USCG 45605 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2018
Developed By: Edward A Wadley
(Rev-0, 09 August 2017)
USCG 45605 (RB-M-45) DRYDOCK AVAILABILITY FY2018
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Fendering System, Inspect WORK ITEM 4: Fender System, Renew WORK ITEM 5: Accessible Spaces, Inspect WORK ITEM 6: Diesel Fuel Tank, Clean and Inspect WORK ITEM 7: Main Diesel Engine(S) To Auragen Generator(S) And Jet Drive(S), Align WORK ITEM 8: Water Jet-Inspect, Perform Service WORK ITEM 9: Jet Drive Anodes, Renew WORK ITEM 10: Sea Strainer, Overhaul WORK ITEM 11: Engine Exhaust Piping, Inspect WORK ITEM 12: MDE SW Valves, Overhaul WORK ITEM 13: Sea Valves, Renew WORK ITEM 14: Diesel Tank(s), Refuel WORK ITEM 15: Water Jet Drive, Preserve WORK ITEM 16: U/W Body, Preserve (100%) WORK ITEM 17: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 18: Interior Hull Insulation, Inspect WORK ITEM 19: Marine Chemist Services, Provide WORK ITEM 20: Drydock WORK ITEM 21: Temporary Services, Provide WORK ITEM 22: Sea Trial Performance, Support, Provide WORK ITEM 23: D – Ring, Remove and Install WORK ITEM 24: Low Level Lights FWD WORK ITEM 25: Flange Flat Washers, Replace WORK ITEM 26: Tow Reel, Anchor Reel - Preserve WORK ITEM 27: Watertight Door and Hatches, Renew WORK ITEM 28: Watertight Door and Hatches, Inspect and Adjust WORK ITEM 29: Lazarette Bilge, Preserve iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 256-002, Rev A, Cooling System Propulsion
Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan
Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A
Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
Coast Guard Drawing 45 RB-M 151-001, Rev -, Pilothouse Structure, Module C
Coast Guard Drawing 45 RB-M 167-003, Rev -, Doors and Hatches
Coast Guard Drawing 45 RB-M 167-003, Rev -, Doors and Hatches
Coast Guard Drawing 45 RB-M 170-001, Rev -, Folding Mast
Coast Guard Drawing 45 RB-M 180-256, Rev A , Foundations Cooling System
Coast Guard Drawing 45 RBM 201-001, Rev -, Main Engine Arrangement
Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion
Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC
Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System
Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic
Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System
Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)
Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes
Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies
Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill And Vent Arrangement
Coast Guard Drawing 45 RBM 311-006, Rev -, APU System
Coast Guard Drawing 45 RB-M 321-200, Rev -, Wire Harness Arrangement
Coast Guard Drawing 45 RB-M 321-201, Rev -, Wire Way Arrangement
Coast Guard Drawing 45 RB-M 330-001, Rev -, Lighting System Arrangement
Coast Guard Drawing 45 RB-M 330-002, Rev -, Lighting System Schematic
Coast Guard Drawing 45 RB-M 512-101, Rev -, Compartment Ventilation
Coast Guard Drawing 45 RB-M 581-001, Rev -, Anchoring Handling and Stowage System
Coast Guard Drawing 45 RB-M 582-002, Rev -, Mooring and Towing System
Coast Guard Drawing 45 RB-M 589-001
Coast Guard Drawing 45 RB-M 601-001, Rev -, General Arrangement
Coast Guard Drawing 45 RB-M 612-001, Rev -, Handrail, Stanchion, and Lifeline Details
Coast Guard Drawing 45 RB-M 631-001, Rev -, Painting Layout
Coast Guard Drawing 45 RB-M 631-001, Rev F, Painting Schedule
Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode
Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering
Coast Guard Drawing 45 RB-M 635-002, Rev -, Insulation Details
COAST GUARD PUBLICATIONS
45 FT Response Boat Medium (RB-M) Operators Handbook COMDTINST M16114.41 March 2012
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat Diagrams for Hotwork
Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick
Catalog
Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex
Strainer - Model RBM-203976
Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0000), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair and Installation
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 0000), 2014, Requirements for Preservation of Ships Structures.
vi (Rev-0)
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
OTHER REFERENCES
45 RB-M Water Jet Disassembly / Assembly Procedures
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM D1330-04(2010) Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-STD-2003A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships and
Submarines
Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007 Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 2 (SSPC-SP 2), 2004, Mechanical Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning vii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
4 N Bow NSN: 2040-01-612-5098
PN: 205063
1 $2031.00
4 N Starboard #2 NSN: 2040-01-612-5114
PN: 207583
1 $1083.65
4 N Starboard Standard #7 (cut to fit from standard fender segment)
NSN: 2040-01-612-5132
PN: 205064
1 $1080.89
4 N Starboard Aft NSN: 2040-01-612-5215
PN: 207579
1 $1614.62
6 N Gasket (Manhole Cover) NSN: 5330-01-134-1986
PN: 3560BN
4 $18.08 ea
7 Y * MDE/ TO GENERATOR
ALIGNMENT TOOL
PN: MMRBM0030 1 ea
7 Y * MDE/ TO JET DRIVE
ALIGNMENT TOOL
PN: MMRBM0451 1 ea
7 Y * ENGINE LIFTING BAR PN: MMRBM0956 1 ea
7 N Flex Couplings NSN: 01-590-3180 2 Ea
8 N Stainless Steel Ball Joint NSN: 3040016152117
PN: 59915K483
10 EA $12.14
8 N Stainless Steel Threaded
Rod
NSN: 5306016152224
PN: 93250A140
1 EA $10.90
8 N Bearing Bushing NSN: 3120014555212
PN: 10106911
4 EA $6.88
8 N Bearing Bushing NSN: 3120580006242
PN: 36M05101
4 EA $68.55
8 N **Socket Head Screw NSN: 5305016171580
PN: 91210050
8 EA $1.98
8 N **Bolt Kit NSN: 2815016171688
PN: 93112085A
2 EA $10.25
8 N **Key NSN: 5315016166360
PN: 10100824
3 EA $21.21
8 N Seal NSN: 5330580006238
PN: 10118902
2EA $4.00
8 N Bushing NSN: 3120580006239
PN: 10105511
2 EA $34.42
8 N Bearing Bushing NSN: 3120014555272
PN: 10105111
4 EA $24.42
8 N **Bolt Kit NSN: 2815016171974
PN: 93112080F
2 EA $4.81
viii (Rev-0)
8 N **Bolt Kit NSN: 5340016167191
PN: 93112065K
12 EA $8.00
8 N Bearing Unit NSN: 3110016166342
PN: 37506201
2 EA $403.50
8 N Bushing NSN: 3120580006240
PN: 10106011
4 EA $37.45
8 N **Set Screw NSN: 5305016020672
PN: 91608012
6EA $1.16
8 N **Bolt Kit NSN: 5305016173161
PN: 93112090K
10EA $9.19
8 N O-ring NSN: 5331580006241
PN: 10202606
6 EA $10.30
8 N **Mechanical Sealing NSN: 4320580006403
PN: 10203870
2 EA $767.45
8 N Bolt Kit NSN: 5306016164058
PN: 93310030E
6 EA $1.41
8 N O-ring NSN: 5331016020679
PN: 10202631
2 EA $5.15
8 N O-ring NSN: 5331016020680
PN: 10202625
4 EA $10.86
8 N Sealing NSN: 5365016233174
PN: 41018801
2 EA $7.31
8 N O-ring NSN: 5331016200368
PN: 10202611
2 EA $4.07
8 N Seal Lip NSN: 4730016204613
PN: 10202590
4 EA $77.25
8 N Sealing NSN: 5330016163186
PN: 45002010
2 EA $7.31
8 N **Lock Nut NSN: 5310016162982
PN: 10202908
2 EA $15.56
8 N Lock Washer NSN: 5310016232756
PN: 10203008
2 EA $4.79
8 N **Ring Nut NSN: 5310016164016
PN: 10202912
2 EA $30.00
8 N Seal NSN: 5330016243735
PN: 10202540R
6 EA $13.56
8 N **Screw NSN: 5305016162955
PN: 93305025
8 EA $0.21
8 N **Washer NSN: 5310016162966
PN: 912505
8 EA $0.14
8 N Gasket NSN: 5330016232867
PN: 37527805
2 EA $49.52
8 N Bushing NSN: 5365016202680
PN: 10108416
8 EA $54.80
8 N **Bolt Kit NSN: 5305016242899
PN: 93110060A
4 EA $8.82
8 N **Bolt Kit NSN: 5305016242922
PN: 99110040G
14 EA $4.61
8 N Bushing NSN: 3120014555268
PN: 10106902
8 EA $5.51
ix (Rev-0)
8 N Gasket NSN: 5330016163014
PN: 10108901
2 EA $2.96
8 N **Bolt Kit NSN: 5305016231019
PN: 93110090A
4 EA $3.72
8 N Lock Washer NSN: 5310016232699
PN: 10203012
2 EA $12.00
8 N O-ring NSN: 5331016242120
PN: 10202603
2 EA $3.00
8 N **Screw, Countersunk NSN: 5305016309734
PN: 99106016
8 EA $3.86
8 N Seal/Gasket NSN: 1040016337691
PN: 45011611
2 EA $23.39
8 N Woodruff Key NSN: 5315016172999
PN: 10100823
2 EA $14.34
8 N Washer, Sealing NSN: 5310016452084
PN: 8755000050
24 EA $0.19
8 N Screw, Connection NSN: 5305016476396
PN: 91212045L
8 EA $5.87
8 N Impeller Housing Bolts NSN: 5305016476396 16 EA
9 N Anode, Inspection Hatch
(Port & Stbd)
NSN: 5342580003759
PN:10108231
2 EA $40.70
9 N Transom Anode NSN: 5342016020658
PN:10108230
4 EA $40.70
9 N Tunnel Anode NSN: 5342016020668
PN:10108220
4 EA $19.00
9 N Impeller
Housing/Bucket/Interceptor
Anode
NSN: 5342226078672
PN:10107701
10 EA $17.63
9 N Guide Vane Chamber
Anode
NSN: 5342016020669
PN:37517411
2 EA $205.28
9 N Anode, Anode Hatch NSN: 5342251465439
PN:10108210
2 EA $23.07
9 N Screw Connection NSN: 5305016022100
PN:93310025H
4 EA $2.57
9 N Screw Connection NSN: 5305016275854
PN:93308025H
14 EA $0.92
9 N Screw Connection NSN:5305016022105
PN:91206020E
8 EA $1.35
9 N Screw Connection NSN: 5340016243271
PN:93308025E
8 EA $0.71
9 N O-ring NSN: 5331016020670
PN:10202639
2 EA $4.95
9 N Screw Connection NSN: 5305016240905
PN:93310016E
8 EA $0.34
9 N Screw Connection NSN: 5306016309800
PN:93312030E
2 EA $6.15
9 N Screw Connection NSN: 5305016204602
PN:91212025E
8 EA $1.41
9 N O-ring NSN: 5331226078691
PN:10202626
2 EA $6.79
x (Rev-0)
9 N Tube Extension NSN: 4730016210708
PN:37610802
2 EA $120.10
9 N Tube Clamp NSN: 4730016200951
PN:10217881
2 EA $16.28
9 N Screw Connection NSN: 5305016022101
PN:93310030H
2 EA $1.60
9 N Connecting Cable NSN: 6145016203663
PN:10234301
4 EA $14.70
9 N Screw Connection NSN: 5305016176732
PN:93306016E
8 EA $0.34
9 N Anode, Corrosion NSN: 5340015899440
PN: 51125
2 EA $47.38
9 N Anode, Corrosion NSN: 5340015899425
PN: 89287
2 EA $ 12.17
11 N Mount, Vibration Isolator PN: RB1-200 4 Ea. 9.40
11 N Mount, Vibration Snubbing
Washer
PN: 148099-16 4 Ea. 1.10
11 N Gasket (Exhaust Flange
Outlet)
NSN: 5330-01-303-5437
PN: 23501147
2 Ea. 7.32
13 N Raw Water Sys De-Icing
Valve, Ball, 1" NPT 316
SS
NSN: 4820-01-600-0385
PN: V210FP-16
2 EA $38.16
13 N AC Supply/Discharge Ball
Valve, Ball 3/4" NPT 316
SS
NSN: 4820-01-600-0389
PN: V210FP-12
3 EA $28.40
13 N AC Overboard Check
Valve High-Flow SS
Check Valve 3/4 NPT
Female
NSN: 4820-01-599-7249
PN: 46635K65
1 EA $63.44
17 N Non Skid 45 FT RBM
Box1
NSN: 2040-01-633-0283 1 1,459.29
17 N Non Skid 45 FT RBM
Box2
NSN: 2040-01-633-0302 1 1,204.69
17 N Non Skid 45 FT RBM
Box4
NSN: 2040-01-633-0323 1 574.42
17 N Non Skid 45 FT RBM
Box5
NSN: 2040-01-633-0330 1 422.55
17 N Non Skid 45 FT RBM
Box8
NSN: 2040-01-633-0713 1 630.19
17 N Non Skid 45 FT RBM -
Round and Square Hatches
- (Not included in main kit)
NSN: 2040-01-633-4911 1 106.09
24 N ***TCTO Kit TD4000.0 NSN: 6220-01-F15-4296 1 Kt.
25 N M12 DIN 125 Stainless
Steel A4 (316) Flat
Washer, Inner Diameter
13mm, Outer Diameter
24mm, Nominal Thickness
2.50mm, UNSPC#:
31161807
MW6420000A40000 96 EA
xi (Rev-0)
25 N M16 DIN 125 Stainless
Steel A4 (316) Flat
Washer, Inner Diameter
17mm, Outer Diameter
30mm Nominal Thickness
3.00mm, UNSPC#:
31161807
MW6460000A40000 32 EA
27 N *Cover, Hatch, Engine
Room, Stbd
NSN: 2040-01-616-5493
PN: P0001309-012-005
1 ea. 17,047.00
27 N *Cover, Hatch, Engine
Room, Port
NSN: 2040-01-616-5440
PN: P0001309-012-003
1 ea. 17,047.00
28 N FWD Void Hatch, Center
Hub
NSN: 01-HS2-7601
PN:9850-2001
1 EA $00.00
28 N Engine Room WTH HUB, Body
NSN: 01-354-0569
PN:0011-2002
1 EA $00.00
28 N Fore Peak (void) WTH
Perimeter Seal
NSN: 01-HS2-7599
PN:9813-2016
1 EA $00.00
28 N Engine Room Center Hatch
Perimeter Seal
NSN: 01-612-9805
PN:9813-2004
1 EA $00.00
28 N Laz Hatch Perimeter Seal NSN: 01-HS2-7599
PN:9813-2016
1 EA $00.00
28 N Aft Pilot House WTD
Perimeter Seal
NSN: 01-HS2-7598
PN:9820-2001
1 EA $00.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Ultrasonic Testing (UT) (100) Shots, Perform
3 Fendering System, Inspect
7 Main Diesel Engine(S) To Auragen Generator(S) And Jet Drive(S), Align
8 Water Jet-Inspect, Perform Service
10 Sea Strainer, Overhaul
15 Water Jet Drive, Preserve
16 U/W Body, Preserve (100%)
25 Flange Flat Washers, Replace xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
45' RB-M
PHYSICAL
Length overall 44 feet, 10.5 inches
Unfixed height 20 feet 9 inches
Beam, maximum 14 feet, 7.75 inches
Full load draft 3 feet, 4 inches
Full load displacement 36,500 pounds
Max sustained speed 42.5 knots
Range 250 nautical miles at 30 knots
Mission limits 8 foot seas / 30 knot winds
Survivability limits 12 foot seas / 50 knot winds
HULL
Hull manufacturer Marinette Marine Corp.
5086 (GRADE) Aluminum
Hin- 2009
MACHINERY
Type 6, cylinder diesel engine
Number of units 2, MTU's 60 series 825 hp
Propulsion type 2, Rolls-royce water-jet
TANKS
1 (Rev-0)
00000_1216_FLT
REC_00000_FLT_Boats @ Commercial Facility (0914)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, 3 (Rev-0) and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy.
3.6.1 Coast Guard turn-over preparation. The Contractor shall be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew shall be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:
3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.
3.6.1.2 The Contractor may commence/continue work during these time frames.
<<APM Note: Paragraph 3.6.1.3 pertains to 47’ MLB only. For all other SBPL assets delete this paragraph.>>
3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.
3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.
3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
4 (Rev-0)
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for
Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel
Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-
STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line
Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE
WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing
Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC
Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
COATING MFG PRODUCT NAME
BATCH
INDUCTION
TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT, ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,
ROLLED)
AVERAGE DFT
11 (Rev-0)
07400_AKP_1114_BOAT_FLT
WORK ITEM 1: General Welding, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide general welding.
TABLE 1 – WELD AREAS
DESCRIPTION LOCATION
Straighten both the port and STBD drop down grate tabs located on the drop down grating. Re-align tabs with upper and lower securing tabs welded to hull and pilot house. Clad welding existing holes on the drop down grate tabs, upper and lower securing tabs welded to hull and pilot house. Re-drill all locking pin holes to allow proper alignment of securing pins.
PORT and STBD drop down grating
Repair cracked base weld on hand rail support. Existing weld cracked in several locations.
Aft, Port side most fwd vertical
Straighten hinged handrail to allow proper alignment with locking pin holes when in the upper position.
Currently misaligned.
STBD AFT
Clad weld limber holes on bulkhead 14, girders L3 port and STBD. Limber holes are currently welded on the
Fwd void side only. Need to complete welds on the Fwd compt side.
FWD SURVIVOR
COMPARTMENT
Both MDE intake air pipe from turbo to aftercooler have cracks on the support bracket welds. Remove both (Port and STBD) intake air support brackets and complete full welds on entire bracket. Repaint brackets and reinstall. 2 brackets total.
ENGINE ROOM
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
12 (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat
Diagrams for Hotwork
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirement. The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on
Coast Guard vessels and equipment in accordance with TP 4934 and SFLC Std Spec 0740.
3.3 Bidding. The Contractor shall ensure for bidding purposes this specification will be broke down by the following:
One linear foot of welding/brazing.
Four square inches of clad/overlay welding.
One hour of fabrication.
One square foot of plate renewal.
13 (Rev-0)
TABLE 1 – PLATE TYPE
ALUMINUM PLATE
THICKNESS WEIGHT
PER SQFT
TYPE/ALLOY
5/32 (.160) 2.212lb
3.4 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
This section is not applicable to this work item.
14 (Rev-0)
10000_RSW_0415_45RBM
WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots at locations designated by the Coast Guard Inspector.
1.2 Government-furnished property.
None
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3 Reporting
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in
15 (Rev-0) the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Ultrasonic thickness measurement. The Contractor shall perform a total of 100 thickness measurements in locations designated by the Coast Guard Inspector utilizing Figure 1 and Figure
2 in accordance with SFLC Std Spec 0740. Record all measurements in Tables 1, 2, and 3.
3.3 Reporting. The Contractor shall submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.
FIGURE 1. BOTTOM SHELL PLATING EXPANDED
16 (Rev-0)
FIGURE 2. STERN SECTION SHELL PLATING
17 (Rev-0)
TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X
100)
LOCATION
AREA
DESIGN
THICKNESS
MAXIMUM
ALLOWABLE
THICKNESS
UT
READINGS
*PERCENT
LOSS
SHELL PLATING PORT SIDE SECTION “A”
2 .250 .187
4 .250 .187
5 .250 .187
8 .250 .187
11 .250 .187
12 .250 .187
13 .250 .187
14 .250 .187
19 .250 .187
20 .250 .187
SHELL PLATING PORT SIDE SECTION “B”
21 .250 .187
22 .250 .187
27 .250 .187
28 .250 .187
29 .250 .187
30 .250 .187
35 .250 .187
36 .250 .187
37 .250 .187
38 .250 .187
SHELL PLATING PORT SIDE SECTION “C”
43 .250 .187
44 .250 .187
45 .250 .187
46 .250 .187
51 .250 .187
52 .250 .187
53 .250 .187
54 .250 .187
59 .250 .187
60 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “C”
41 .250 .187
42 .250 .187
47 .250 .187
48 .250 .187
49 .250 .187
50 .250 .187
55 .250 .187
56 .250 .187
18 (Rev-0)
57 .250 .187
58 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “B”
23 .250 .187
24 .250 .187
25 .250 .187
26 .250 .187
31 .250 .187
32 .250 .187
33 .250 .187
34 .250 .187
39 .250 .187
40 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “A”
1 .250 .187
3 .250 .187
6 .250 .187
7 .250 .187
9 .250 .187
10 .250 .187
15 .250 .187
16 .250 .187
17 .250 .187
18 .250 .187
STERN SECTION “A”
68 .250 .187
69 .250 .187
70 .250 .187
STERN SECTION “B”
64 .250 .187
65 .250 .187
66 .250 .187
67 .250 .187
STERN SECTION “C”
61 .250 .187
62 .250 .187
63 .250 .187
19 (Rev-0)
TABLE 2 - ADDITIONAL U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X
100)
LOCATION
AREA
DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
UT READING *PERCENT LOSS
PORT SIDE AREAS “A, B, C”
1A .250 .187
2A .250 .187
3A .250 .187
4A .250 .187
5A .250 .187
6A .250 .187
7A .250 .187
8A .250 .187
9A .250 .187
10A .250 .187
11A .250 .187
12A .250 .187
STARBOARD SIDE AREAS “A, B, C”
13A .250 .187
14A .250 .187
15A .250 .187
16A .250 .187
17A .250 .187
19A .250 .187
20A .250 .187
21A .250 .187
22A .250 .187
23A .250 .187
24A .250 .187
STERN AREAS “A, B, C”
25A .250 .187
26A .250 .187
27A .250 .187
28A .250 .187
29A .250 .187
30A .250 .187
20 (Rev-0)
TABLE 3 - UNDERWATER HULL BODY MINIMUM THICKNESS TEST RESULTS
REPORT
DATE: ______________________
LOCATIONS MIN. THICKNESS FOUND DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
AT 25%
LOSS
MINIMUM
ALLOWED
THICKNESS
AT 50%
LOSS
(A) (B) (C)
Port Hull: Boot Top to Keel
.250 .187 .125
STBD Hull: Boot
Top to Keel
Stern Hull: Boot
Top to Keel
Comments:
21 (Rev-0)
11020_AKP_1114_45RBM
WORK ITEM 3: Fendering System, Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect the entire fendering system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3 (Reporting)
3.1.2 Tech Rep.
Not applicable.
22 (Rev-0)
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Removal. The Contractor shall remove the entire fendering system by accomplishing the following using the Coast Guard Drawings listed in Section 2 ( References, CG Drawings), SFLC
Std Spec 0000, and SFLC Std Spec 0740.
3.3 Inspection. Clean and visually inspect each section of the rub rail, flat bar, shell plating and coating system in way of the removed fendering sections and mounting hardware. Visually inspect each capture fastener for damage including but not limited to pitting, corrosion, gouging, fading, cracks, deformation, and coating system (if applicable), etc. Submit a CIR.
3.5 Government-furnished property. The Contractor shall be aware that the government reserves the right to provide new fender sections when a benefit to the US Coast Guard can be obtained.
3.6 Installation. The Contractor shall install the fendering system with new contractor furnished nylock nuts and nylon washers.
23 (Rev-0)
11021_RSW_0716_45RBM
WORK ITEM 4: Fender System, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the fender system as listed in Table 1.
TABLE 1- FENDER COMPONENTS
LOCATION QUANTITY
Bow 1
Starboard #2 1
Starboard Standard #7 1
Starboard Aft 1
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QT
Y
ESTIMATED
COST
($/UNIT)
N Bow NSN: 2040-01-612-5098 PN:
205063
1 $2031.00
N Starboard #2 NSN: 2040-01-612-5114 PN:
207583
1 $1083.65
N Starboard Standard #7
(cut to fit from standard fender segment)
NSN: 2040-01-612-5132 PN:
205064
1 $1080.89
N Starboard Aft NSN: 2040-01-612-5215 PN:
207579
1 $1614.62
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
None
24 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Removal. The Contractor shall remove the fender(s) sections listed in Table 1, in accordance with SFLC Std Spec 0000 and Coast Guard Drawing 45 RB-M 114-001.
3.3 Preparation/Preservation. The Contractor shall prepare and preserve the area covered by the removed fender(s) and aluminum faying surfaces (surfaces of similar or dissimilar materials that are fit closely together and fastened) in accordance with Coast Guard Drawing 45 RB-M 114-
001.
3.4 Renewal. The Contractor shall renew the fender sections listed in Table 1 in accordance with the manufacturer’s instructions contained in the repair kit, Coast Guard Drawing 45 RB-M 114-
001 and SFLC Std Spec 0000. The Contractor shall supply and renew all stainless steel 316 nylon insert locking nuts and reuse existing washers in accordance with SFLC Std Spec 0000. The fender(s) in Table 1listed start at the bow and go aft as numbered. The Port Standard #5 and
Starboard Standard #5 are identical to each other and are cut to size for each vessel.