Questions and Answers for P30C33
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P30C33_TPSB_SPECIFICATION_(SAP_10MAY17).docx | DOCX document | |
| Required_Information.doc | DOC document | |
| P30C33_Evaluation_Criteria_32_TPSB.docx | DOCX document | |
| P30C33_TPSB_SPECIFICATION_(SAP_10MAY17).docx | DOCX document | |
| Required_Information.doc | DOC document | |
| P30C33_Evaluation_Criteria_32_TPSB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS TO HSCG40-17-Q-P30C33
QUESTIONS:
1. Is there an ESD located in Portsmouth, VA?
2. “Would these two boats be coming to Portsmouth?”
3. “Would it be possible to get a forecast for all classes of the Coast Guard small boats in and around these locations over the next year?
4. “Is the intent to totally replace the transom assembly or to just reinstall the assembly to OEM specifications. We noticed the transom assembly is not GFE so if a replacement is the intent, we would need to order this.”
5. “Do we just submit one bid price or do we price out for each work item? Also do we submit separate bids for each vessel or do you prefer one price for both?”
6. “Would we need to purchase new transom assemblies for each vessel and install, correct?”
ANSWERS:
1. “We do have an ESD office in Portsmouth, VA.”
2. “We’ll move them to the vendor is awarded.”
3. “The Coast Guard cannot give a company a forecast of any classes of the CG small boats upfront, no matter where the small boats are located. Operational activity is confidential information.”
4. “The vendor is responsible for supplying all materials to complete all the MPC unless listed in the GFE table.”
5. “As for the quote, you will quote one price. The solicitation has one line item with both vessels on this line item. 1 JB @ and your price.”
6. “Yes, two per boat. You would also need to supply all OEM part to complete the items in the MDL.”
ALL QUESTIONS SHALL BE SUBMITTED NO LATER THAN 2PM EST TUESDAY 6/6/2017.
Quotes shall be submitted via email to: Carolyn.ward@uscg.mil NLT 4pm EST on Wed. June 7, 2017.
File details come from the government source that posted it. Updated .