USCG 45688 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2017
Developed By: Joseph D Barratt (Rev-0, 20 December 2016)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viiConsolidated List of Government-furnished Property xiiConsolidated List of Critical Inspection Items xiiiPrincipal Characteristics
1General Requirements
11WORK ITEM 1: General Welding, Provide
13WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
20WORK ITEM 3: Hull Plating (U/W Body), Inspect
23WORK ITEM 4: Fendering System, Inspect
25WORK ITEM 5: Accessible Spaces, Inspect
27WORK ITEM 6: Diesel Fuel Tank, Clean and Inspect
30WORK ITEM 7: Mast, Inspect
32WORK ITEM 8: Main Diesel Engine(S) To Auragen Generator(S) And Jet Drive(S), Align
46WORK ITEM 9: Hydraulic Oil Cooler, Water Jet, Renew
50WORK ITEM 10: Water Jet-Inspect, Perform Service
58WORK ITEM 11: Jet Drive Anodes, Renew
62WORK ITEM 12: Jet Drive Control Cylinders, Renew
64WORK ITEM 13: Sea Strainer, Overhaul
67WORK ITEM 14: Engine Exhaust Piping, Inspect
69WORK ITEM 15: Electrical Isolation, Perform, Meps
78WORK ITEM 16: MDE SW Valves, Overhaul
81WORK ITEM 17: Sea Valves, Renew
85WORK ITEM 18: Diesel Tank(s), Refuel
88WORK ITEM 19: Fender Faying Surfaces, Preserve (100%)
91WORK ITEM 20: Water Jet Drive, Preserve
94WORK ITEM 21: U/W Body, Preserve (100%)
97WORK ITEM 22: Exterior and Interior Non-Skid Pads, Renew
101WORK ITEM 23: Interior Hull Insulation, Inspect
103WORK ITEM 24: Marine Chemist Services, Provide
105WORK ITEM 25: Drydock
109WORK ITEM 26: Temporary Services, Provide
112WORK ITEM 27: Sea Trial Performance, Support, Provide
116WORK ITEM 28: Air Intake Baffle, Mast Step, Handhold, Install
131WORK ITEM 29: Low Level Lights FWD
157WORK ITEM 30: Shurjoint Couplings, Replace
160WORK ITEM 31: Tow Reel, Anchor Reel - Preserve
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan
Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan
Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure
Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A
Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
Coast Guard Drawing 45 RB-M 151-001, Rev -, Pilothouse Structure, Module C
Coast Guard Drawing 45 RB-M 170-001, Rev -, Folding Mast
Coast Guard Drawing 45 RB-M 170-002, Rev -, Folding Mast
Coast Guard Drawing 45 RBM 201-001, Rev -, Main Engine Arrangement
Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement
Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion
Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC
Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System
Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic
Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System
Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System
Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes
Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies
Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement
Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement
Coast Guard Drawing 45 RBM 311-006, Rev -, APU System
Coast Guard Drawing 45 RB-M 321-200, Rev -, Wire Harness Arrangement
Coast Guard Drawing 45 RB-M 321-201, Rev -, Wire Way Arrangement
Coast Guard Drawing 45 RB-M 330-001, Rev -, Lighting System Arrangement
Coast Guard Drawing 45 RB-M 330-002, Rev -, Lighting System Schematic
Coast Guard Drawing 45 RB-M 406-001, Rev -, Grounding and Bonding Schematic
Coast Guard Drawing 45 RB-M 423-001, Rev -, Electronic Navigation System Schematic
Coast Guard Drawing 45 RB-M 439-002, Rev -, C.C.T.V. System
Coast Guard Drawing 45 RB-M 441-001, Rev -, Radio System Schematic
Coast Guard Drawing 45 RB-M 556-003, Rev -, Hydraulic Control System
Coast Guard Drawing 45 RB-M 561-001, Rev -, Steering System
Coast Guard Drawing 45 RB-M 581-001, Rev -, Anchoring Handling and Stowage System
Coast Guard Drawing 45 RB-M 582-002, Rev -, Mooring and Towing System
Coast Guard Drawing 45 RB-M 601-001, Rev -, General Arrangement
Coast Guard Drawing 45 RB-M 631-001, Rev -, Painting Layout
Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode
Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering
Coast Guard Drawing 45 RB-M 635-002, Rev -, Insulation Details
Coast Guard Drawing 45 RBM, 256-002, Rev -, Cooling System Propulsion
COAST GUARD PUBLICATIONS
45 FT Response Boat Medium (RB-M) Operators Handbook COMDTINST M16114.41 March 2012
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 4934, SWBS 074, Dec 2014, Small Boat Diagrams for Hotwork
Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat Diagrams for Hotwork
Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick Catalog
Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer - Model RBM-203976
Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer
Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation
Surface Forces Logistics Center Standard Specification 5000, (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services
OTHER REFERENCES
45 RB-M Water Jet Disassembly / Assembly Procedures
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM D1330-04(2010) Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-STD-2003A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships and Submarines
Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007 Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 6 |
| N |
| Gasket (Manhole Cover) |
| NSN: 5330-01-134-1986 PN: 3560BN |
| 4 |
| $18.08 ea |
| 9 |
| N |
| Hydraulic cooler, Starboard |
| PN: 10112103_5381180 |
| 1 ea. |
| UNK |
| 10 |
| N |
| Stainless Steel Ball Joint |
| NSN: 3040016152117 PN: 59915K483 |
| 10 EA |
| $12.14 |
| 10 |
| N |
| Stainless Steel Threaded Rod |
| NSN: 5306016152224 PN: 93250A140 |
| 1 EA |
| $10.90 |
| 10 |
| N |
| Bearing Bushing |
| NSN: 3120014555212 PN: 10106911 |
| 4 EA |
| $6.88 |
| 10 |
| N |
| Bearing Bushing |
| NSN: 3120580006242 PN: 36M05101 |
| 4 EA |
| $68.55 |
| 10 |
| N |
| **Socket Head Screw |
| NSN: 5305016171580 PN: 91210050 |
| 8 EA |
| $1.98 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 2815016171688 PN: 93112085A |
| 2 EA |
| $10.25 |
| 10 |
| N |
| **Key |
| NSN: 5315016166360 PN: 10100824 |
| 3 EA |
| $21.21 |
| 10 |
| N |
| Seal |
| NSN: 5330580006238 PN: 10118902 |
| 2EA |
| $4.00 |
| 10 |
| N |
| Bushing |
| NSN: 3120580006239 PN: 10105511 |
| 2 EA |
| $34.42 |
| 10 |
| N |
| Bearing Bushing |
| NSN: 3120014555272 PN: 10105111 |
| 4 EA |
| $24.42 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 2815016171974 PN: 93112080F |
| 2 EA |
| $4.81 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 5340016167191 PN: 93112065K |
| 12 EA |
| $8.00 |
| 10 |
| N |
| Bearing Unit |
| NSN: 3110016166342 PN: 37506201 |
| 2 EA |
| $403.50 |
| 10 |
| N |
| Bushing |
| NSN: 3120580006240 PN: 10106011 |
| 4 EA |
| $37.45 |
| 10 |
| N |
| **Set Screw |
| NSN: 5305016020672 PN: 91608012 |
| 6EA |
| $1.16 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 5305016173161 PN: 93112090K |
| 10EA |
| $9.19 |
| 10 |
| N |
| O-ring |
| NSN: 5331580006241 PN: 10202606 |
| 6 EA |
| $10.30 |
| 10 |
| N |
| **Mechanical Sealing |
| NSN: 4320580006403 PN: 10203870 |
| 2 EA |
| $767.45 |
| 10 |
| N |
| Bolt Kit |
| NSN: 5306016164058 PN: 93310030E |
| 6 EA |
| $1.41 |
| 10 |
| N |
| O-ring |
| NSN: 5331016020679 PN: 10202631 |
| 2 EA |
| $5.15 |
| 10 |
| N |
| O-ring |
| NSN: 5331016020680 PN: 10202625 |
| 4 EA |
| $10.86 |
| 10 |
| N |
| Sealing |
| NSN: 5365016233174 PN: 41018801 |
| 2 EA |
| $7.31 |
| 10 |
| N |
| O-ring |
| NSN: 5331016200368 PN: 10202611 |
| 2 EA |
| $4.07 |
| 10 |
| N |
| Seal Lip |
| NSN: 4730016204613 PN: 10202590 |
| 4 EA |
| $77.25 |
| 10 |
| N |
| Sealing |
| NSN: 5330016163186 PN: 45002010 |
| 2 EA |
| $7.31 |
| 10 |
| N |
| **Lock Nut |
| NSN: 5310016162982 PN: 10202908 |
| 2 EA |
| $15.56 |
| 10 |
| N |
| Lock Washer |
| NSN: 5310016232756 PN: 10203008 |
| 2 EA |
| $4.79 |
| 10 |
| N |
| **Ring Nut |
| NSN: 5310016164016 PN: 10202912 |
| 2 EA |
| $30.00 |
| 10 |
| N |
| Seal |
| NSN: 5330016243735 PN: 10202540R |
| 6 EA |
| $13.56 |
| 10 |
| N |
| **Screw |
| NSN: 5305016162955 PN: 93305025 |
| 8 EA |
| $0.21 |
| 10 |
| N |
| **Washer |
| NSN: 5310016162966 PN: 912505 |
| 8 EA |
| $0.14 |
| 10 |
| N |
| Gasket |
| NSN: 5330016232867 PN: 37527805 |
| 2 EA |
| $49.52 |
| 10 |
| N |
| Bushing |
| NSN: 5365016202680 PN: 10108416 |
| 8 EA |
| $54.80 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 5305016242899 PN; 93110060A |
| 4 EA |
| $8.82 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 5305016242922 PN: 99110040G |
| 14 EA |
| $4.61 |
| 10 |
| N |
| Bushing |
| NSN: 3120014555268 PN: 10106902 |
| 8 EA |
| $5.51 |
| 10 |
| N |
| Gasket |
| NSN: 5330016163014 PN: 10108901 |
| 2 EA |
| $2.96 |
| 10 |
| N |
| **Bolt Kit |
| NSN: 5305016231019 PN: 93110090A |
| 4 EA |
| $3.72 |
| 10 |
| N |
| Lock Washer |
| NSN: 5310016232699 PN: 10203012 |
| 2 EA |
| $12.00 |
| 10 |
| N |
| O-ring |
| NSN: 5331016242120 PN: 10202603 |
| 2 EA |
| $3.00 |
| 10 |
| N |
| **Screw, Countersunk |
| NSN: 5305016309734 PN: 99106016 |
| 8 EA |
| $3.86 |
| 10 |
| N |
| Seal/Gasket |
| NSN: 1040016337691 PN: 45011611 |
| 2 EA |
| $23.39 |
| 10 |
| N |
| Woodruff Key |
| NSN: 5315016172999 PN: 10100823 |
| 2 EA |
| $14.34 |
| 10 |
| N |
| Washer, Sealing |
| NSN: 5310016212063 PN: 8775000050 |
| 24 EA |
| $0.19 |
| 10 |
| N |
| Screw, Connection |
| NSN: 5305016476396 PN: 91212045L |
| 8 EA |
| $5.87 |
| 11 |
| N |
| Anode, Inspection Hatch (Port & Stbd) |
| NSN: 5342580003759 PN:10108231 |
| 2 EA |
| $40.70 |
| 11 |
| N |
| Transom Anode |
| NSN: 5342016020658 PN:10108230 |
| 4 EA |
| $40.70 |
| 11 |
| N |
| Tunnel Anode |
| NSN: 5342016020668 PN:10108220 |
| 4 EA |
| $19.00 |
| 11 |
| N |
| Impeller Housing/Bucket/Interceptor Anode |
| NSN: 5342226078672 PN:10107701 |
| 10 EA |
| $17.63 |
| 11 |
| N |
| Guide Vane Chamber Anode |
| NSN: 5342016020669 PN:37517411 |
| 2 EA |
| $205.28 |
| 11 |
| N |
| Anode, Anode Hatch |
| NSN: 5342251465439 PN:10108210 |
| 2 EA |
| $23.07 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016022100 PN:93310025H |
| 4 EA |
| $2.57 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016275854 PN:93308025H |
| 14 EA |
| $0.92 |
| 11 |
| N |
| Screw Connection |
| NSN:5305016022105 PN:91206020E |
| 8 EA |
| $1.35 |
| 11 |
| N |
| Screw Connection |
| NSN: 5340016243271 PN:93308025E |
| 8 EA |
| $0.71 |
| 11 |
| N |
| O-ring |
| NSN: 5331016020670 PN:10202639 |
| 2 EA |
| $4.95 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016240905 PN:93310016E |
| 8 EA |
| $0.34 |
| 11 |
| N |
| Screw Connection |
| NSN: 5306016309800 PN:93312030E |
| 2 EA |
| $6.15 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016204602 PN:91212025E |
| 8 EA |
| $1.41 |
| 11 |
| N |
| O-ring |
| NSN: 5331226078691 PN:10202626 |
| 2 EA |
| $6.79 |
| 11 |
| N |
| Tube Extension |
| NSN: 4730016210708 PN:37610802 |
| 2 EA |
| $120.10 |
| 11 |
| N |
| Tube Clamp |
| NSN: 4730016200951 PN:10217881 |
| 2 EA |
| $16.28 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016022101 PN:93310030H |
| 2 EA |
| $1.60 |
| 11 |
| N |
| Connecting Cable |
| NSN: 6145016203663 PN:10234301 |
| 4 EA |
| $14.70 |
| 11 |
| N |
| Screw Connection |
| NSN: 5305016176732 PN:93306016E |
| 8 EA |
| $0.34 |
| 11 |
| N |
| Anode, Corrosion |
| NSN: 5340015899440 PN: 51125 |
| 2 EA |
| $47.38 |
| 11 |
| N |
| Anode, Corrosion |
| NSN: 5340015899425 PN: 89287 |
| 2 EA |
| $ 12.17 |
| 12 |
| N |
| Interceptor Cylinder |
| NSN: 2010015904296 PN: 101 210 38 |
| 2 EA |
| 12 |
| N |
| Seal |
| NSN: 5330016163014 PN: 101 189 01 |
| 2 EA |
| 12 |
| N |
| Reversing Bucket Cylinder |
| NSN: 2010015904260 PN: 101 210 80 |
| 2 EA |
| 12 |
| N |
| Steering Cylinder |
| NSN: 2030016255540 PN: 10121063 |
| 1 EA |
| 14 |
| N |
| Mount, Vibration Isolator |
| PN: RB1-200 |
| 4 Ea. |
| 9.40 |
| 14 |
| N |
| Mount, Vibration Snubbing Washer |
| PN: 148099-16 |
| 4 Ea. |
| 1.10 |
| 14 |
| N |
| Gasket (Exhaust Flange Outlet) |
| NSN: 5330-01-303-5437 PN: 23501147 |
| 2 Ea. |
| 7.32 |
| 17 |
| N |
| Raw Water Sys De-Icing Valve, Ball, 1" NPT 316 SS |
| NSN: 4820-01-600-0385 PN: V210FP-16 |
| 2 EA |
| $38.16 |
| 17 |
| N |
| AC Supply/Discharge Ball Valve, Ball 3/4" NPT 316 SS |
| NSN: 4820-01-600-0389 PN: V210FP-12 |
| 3 EA |
| $28.40 |
| 17 |
| N |
| AC Overboard Check Valve High-Flow SS Check Valve 3/4 NPT Female |
| NSN: 4820-01-599-7249 PN: 46635K65 |
| 1 EA |
| $63.44 |
| 22 |
| N |
| Non Skid 45 FT RBM Whole Kit Contents of kit include box 1 through box 8. (Round and square hatches not included) |
| NSN: 7220-01-615-5012 |
| 1 |
| 5,186.71 |
| 22 |
| N |
| Non Skid 45 FT RBM Box1 |
| NSN: 2040-01-633-0283 |
| 1 |
| 1,459.29 |
| 22 |
| N |
| Non Skid 45 FT RBM Box2 |
| NSN: 2040-01-633-0302 |
| 1 |
| 1,204.69 |
| 22 |
| N |
| Non Skid 45 FT RBM Box3 |
| NSN: 7220-01-631-9708 |
| 1 |
| 228.69 |
| 22 |
| N |
| Non Skid 45 FT RBM Box4 |
| NSN: 2040-01-633-0323 |
| 1 |
| 574.42 |
| 22 |
| N |
| Non Skid 45 FT RBM Box5 |
| NSN: 2040-01-633-0330 |
| 1 |
| 422.55 |
| 22 |
| N |
| Non Skid 45 FT RBM Box6 |
| NSN: 2040-01-633-0375 |
| 1 |
| 166.20 |
| 22 |
| N |
| Non Skid 45 FT RBM Box7 |
| NSN: 2040-01-633-0344 |
| 1 |
| 478.00 |
| 22 |
| N |
| Non Skid 45 FT RBM Box8 |
| NSN: 2040-01-633-0713 |
| 1 |
| 630.19 |
| 22 |
| N |
| Non Skid 45 FT RBM - Round and Square Hatches - (Not included in main kit) |
| NSN: 2040-01-633-4911 |
| 1 |
| 106.09 |
| 28 |
| N |
| TCTO KIT |
| NSN: 2940-01-HS2-6782 |
| 1 ea |
| UNK |
| 29 |
| N |
| ***TCTO Kit TD4000.0 |
| NSN: 6220-01-HS2-6783 |
| 1 Kt. |
| 30 |
| N |
| Coupling |
| PN: SS-5 |
| 4 ea. |
| UNK |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 2 |
| Ultrasonic Testing (UT) (100) Shots, Perform |
| 4 |
| Fendering System, Inspect |
| 8 |
| Main Diesel Engine(S) To Auragen Generator(S) And Jet Drive(S), Align |
| 10 |
| Water Jet-Inspect, Perform Service |
| 13 |
| Sea Strainer, Overhaul |
| 19 |
| Fender Faying Surfaces, Preserve (100%) |
| 20 |
| Water Jet Drive, Preserve |
| 21 |
| U/W Body, Preserve (100%) |
Principal Characteristics 45' rb-m
Physical
| Length overall |
| 44 feet, 10.5 inches |
| Unfixed height |
| 20 feet 9 inches |
| Beam, maximum |
| 14 feet, 7.75 inches |
| Full load draft |
| 3 feet, 4 inches |
| Full load displacement |
| 36,500 pounds |
| Max sustained speed |
| 42.5 knots |
| Range |
| 250 nautical miles at 30 knots |
| Mission limits |
| 8 foot seas / 30 knot winds |
| Survivability limits |
| 12 foot seas / 50 knot winds |
HULL
| Hull manufacturer |
| Marinette Marine Corp. |
| 5086 |
| (GRADE) Aluminum |
| Hin- |
| 2009 |
Machinery
| Type |
| 6, cylinder diesel engine |
| Number of units |
| 2, MTU's 60 series 825 hp |
| Propulsion type |
| 2, Rolls-royce water-jet |
tANKS
00000_0316_FLT
REC_00000_FLT_Boats @ Commercial Facility (0914)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy.
3.6.1 Coast Guard turn-over preparation. The Contractor shall be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew shall be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:
3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.
3.6.1.2 The Contractor may commence/continue work during these time frames.
<<APM Note: Paragraph 3.6.1.3 pertains to 47’ MLB only. For all other SBPL assets delete this paragraph.>>
3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.
3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.
3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
07400_AKP_1114_BOAT_FLT
WORK ITEM 1: General Welding, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide general welding.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat Diagrams for Hotwork
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirement. The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with TP 4934 and SFLC Std Spec 0740.
3.3 Bidding. The Contractor shall ensure for bidding purposes this specification will be broke down by the following:
· Engine Room: BHD1, stbd aft corner, 1 sq in clad welding
· Engine Room: BHD 1, port aft corner, 3 sq in clad welding
· Aux Machinery Space: bilge, port & stbd outboard fuel tanks, 1 sq ft total
· Aux Machinery Space: BHD 7, port side behind bilge pump, 24 sq in crop & renew
· Aux machinery Space: BHD 7, stbd side behind bilge pump, 7 sq in clad welding
· Aux Machinery Space: BHD 7, port side bilge (behind bilge pump), 6 sq in crop & renew
· Aux Machinery Space: FR 9, port side bilge, 30 sq in crop & renew
· Aux Machinery Space: between BHD 7 & FR 8 on fuel tank (port side), 10 sq in clad welding
· Aux machinery Space: FR 8 on fuel tank (port side), 1 sq in clad welding
· Main Deck: port recess grating mounting tabs, plug welding and bore holes to correct size
· Main deck: stbd recess grating aft mount tab, crop & renew tab and bore new hole.
· Hull: stbd side performance fin, crop & renew 2 ft section
· Jet drive: Port & stbd steering nozzle center support bar, 5 sq in clad welding
3.4 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
This section is not applicable to this work item.
10000_RSW_0415_45RBM
WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots at locations designated by the Coast Guard Inspector.
1.2 Government-furnished property.
None
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.3 Reporting
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Ultrasonic thickness measurement. The Contractor shall perform a total of 100 thickness measurements in locations designated by the Coast Guard Inspector utilizing Figure 1 and Figure 2 in accordance with SFLC Std Spec 0740. Record all measurements in Tables 1, 2, and 3.
3.3 Reporting. The Contractor shall submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.
4. NOTES
This section is not applicable to this work item.
Figure 1. Bottom Shell Plating Expanded
Figure 2. Stern Section Shell Plating
Table 1 - Standard U/W Body Test Results Report Date: ____________________________ *Calculating Percent Loss = 100- (UT Reading / Design Thickness x 100)
| Location Area |
| Design Thickness |
| Maximum |
Allowable Thickness
| UT Readings |
| *Percent Loss |
Shell Plating Port Side Section “A”
| 2 |
| .250 |
| .187 |
| 4 |
| .250 |
| .187 |
| 5 |
| .250 |
| .187 |
| 8 |
| .250 |
| .187 |
| 11 |
| .250 |
| .187 |
| 12 |
| .250 |
| .187 |
| 13 |
| .250 |
| .187 |
| 14 |
| .250 |
| .187 |
| 19 |
| .250 |
| .187 |
| 20 |
| .250 |
| .187 |
Shell Plating Port Side Section “B”
| 21 |
| .250 |
| .187 |
| 22 |
| .250 |
| .187 |
| 27 |
| .250 |
| .187 |
| 28 |
| .250 |
| .187 |
| 29 |
| .250 |
| .187 |
| 30 |
| .250 |
| .187 |
| 35 |
| .250 |
| .187 |
| 36 |
| .250 |
| .187 |
| 37 |
| .250 |
| .187 |
| 38 |
| .250 |
| .187 |
Shell Plating Port Side Section “C”
| 43 |
| .250 |
| .187 |
| 44 |
| .250 |
| .187 |
| 45 |
| .250 |
| .187 |
| 46 |
| .250 |
| .187 |
| 51 |
| .250 |
| .187 |
| 52 |
| .250 |
| .187 |
| 53 |
| .250 |
| .187 |
| 54 |
| .250 |
| .187 |
| 59 |
| .250 |
| .187 |
| 60 |
| .250 |
| .187 |
Shell Plating Starboard Side Section “C”
| 41 |
| .250 |
| .187 |
| 42 |
| .250 |
| .187 |
| 47 |
| .250 |
| .187 |
| 48 |
| .250 |
| .187 |
| 49 |
| .250 |
| .187 |
| 50 |
| .250 |
| .187 |
| 55 |
| .250 |
| .187 |
| 56 |
| .250 |
| .187 |
| 57 |
| .250 |
| .187 |
| 58 |
| .250 |
| .187 |
Shell Plating Starboard Side Section “B”
| 23 |
| .250 |
| .187 |
| 24 |
| .250 |
| .187 |
| 25 |
| .250 |
| .187 |
| 26 |
| .250 |
| .187 |
| 31 |
| .250 |
| .187 |
| 32 |
| .250 |
| .187 |
| 33 |
| .250 |
| .187 |
| 34 |
| .250 |
| .187 |
| 39 |
| .250 |
| .187 |
| 40 |
| .250 |
| .187 |
Shell Plating Starboard Side Section “A”
| 1 |
| .250 |
| .187 |
| 3 |
| .250 |
| .187 |
| 6 |
| .250 |
| .187 |
| 7 |
| .250 |
| .187 |
| 9 |
| .250 |
| .187 |
| 10 |
| .250 |
| .187 |
| 15 |
| .250 |
| .187 |
| 16 |
| .250 |
| .187 |
| 17 |
| .250 |
| .187 |
| 18 |
| .250 |
| .187 |
Stern Section “A”
| 68 |
| .250 |
| .187 |
| 69 |
| .250 |
| .187 |
| 70 |
| .250 |
| .187 |
Stern Section “B”
| 64 |
| .250 |
| .187 |
| 65 |
| .250 |
| .187 |
| 66 |
| .250 |
| .187 |
| 67 |
| .250 |
| .187 |
Stern Section “C”
| 61 |
| .250 |
| .187 |
| 62 |
| .250 |
| .187 |
| 63 |
| .250 |
| .187 |
Table 2 - Additional U/W Body Test Results Report Date: ____________________________ *Calculating Percent Loss = 100- (UT Reading / Design Thickness x 100)
| Location Area |
| Design Thickness |
| Minimum Allowed Thickness |
| UT Reading |
| *Percent Loss |
Port Side Areas “A, B, C”
| 1A |
| .250 |
| .187 |
| 2A |
| .250 |
| .187 |
| 3A |
| .250 |
| .187 |
| 4A |
| .250 |
| .187 |
| 5A |
| .250 |
| .187 |
| 6A |
| .250 |
| .187 |
| 7A |
| .250 |
| .187 |
| 8A |
| .250 |
| .187 |
| 9A |
| .250 |
| .187 |
| 10A |
| .250 |
| .187 |
| 11A |
| .250 |
| .187 |
| 12A |
| .250 |
| .187 |
Starboard Side Areas “A, B, C”
| 13A |
| .250 |
| .187 |
| 14A |
| .250 |
| .187 |
| 15A |
| .250 |
| .187 |
| 16A |
| .250 |
| .187 |
| 17A |
| .250 |
| .187 |
| 19A |
| .250 |
| .187 |
| 20A |
| .250 |
| .187 |
| 21A |
| .250 |
| .187 |
| 22A |
| .250 |
| .187 |
| 23A |
| .250 |
| .187 |
| 24A |
| .250 |
| .187 |
Stern Areas “A, B, C”
| 25A |
| .250 |
| .187 |
| 26A |
| .250 |
| .187 |
| 27A |
| .250 |
| .187 |
| 28A |
| .250 |
| .187 |
| 29A |
| .250 |
| .187 |
| 30A |
| .250 |
| .187 |
Table 3 - Underwater Hull Body Minimum Thickness Test Results Report Date: ______________________
| Locations |
| Min. Thickness Found |
| Design Thickness |
| Minimum allowed thickness at 25% Loss |
| Minimum Allowed Thickness at 50% Loss |
| (A) |
| (B) |
| (C) |
Port Hull: Boot Top to Keel
| .250 |
| .187 |
| .125 |
STBD Hull: Boot Top to Keel
| .250 |
| .187 |
| .125 |
Stern Hull: Boot Top to Keel
| .250 |
| .187 |
| .125 |
Comments:
11000_AKP_1114_45RBM
WORK ITEM 3: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan
Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure
Coast Guard Drawing 45 RB-M 631-001, Rev -, Painting Layout
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
· A hull repair supervisor and a marker.
· Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.
3.2.1 Hull plating.
3.2.1.1 The Contractor shall inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.
3.2.3 Water jet drive. The Contractor shall inspect the water jet drive assembly for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks. Inspect all linkages for any missing fasteners, physical damage, pitting, or other conditions effecting usage.
3.2.4 Transducers. The Contractor shall check general condition of the transducers for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.
3.2.6 Zinc anodes.
3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, welds, water jet drives, and sea chest anodes, as applicable, using a light-wire brush.
3.1.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.
3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB). Document the condition found as “Partial - Condition A”, “Partial - Condition B”, “Partial Condition C”, or “100%”, as applicable (see 4.1 (Definitions)). Submit a CFR.
NOTE
The following inspections are for determining the existing condition of the coating system for the underwater body surfaces, which are deemed “Critical-coated” surfaces; they must be carried out by a SSPC-QP-1 certified contractor/sub-Contractor or a NACE Inspector – see SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.2.7.1 Visual. Perform a visual inspection of the existing U/W body coating system.
3.2.7.2 Dry film thickness(DFT) measurements. Take total DFT measurements of the U/W body coating system, in accordance with SSPC-PA 2. Ensure that film thickness measurement is taken with a suitable eddy current gauge, for non-ferrous metal substrate.
4. NOTES
4.1 Definitions.
4.1.1 "Partial – Condition A”: The condition that exists where the substrate is exposed in up to 33% of the entire U/W body.
4.1.2 "Partial - Condition B": The condition that exists where the anticorrosive (AC) undercoating system has incurred damage, but, the u/w body hull substrate is not exposed in any location.
4.1.3 "Partial - Condition C”: The condition that exists where damage is confined to the antifoulant (AF) topcoat; the epoxy undercoating system is not exposed in any location.
4.1.4 "100%”: The condition that exists where more than 33% of the U/W body hull substrate is exposed.
4.2 UWHIB convention. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
11020_AKP_1114_45RBM
WORK ITEM 4: Fendering System, Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect the entire fendering system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B
Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec…