14. (cont’d)
Question 1: Work item 1 General Welding has come into the spec again without a corresponding line on the pricing sheet. Ea. item in 3.3 will require a difference price quote. Can you please advise how to respond?
Answer: Work Item 1 General Welding has been revised. Specification( Rev-1), 14 December is attached.
Question 2: WI-23 Compartment Insulation: there are two para 3.2. listed. I presume the first to be correct. Only the 8sqft to be removed/renewed. Can you confirm which 3.2 is applicable?
Answer: Work Item 23 Compartment Insulation has been revised. Specification( Rev-1), 14 December is attached.
Question 3: WI-28 Shurjoint Couplings, replace: 1.2 GFE. Can you advise where [12] couplings are to be replaced? Previous two availability only stated four (4) to be replaced, as only four are required.
Answer: There are 2 Duplex Strainers in the RBM's. Each strainer have 6 couplings.
(See picture attached)
All other terms and conditions remain unchanged.
(END OF AMENDMENT NUMBER A00001)