Attachment_I_Schedule_of_Supplies_and_Services_(3).docx
DOCX document 21 KB Posted
- Attached to
- Fatigue Life Assessment Program (FLAP) to assess remaining life of structures of USCG WMSL
- Solicitation number
- HSCG40-17-Q-PS2001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WMSL_SOW.pdf | ||
| Amendment_A0001.pdf | ||
| FEAlCombinedSynopsis_(3)_(2).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment II
HSCG40-17-Q-PS2001
SCHEDULE OF SUPPLIES AND SERVICES
| CLINs |
| Description |
| Unit Price |
| Qty. |
| Total |
Task One (1)
CLIN 0001
HSM Design
| $_______________ |
| 1 JB |
| $_______________ |
Task One (1)
CLIN 0002
HSM Design, estimated cost of travel – ODC progress reviews. Two (2) trips to Maryland
| $_______________ |
| 2 Trips |
| $_______________ |
Task One (1)
CLIN 0003
HSM Design, estimated cost of travel – ODC Ship check. One (1) trip to California
| $_______________ |
| 1 Trip |
| $_______________ |
Task Two (2)
CLIN 0004
HSM Installation BERTHOLF
| $_______________ |
| 1 JB |
| $_______________ |
Task Two (2)
CLIN 0005
HSM Installation BERTOLF, estimated cost of travel – ODC installation. One (1) trip to California
| $_______________ |
| 1 Trip |
| $_______________ |
Task Three (3)
CLIN 0006
Optional Optional HSM Installations
Up to three (3) optional HSM Installs
| $_______________ |
| Per JB |
| $_______________ |
Task Three (3)
CLIN 0007
Optional
| Optional HSM Installation, estimated cost of travel – ODC Ship check. Three (3) trips to California |
| $_______________ |
| 3 Trips |
| $_______________ |
Task Three (3)
CLIN 0008
Optional
| Optional HSM Installation, estimated cost of travel- ODC installation. Three (3) trips to California |
| $_______________ |
| 3 Trips |
| $_______________ |
Task Four (4)
CLIN 0009
| Data Reporting and Maintenance |
| $_______________ |
| 1 JB |
| $_______________ |
Task Four (4)
CLIN 0010
| Data Reporting and Maintenance, estimated cost of travel – Three (3) trips to California |
| $_______________ |
| 3 Trips |
| $_______________ |
TRAVEL:
All travel shall be estimated based on current Federal Per Diem rates, available at http://www.gsa.gov/portal/content/104877, If travel is required during performance of these CLINs, the Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advance purchase. Charges associated with itinerary changes and cancellations under nonrefundable airline tickets are reimbursable as long as the changes are driven by work requirement. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursable. Cost for transportation, lodging, meals, and incidental expenses incurred, shall be reimbursed in accordance with the FTR and FAR 31.205-46. Contractors shall be required to submit all receipts to be reviewed and approved by the Contracting Officer.
File details come from the government source that posted it. Updated .