening.
H.9 52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $419.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the termination clause.
H.10 CONTRACT GOAL FOR SMALL DISADVANTAGED BUSINESSES AND CERTAIN
INSTITUTIONS OF HIGHER EDUCATION
10 U. S. C. 2323, Contract goals for small disadvantaged business and certain institutions of higher education, enacted by Public Law 103-355, requires submission of data on contracts and subcontracts awarded to small disadvantaged businesses, historically black colleges and universities, and minority institutions. The contractor agrees to submit, upon request from the contracting officer, information as may be required by the Government to meet reporting requirements set forth under 10 U. S. C. 2323.
H.11 ENGLISH
All communications, written, and oral between the contractor and the Government in connection with this contract shall be in the English Language, and any system of dimensions (English or Metric) shown shall be consistent with that used in the contract. Communications in other than English will not be accepted.
SECTION I
CONTRACT CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far and http://www.dhs.gov/xlibrary/assets/opnbiz/cpo-acquisition-regulation-0606.pdf and http://www.dhs.gov/xlibrary/assets/opnbiz/cpo-acquisition-manual-1206.pdf
52.202-1 DEFINITIONS (JAN 2012)
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
52.203-6 RESTRICITIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT
(SEP 2006)
52.203-7 ANTI-KICKBACK PROCEDURES (OCT 2010)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (JAN 1997)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
52.204-1 APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of Chief of Contracting Division, Facilities Design and Construction Center (Atlantic) and shall not be binding until so approved.
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
52.204-7 CENTRAL CONTRACTOR REGISTRATION (FEB 2012)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING
WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR
DEBARMENT (DEC 2010)
52.211-6 BRAND NAME OR EQUAL (AUG 1999)
52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING (JAN 1986)
52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD
(JUN 1988)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
52.219.6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2011)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)
52.222-3 CONVICT LABOR (JUNE 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT - OVERTIME
COMPENSATION (JULY 2005)
52.222-6 DAVIS-BACON ACT (JULY 2005)
52.222-7 WITHHOLDING OF FUNDS (FEB 1988)
52.222-8 PAYROLLS AND BASIC RECORDS (JUN 2010)
52.222-9 APPRENTICES AND TRAINEES (JULY 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JULY 2005)
52.222-12 CONTRACT TERMINATION-DEBARMENT (FEB 1988)
52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS
(FEB 1988)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)
52.222-21 PROHIBITION OF SEGREGATED FACILITES (FEB 1999)
52.222-26 EQUAL OPPORTUNITY (MAR 2007)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
(FEB 1999)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (SEPT 2010)
52.222-36 AFFIRMATIVE ACTION WORKERS WITH DISABILITIES (JUN 1998)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (SEPT 2010)
52.222-38 COMPLIANCE WITH VETERANS’ EMPLOYMENT REPORTING REQUIREMENTS
(DEC 2001)
52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
(JAN 1997)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)
52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)
52.223-18 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (
46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows:
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS
(FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act—Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy
American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and
(d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
Alternate I (May 2002). As prescribed in 25.1102(b)(2), substitute the following paragraph (b) for paragraph (b) of the basic provision:
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act shall submit the request with its offer, including the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .