Attachment_I_Schedule_of_Supplies_and_Services_(3).docx

DOCX document 21 KB Posted

Attached to
Fatigue Life Assessment Program (FLAP) to assess remaining life of structures of USCG WMSL
Solicitation number
HSCG40-17-Q-PS2001
Issued by

View the file

Other files

File Type Posted
WMSL_SOW.pdf PDF
Amendment_A0001.pdf PDF
FEAlCombinedSynopsis_(3)_(2).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment II

HSCG40-17-Q-PS2001

SCHEDULE OF SUPPLIES AND SERVICES

CLINs
Description
Unit Price
Qty.
Total

Task One (1)

CLIN 0001

HSM Design

$_______________
1 JB
$_______________

Task One (1)

CLIN 0002

HSM Design, estimated cost of travel – ODC progress reviews. Two (2) trips to Maryland

$_______________
2 Trips
$_______________

Task One (1)

CLIN 0003

HSM Design, estimated cost of travel – ODC Ship check. One (1) trip to California

$_______________
1 Trip
$_______________

Task Two (2)

CLIN 0004

HSM Installation BERTHOLF

$_______________
1 JB
$_______________

Task Two (2)

CLIN 0005

HSM Installation BERTOLF, estimated cost of travel – ODC installation. One (1) trip to California

$_______________
1 Trip
$_______________

Task Three (3)

CLIN 0006

Optional Optional HSM Installations

Up to three (3) optional HSM Installs

$_______________
Per JB
$_______________

Task Three (3)

CLIN 0007

Optional

Optional HSM Installation, estimated cost of travel – ODC Ship check. Three (3) trips to California
$_______________
3 Trips
$_______________

Task Three (3)

CLIN 0008

Optional

Optional HSM Installation, estimated cost of travel- ODC installation. Three (3) trips to California
$_______________
3 Trips
$_______________

Task Four (4)

CLIN 0009

Data Reporting and Maintenance
$_______________
1 JB
$_______________

Task Four (4)

CLIN 0010

Data Reporting and Maintenance, estimated cost of travel – Three (3) trips to California
$_______________
3 Trips
$_______________

TRAVEL:

All travel shall be estimated based on current Federal Per Diem rates, available at http://www.gsa.gov/portal/content/104877, If travel is required during performance of these CLINs, the Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advance purchase. Charges associated with itinerary changes and cancellations under nonrefundable airline tickets are reimbursable as long as the changes are driven by work requirement. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursable. Cost for transportation, lodging, meals, and incidental expenses incurred, shall be reimbursed in accordance with the FTR and FAR 31.205-46. Contractors shall be required to submit all receipts to be reviewed and approved by the Contracting Officer.