Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPH Drapes.xlsx | XLSX spreadsheet | |
| Combined Synopsis for UPH Curtains.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. DESCRIPTION OF PRODUCTS/SERVICES: Contractor shall deliver and install curtains and drapes for the main lobby area in Bldg. 254 on Coast Guard Training Center Cape May, NJ. The Contractor shall furnish all personnel, equipment, tools, materials, supervision, transportation and all other items and services necessary to accomplish the requirements listed in the statement of work.
2. REQUIRMENTS
2.1 SUPPLIES:
2.1.1 Curtains, blinds and drapes: Supply sheer curtains with off-white to gray color with sizes as specified in the attached spreadsheet. Shades will closely the curtain color.
2.1.2 Valences: Valences will be sized according to the attached spreadsheet. Color will be in a shade of blue with a complimentary pattern.
2.1.3 Hardware: Contractor will supply all hardware as needed for installation.
2.1.4 Color/Pattern Selection: Selection of award will be made based on proposed color and pattern combinations. Contractors are requested to mail samples to the address below. Samples can be returned to the contractor upon request. The mailing address for the Training Center is:
Commanding Officer USCG Training Center 1 Munro Ave Cape May, NJ 08204 Attn: MCPO Trammell
2.2 INSTALLATION: Contractor shall remove existing window treatments and hardware and install new blinds and curtains on appropriate hardware provided by Contractor. Contractor shall repair holes left by existing window treatment removal and repair any damage to previous or new installation. Installation will be carried out within accordance to Manufacturer Standards.
3. DELIVERY:
3.1 Period of Performance: delivery and installation shall be completed within 120 calendar/business days from contract award.
3.2 Delivery and installation shall take place during the scheduled times and dates coordinated with the Governments POC, UPH Manager for building 254, BM2 Louie Morales Kevin, at (609) 898-6220.
4. QUALITY ASSURANCE:
The government POC shall periodically inspect the contractor during the performance period. Any discrepancies discovered shall be reported to the contractor for remedial action. Any remedial action shall be carried out prior to the performance period ending, or earlier depending on the nature of the discrepancy. The government representative shall have the final decision on the acceptance of work carried out, and any remedial action conducted.