Enclosure II Schedule of Supplies and Services

View the file

Other files

File Type Posted
Amend.A0001.HSCG4017Q61054.doc DOC document
Enclosure_I_FRC_HSM_SOW_Rev_8-9-17.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure II

HSCG40-17-Q-61054

SCHEDULE OF SUPPLIES AND SERVICES

CLINs
Description
Unit Price
Qty.
Total

Task One (1)

CLIN 0001

Task One -Develop draft FRC HSM System Concept Design drawings and Specifications

*NSP
1 JB
*NSP_

Task One (1) CLIN 0001a

Task One – Final concept FRC HSM Design Drawings and Specifications
$ ______________
1 JB
$ _______________

Task One (1) CLIN 0001b

Estimated cost of travel – ODC final concept FRC HSM Design, One (1) trip to Baltimore, MD to present the system design.
$_______________
1 Trip
$_______________

Task Two (2)

CLIN 0002

Draft HSM System Detail Design Drawings and Specifications
$_______________
1 JB
$_______________

Task Two (2) CLIN 0002a Final HSM System Detail Design Drawings and Specifications.

$NSP
1 JB
*NSP

Task Two (2) CLIN 0002b

Estimated cost of travel – ODC final HSM System Detail Design One (1) trip to Baltimore, MD to present the system design.
$_______________
1 Trip
$_______________

Task Three (3)

CLIN 0003

Construct and Install Prototype FRC HSM System and Delivery Documents
$_______________
1 JB
$_______________

Task Three (3) CLIN 0003a

Estimated cost of travel – ODC Install HSM System. One (1) trip to Key West, FL
$_______________
1 Trip
$_______________

Task Four (4)

CLIN 0004

Construct and install Four (4) FRC HSM Production Systems
$_______________
1 JB
$_______________

Task Four (4) CLIN 0004a

Initial data analysis and system acceptance for each system installed as part of Q.A. process
*NSP
1 JB
*NSP_

Task Four (4) CLIN 0004b Estimated cost of travel – ODC to install Four (4) FRC HSM Systems. Four (4) trips to Key West, FL and (4) data collection & statistical analysis trips

8 Trips

TRAVEL:

All travel shall be estimated based on current Federal Per Diem rates, available at http://www.gsa.gov/portal/content/104877, If travel is required during performance of these CLINs, the Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advance purchase. Charges associated with itinerary changes and cancellations under nonrefundable airline tickets are reimbursable as long as the changes are driven by work requirement. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursable. Cost for transportation, lodging, meals, and incidental expenses incurred, shall be reimbursed in accordance with the FTR and FAR 31.205-46. Contractors shall be required to submit all receipts to be reviewed and approved by the Contracting Officer.