17Q53001.docx

DOCX document 212 KB Posted

Attached to
Inspection and Re-Certification of Mobile Boat Hoists
Solicitation number
HSCG40-17-Q-53001
Issued by

About this file

Solicitation Package

View the file

Other files

File Type Posted
CG_District_Map_2.docx DOCX document
SF1449-12a2.pdf PDF
17Q53001.docx DOCX document
Boat_Hoist_Equipment_List_1.xlsx XLSX spreadsheet
Unit_Poc_and_Addresses_Oct_2016.xlsx XLSX spreadsheet
FINAL_SPEC_OCT_11.pdf PDF
FINAL_SPEC_OCT_11.pdf PDF
SF1449-12a2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG40-17-Q-53001

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

BACKGROUND

The purpose of this contract is to procure inspection and re-certification services for a variety of Mobile Boat Hoists supported by the Surface Forces Logistics Center Small Boat Product Line.

TYPE OF CONTRACT

This is a commercial fixed-price Requirements contract consisting of one (1) 12-month base period and four (4) 12-month option periods. A Requirements contract is defined in Federal Acquisition Regulation (FAR) Claude 52.216-21, Requirements.

ORDERING

a. All services shall be ordered by issuance of individual task orders. Refer to FAR Clause 52.216-18, Ordering.

b. All orders shall be placed by the U.S. Coast Guard, Surface Forces Logistics Center, Contract and Procurement Branch 3, Small Boat Product Line.

c. Orders may be issued by facsimile or by other electronic commerce methods.

OPTIONS

Each option extending the term of this contract shall be for a period of 12 months from the effective date of each option, if exercised.

WAGE RATE DETERMINATIONS

This contract is subject to the Service Contract Act. A wage rate determination shall be requested at the time each individual task order is released. The wage rate determinations applicable to all places of performance are as follows. Copies of these wage rate determinations can be obtained by the Department of Labor at http://www.wdol.gov/.

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

BASE YEAR

CLIN/DESCRIPTION

0001 INSPECTION/TESTING/RE-CERTIFICATION - Contractor shall provide all management, tools, supplies, labor, and equipment to perform inspections, testing, and re-certifications for the following weight handling equipment in accordance with USCG Statement of Work (SOW) entitled “Statement of Work for Inspection, Testing, and Repair Services for First, Fifth, Seventh, Eighth, Ninth, Eleventh, and Thirteenth Coast Guard District Weight Handling Equipment” (Attachment 1). The price of this CLIN shall include inspection, testing, and re-certification of each piece of equipment only.

District 1

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD S. Portland
Kleeco
SP50H
102910214
1 Each
IPF Boston
Kleeco
SP50H
102900206
1 Each
Sector New York – Detachment Sandy Hook
Acme
H-35/4
91195
1 Each
SFO Southwest Harbor
Marine Travel Lift
35BFM
2834-699
1 Each
Sector Long Island Sound
Brownell
SU-2
4318199
1 Each
Sector Southeastern New England
Kleeco
SP50H
102950508
1 Each
Station Gloucester
Acme
H25/4
040894
1 Each
SFO Moriches
Kleeco
SP35H
352920216
1 Each
Station Merrimack River
Marine Travel Lift
SP25H
273040905
1 Each

District 5

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD Cape May
Acme
H30
41481
1 Each
IPD Fort Macon
Marine Travel Lift
50 BRFM
2920-801
1 Each
IPF Portsmouth
Marine Travel Lift
50 BFM
2399/890
1 Each
Station Hatteras Inlet
Kleeco
SP800H
0823988
1 Each
Station Barnegat Light
Acme
H-30
CG-5
1 Each
SFO Eastern Shore
Kleeco
SP800H
0822686
1 Each

District 7

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Miami
Kleeco
SP600H
062829918
1 Each
Sector Charleston
Acme
H-30
062680
1 Each
Sector St. Petersburg
Marine Travel Lift
35BFMII
3066-503
1 Each
Station Key West
Kleeco
SP600H4
6286010
1 Each
Station San Juan
Marine Travel Lift
35BFMII
3006-502
1 Each

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

District 8

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Galveston
Marine Travel Lift
150 CII

1 Each

Base New Orleans
U.S. Hoist
H-50/4T
50110501
1 Each
Sector Mobile
Kleeco
SP-1000H
1020982
1 Each

District 9

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Detroit
Kleeco
SP50H
102850105
1 Each
Sector Buffalo
Marine Travel Lift
50BFM
2838-799
1 Each
Sector Lake Michigan
Acme
H30
121682
1 Each
Sector Sault Ste. Marie
Kleeco
SP800H4
082980707
1 Each
Station Belle Isle
Algonac
20-20-22

1 Each

Station Duluth
Marine Travel Lift
SPL-50R
2828-599
1 Each
Station Erie
Marine Travel Lift
35 BFM
2906-1000
1 Each
Station Grand Haven
Marine Travel Lift
25 BFM
2308-489
1 Each
Station Lorain
Algonac
20-20-22
121688
1 Each
Station Manistee
Marine Travel Lift
50BFMII
3152-0904
1 Each
Station Marblehead
Acme
H30
081081
1 Each
Station Oswego
Marine Travel Lift
30AMO
16741180
1 Each
Station Portage
Marine Travel Lift
35BFM
2704-597
1 Each
Station St. Claires Shore
Algonac
Unknown
Unknown
1 Each
Station Tawas
Kleeco
SP600H4
062619301
1 Each

District 11

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD San Pedro
Marine Travel Lift
35BFMII
2688801
1 Each
Sector San Francisco
Kleeco
SP100H4
112639303
1 Each

District 13

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Puget Sound
Marine Travel Lift
35BFMII
3230-0905
1 Each
Sector Cape Disappointment
Marine Travel Lift
50BFM
2800-199
1 Each
Station Coos Bay
Kleeco
SP50H
102729520
1 Each
Station Grays Harbor
Kleeco
SP800H
082739521
1 Each
Station Neah Bay
Marine Travel Lift
25BFM
28400899
1 Each

Station Tillamook

1 Each

Station Umpqua River
Kleeco
SP800H4
0822485
1 Each
Station Yaquina Bay
Kleeco
DP800H4
0821082
1 Each

CLIN/DESCRIPTION

The following repair services may or may not be required during performance of this contract. The Government estimates a 5% chance that the listed repair services will be required. For evaluation purposes only, the Government will add the total price of all items together and multiply that total by 5% to determine the evaluated price for CLIN 0002.

0002 REPAIR SERVICES – The Contractor shall provide all management, tools, supplies, labor, and equipment to provide repairs if and when authorized by the Contracting Officer prior to commencing any repairs. The Contractor shall be required to submit a Condition Found Report (CFR) for approval by the Contracting Officer. The CFR shall detail the repairs required, labor hours, labor rate, a list of parts – including part numbers, quantities, and unit and total prices. All repair work shall be negotiated with the Contracting Officer. The following prices shall be the fixed prices the Government shall be obligated to pay for the listed repairs.

(A) KLEECO

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(B ) MARINE TRAVEL LIFT

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(C) ACME

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(D) BROWNELL

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(E) ALGONAC

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Subtotal – CLIN 0002A thru 0002E $______________

Bid Factor 5% $______________

0003 TECHNICAL REPRESENTATIVE SERVICES – The Contractor shall provide technical representative services on an as-needed basis. The price for this CLIN shall be the fixed price the Government is obligated to pay for a standard eight (8) hour workday. The number of days will be identified on each individual fixed-price task order.

8 HOURS @ $ /HR = $ /DAY

Any and all travel shall be pre-approved by the Contracting Officer. Travel shall be reimbursed in accordance with Federal Acquisition Regulation (FAR) Part 31.205-36 and current per diem rates for the locations in which services are performed. The Contractor shall be required to submit ALL receipts for review and approval prior to submission of invoices for reimbursement.

The Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advanced purchase. Charges associated with itinerary changes and cancellation under nonrefundable airline tickets are reimbursable only if the change is cause by the Government. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursed.

DATA DELIVERABLES – NOT SEPARATELY PRICED

0004 Data Deliverables - The following data deliverables shall be submitted as required by the Statement of Work.

Operation Test Reports
Rated Load Test Results
Condition Found Reports
Final Inspection Reports

HSCG40-17-Q-53001

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

FIRST OPTION YEAR

CLIN/DESCRIPTION

1001 INSPECTION/TESTING/RE-CERTIFICATION - Contractor shall provide all management, tools, supplies, labor, and equipment to perform inspections, testing, and re-certifications for the following weight handling equipment in accordance with USCG Statement of Work (SOW) entitled “Statement of Work for Inspection, Testing, and Repair Services for First, Fifth, Seventh, Eighth, Ninth, Eleventh, and Thirteenth Coast Guard District Weight Handling Equipment” (Attachment 1). The price of this CLIN shall include inspection, testing, and re-certification of each piece of equipment only.

District 1

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD S. Portland
Kleeco
SP50H
102910214
1 Each
IPF Boston
Kleeco
SP50H
102900206
1 Each
Sector New York – Detachment Sandy Hook
Acme
H-35/4
91195
1 Each
SFO Southwest Harbor
Marine Travel Lift
35BFM
2834-699
1 Each
Sector Long Island Sound
Brownell
SU-2
4318199
1 Each
Sector Southeastern New England
Kleeco
SP50H
102950508
1 Each
Station Gloucester
Acme
H25/4
040894
1 Each
SFO Moriches
Kleeco
SP35H
352920216
1 Each
Station Merrimack River
Marine Travel Lift
SP25H
273040905
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD Cape May
Acme
H30
41481
1 Each
IPD Fort Macon
Marine Travel Lift
50 BRFM
2920-801
1 Each
IPF Portsmouth
Marine Travel Lift
50 BFM
2399/890
1 Each
Station Hatteras Inlet
Kleeco
SP800H
0823988
1 Each
Station Barnegat Light
Acme
H-30
CG-5
1 Each
SFO Eastern Shore
Kleeco
SP800H
0822686
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Miami
Kleeco
SP600H
062829918
1 Each
Sector Charleston
Acme
H-30
062680
1 Each
Sector St. Petersburg
Marine Travel Lift
35BFMII
3066-503
1 Each
Station Key West
Kleeco
SP600H4
6286010
1 Each
Station San Juan
Marine Travel Lift
35BFMII
3006-502
1 Each

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

District 8

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Galveston
Marine Travel Lift
150 CII

1 Each

Base New Orleans
U.S. Hoist
H-50/4T
50110501
1 Each
Sector Mobile
Kleeco
SP-1000H
1020982
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Detroit
Kleeco
SP50H
102850105
1 Each
Sector Buffalo
Marine Travel Lift
50BFM
2838-799
1 Each
Sector Lake Michigan
Acme
H30
121682
1 Each
Sector Sault Ste. Marie
Kleeco
SP800H4
082980707
1 Each
Station Belle Isle
Algonac
20-20-22

1 Each

Station Duluth
Marine Travel Lift
SPL-50R
2828-599
1 Each
Station Erie
Marine Travel Lift
35 BFM
2906-1000
1 Each
Station Grand Haven
Marine Travel Lift
25 BFM
2308-489
1 Each
Station Lorain
Algonac
20-20-22
121688
1 Each
Station Manistee
Marine Travel Lift
50BFMII
3152-0904
1 Each
Station Marblehead
Acme
H30
081081
1 Each
Station Oswego
Marine Travel Lift
30AMO
16741180
1 Each
Station Portage
Marine Travel Lift
35BFM
2704-597
1 Each
Station St. Claires Shore
Algonac
Unknown
Unknown
1 Each
Station Tawas
Kleeco
SP600H4
062619301
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD San Pedro
Marine Travel Lift
35BFMII
2688801
1 Each
Sector San Francisco
Kleeco
SP100H4
112639303
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Puget Sound
Marine Travel Lift
35BFMII
3230-0905
1 Each
Sector Cape Disappointment
Marine Travel Lift
50BFM
2800-199
1 Each
Station Coos Bay
Kleeco
SP50H
102729520
1 Each
Station Grays Harbor
Kleeco
SP800H
082739521
1 Each
Station Neah Bay
Marine Travel Lift
25BFM
28400899
1 Each

Station Tillamook

1 Each

Station Umpqua River
Kleeco
SP800H4
0822485
1 Each
Station Yaquina Bay
Kleeco
DP800H4
0821082
1 Each

The following repair services may or may not be required during performance of this contract. The Government estimates a 5% chance that the listed repair services will be required. For evaluation purposes only, the Government will add the total price of all items together and multiply that total by 5% to determine the evaluated price for CLIN 0002.

1002 REPAIR SERVICES – The Contractor shall provide all management, tools, supplies, labor, and equipment to provide repairs if and when authorized by the Contracting Officer prior to commencing any repair. The Contractor shall be required to submit a Condition Found Report (CFR) for approval by the Contracting Officer. The CFR shall detail the repairs required, labor hours, labor rate, a list of parts – including part numbers, quantities, and unit and total prices. All repair work shall be negotiated with the Contracting Officer. The following prices shall be the fixed prices the Government shall be obligated to pay for the listed repairs.

(A) KLEECO

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(B ) MARINE TRAVEL LIFT

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(C) ACME

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(D) BROWNELL

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(E) ALGONAC

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Subtotal – CLIN 1002A thru 1002E $______________

Bid Factor 5% $______________

1003 TECHNICAL REPRESENTATIVE SERVICES – The Contractor shall provide technical representative services on an as-needed basis. The price for this CLIN shall be the fixed price the Government is obligated to pay for a standard eight (8) hour workday. The number of days will be identified on each individual fixed-price task order.

8 HOURS @ $ /HR = $ /DAY

Any and all travel shall be pre-approved by the Contracting Officer. Travel shall be reimbursed in accordance with Federal Acquisition Regulation (FAR) Part 31.205-36 and current per diem rates for the locations in which services are performed. The Contractor shall be required to submit ALL receipts for review and approval prior to submission of invoices for reimbursement.

The Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advanced purchase. Charges associated with itinerary changes and cancellation under nonrefundable airline tickets are reimbursable only if the change is cause by the Government. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursed.

DATA DELIVERABLES – NOT SEPARATELY PRICED

1005 Data Deliverables - The following data deliverables shall be submitted as required by the Statement of Work.

Operation Test Reports
Rated Load Test Results
Condition Found Reports
Final Inspection Reports

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

SECOND OPTION YEAR

CLIN/DESCRIPTION

2001 INSPECTION/TESTING/RE-CERTIFICATION - Contractor shall provide all management, tools, supplies, labor, and equipment to perform inspections, testing, and re-certifications for the following weight handling equipment in accordance with USCG Statement of Work (SOW) entitled “Statement of Work for Inspection, Testing, and Repair Services for First, Fifth, Seventh, Eighth, Ninth, Eleventh, and Thirteenth Coast Guard District Weight Handling Equipment” (Attachment 1). The price of this CLIN shall include inspection, testing, and re-certification of each piece of equipment only.

District 1

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD S. Portland
Kleeco
SP50H
102910214
1 Each
IPF Boston
Kleeco
SP50H
102900206
1 Each
Sector New York – Detachment Sandy Hook
Acme
H-35/4
91195
1 Each
SFO Southwest Harbor
Marine Travel Lift
35BFM
2834-699
1 Each
Sector Long Island Sound
Brownell
SU-2
4318199
1 Each
Sector Southeastern New England
Kleeco
SP50H
102950508
1 Each
Station Gloucester
Acme
H25/4
040894
1 Each
SFO Moriches
Kleeco
SP35H
352920216
1 Each
Station Merrimack River
Marine Travel Lift
SP25H
273040905
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD Cape May
Acme
H30
41481
1 Each
IPD Fort Macon
Marine Travel Lift
50 BRFM
2920-801
1 Each
IPF Portsmouth
Marine Travel Lift
50 BFM
2399/890
1 Each
Station Hatteras Inlet
Kleeco
SP800H
0823988
1 Each
Station Barnegat Light
Acme
H-30
CG-5
1 Each
SFO Eastern Shore
Kleeco
SP800H
0822686
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Miami
Kleeco
SP600H
062829918
1 Each
Sector Charleston
Acme
H-30
062680
1 Each
Sector St. Petersburg
Marine Travel Lift
35BFMII
3066-503
1 Each
Station Key West
Kleeco
SP600H4
6286010
1 Each
Station San Juan
Marine Travel Lift
35BFMII
3006-502
1 Each

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

District 8

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Galveston
Marine Travel Lift
150 CII

1 Each

Base New Orleans
U.S. Hoist
H-50/4T
50110501
1 Each
Sector Mobile
Kleeco
SP-1000H
1020982
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Detroit
Kleeco
SP50H
102850105
1 Each
Sector Buffalo
Marine Travel Lift
50BFM
2838-799
1 Each
Sector Lake Michigan
Acme
H30
121682
1 Each
Sector Sault Ste. Marie
Kleeco
SP800H4
082980707
1 Each
Station Belle Isle
Algonac
20-20-22

1 Each

Station Duluth
Marine Travel Lift
SPL-50R
2828-599
1 Each
Station Erie
Marine Travel Lift
35 BFM
2906-1000
1 Each
Station Grand Haven
Marine Travel Lift
25 BFM
2308-489
1 Each
Station Lorain
Algonac
20-20-22
121688
1 Each
Station Manistee
Marine Travel Lift
50BFMII
3152-0904
1 Each
Station Marblehead
Acme
H30
081081
1 Each
Station Oswego
Marine Travel Lift
30AMO
16741180
1 Each
Station Portage
Marine Travel Lift
35BFM
2704-597
1 Each
Station St. Claires Shore
Algonac
Unknown
Unknown
1 Each
Station Tawas
Kleeco
SP600H4
062619301
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD San Pedro
Marine Travel Lift
35BFMII
2688801
1 Each
Sector San Francisco
Kleeco
SP100H4
112639303
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Puget Sound
Marine Travel Lift
35BFMII
3230-0905
1 Each
Sector Cape Disappointment
Marine Travel Lift
50BFM
2800-199
1 Each
Station Coos Bay
Kleeco
SP50H
102729520
1 Each
Station Grays Harbor
Kleeco
SP800H
082739521
1 Each
Station Neah Bay
Marine Travel Lift
25BFM
28400899
1 Each

Station Tillamook

1 Each

Station Umpqua River
Kleeco
SP800H4
0822485
1 Each
Station Yaquina Bay
Kleeco
DP800H4
0821082
1 Each

The following repair services may or may not be required during performance of this contract. The Government estimates a 5% chance that the listed repair services will be required. For evaluation purposes only, the Government will add the total price of all items together and multiply that total by 5% to determine the evaluated price for CLIN 0002.

2002 REPAIR SERVICES – The Contractor shall provide all management, tools, supplies, labor, and equipment to provide repairs if and when authorized by the Contracting Officer prior to commencing any repairs. The Contractor shall be required to submit a Condition Found Report (CFR) for approval by the Contracting Officer. The CFR shall detail the repairs required, labor hours, labor rate, a list of parts – including part numbers, quantities, and unit and total prices. All repair work shall be negotiated with the Contracting Officer. The following prices shall be the fixed prices the Government shall be obligated to pay for the listed repairs.

(A) KLEECO

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(B ) MARINE TRAVEL LIFT

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(C) ACME

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(D) BROWNELL

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(E) ALGONAC

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Subtotal – CLIN 2002A thru 2002E $______________

Bid Factor 5% $______________

2003 TECHNICAL REPRESENTATIVE SERVICES – The Contractor shall provide technical representative services on an as-needed basis. The price for this CLIN shall be the fixed price the Government is obligated to pay for a standard eight (8) hour workday. The number of days will be identified on each individual fixed-price task order.

8 HOURS @ $ /HR = $ /DAY

Any and all travel shall be pre-approved by the Contracting Officer. Travel shall be reimbursed in accordance with Federal Acquisition Regulation (FAR) Part 31.205-36 and current per diem rates for the locations in which services are performed. The Contractor shall be required to submit ALL receipts for review and approval prior to submission of invoices for reimbursement.

The Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advanced purchase. Charges associated with itinerary changes and cancellation under nonrefundable airline tickets are reimbursable only if the change is cause by the Government. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursed.

DATA DELIVERABLES – NOT SEPARATELY PRICED

2004 Data Deliverables - The following data deliverables shall be submitted as required by the Statement of Work.

Operation Test Reports
Rated Load Test Results
Condition Found Reports
Final Inspection Reports

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

THIRD OPTION YEAR

CLIN/DESCRIPTION

3001 INSPECTION/TESTING/RE-CERTIFICATION - Contractor shall provide all management, tools, supplies, labor, and equipment to perform inspections, testing, and re-certifications for the following weight handling equipment in accordance with USCG Statement of Work (SOW) entitled “Statement of Work for Inspection, Testing, and Repair Services for First, Fifth, Seventh, Eighth, Ninth, Eleventh, and Thirteenth Coast Guard District Weight Handling Equipment” (Attachment 1). The price of this CLIN shall include inspection, testing, and re-certification of each piece of equipment only.

District 1

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD S. Portland
Kleeco
SP50H
102910214
1 Each
IPF Boston
Kleeco
SP50H
102900206
1 Each
Sector New York – Detachment Sandy Hook
Acme
H-35/4
91195
1 Each
SFO Southwest Harbor
Marine Travel Lift
35BFM
2834-699
1 Each
Sector Long Island Sound
Brownell
SU-2
4318199
1 Each
Sector Southeastern New England
Kleeco
SP50H
102950508
1 Each
Station Gloucester
Acme
H25/4
040894
1 Each
SFO Moriches
Kleeco
SP35H
352920216
1 Each
Station Merrimack River
Marine Travel Lift
SP25H
273040905
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD Cape May
Acme
H30
41481
1 Each
IPD Fort Macon
Marine Travel Lift
50 BRFM
2920-801
1 Each
IPF Portsmouth
Marine Travel Lift
50 BFM
2399/890
1 Each
Station Hatteras Inlet
Kleeco
SP800H
0823988
1 Each
Station Barnegat Light
Acme
H-30
CG-5
1 Each
SFO Eastern Shore
Kleeco
SP800H
0822686
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Miami
Kleeco
SP600H
062829918
1 Each
Sector Charleston
Acme
H-30
062680
1 Each
Sector St. Petersburg
Marine Travel Lift
35BFMII
3066-503
1 Each
Station Key West
Kleeco
SP600H4
6286010
1 Each
Station San Juan
Marine Travel Lift
35BFMII
3006-502
1 Each

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

District 8

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Galveston
Marine Travel Lift
150 CII

1 Each

Base New Orleans
U.S. Hoist
H-50/4T
50110501
1 Each
Sector Mobile
Kleeco
SP-1000H
1020982
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Detroit
Kleeco
SP50H
102850105
1 Each
Sector Buffalo
Marine Travel Lift
50BFM
2838-799
1 Each
Sector Lake Michigan
Acme
H30
121682
1 Each
Sector Sault Ste. Marie
Kleeco
SP800H4
082980707
1 Each
Station Belle Isle
Algonac
20-20-22

1 Each

Station Duluth
Marine Travel Lift
SPL-50R
2828-599
1 Each
Station Erie
Marine Travel Lift
35 BFM
2906-1000
1 Each
Station Grand Haven
Marine Travel Lift
25 BFM
2308-489
1 Each
Station Lorain
Algonac
20-20-22
121688
1 Each
Station Manistee
Marine Travel Lift
50BFMII
3152-0904
1 Each
Station Marblehead
Acme
H30
081081
1 Each
Station Oswego
Marine Travel Lift
30AMO
16741180
1 Each
Station Portage
Marine Travel Lift
35BFM
2704-597
1 Each
Station St. Claires Shore
Algonac
Unknown
Unknown
1 Each
Station Tawas
Kleeco
SP600H4
062619301
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD San Pedro
Marine Travel Lift
35BFMII
2688801
1 Each
Sector San Francisco
Kleeco
SP100H4
112639303
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Puget Sound
Marine Travel Lift
35BFMII
3230-0905
1 Each
Sector Cape Disappointment
Marine Travel Lift
50BFM
2800-199
1 Each
Station Coos Bay
Kleeco
SP50H
102729520
1 Each
Station Grays Harbor
Kleeco
SP800H
082739521
1 Each
Station Neah Bay
Marine Travel Lift
25BFM
28400899
1 Each

Station Tillamook

1 Each

Station Umpqua River
Kleeco
SP800H4
0822485
1 Each
Station Yaquina Bay
Kleeco
DP800H4
0821082
1 Each

The following repair services may or may not be required during performance of this contract. The Government estimates a 5% chance that the listed repair services will be required. For evaluation purposes only, the Government will add the total price of all items together and multiply that total by 5% to determine the evaluated price for CLIN 0002.

3002 REPAIR SERVICES – The Contractor shall provide all management, tools, supplies, labor, and equipment to provide repairs if and when authorized by the Contracting Officer prior to commencing any repairs. The Contractor shall be required to submit a Condition Found Report (CFR) for approval by the Contracting Officer. The CFR shall detail the repairs required, labor hours, labor rate, a list of parts – including part numbers, quantities, and unit and total prices. All repair work shall be negotiated with the Contracting Officer. The following prices shall be the fixed prices the Government shall be obligated to pay for the listed repairs.

(A) KLEECO

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(B ) MARINE TRAVEL LIFT

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(C) ACME

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(D) BROWNELL

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Total

(E) ALGONAC

DESCRIPTION
EST. QTY
UNIT PRICE
TOTAL PRICE
A
Remove, overhaul, and reinstall all hydraulic control valves
1 Job
B
Remove, overhaul, and reinstall all hydraulic hoist motors
1 Job
C
Remove, overhaul, and reinstall all hydraulic manifolds
1 Job
D
Remove, overhaul, and reinstall all hydraulic pumps
1 Job
E
Remove, overhaul, and reinstall all hydraulic controllers
1 Job
F
Remove, overhaul, and reinstall all hydraulic winch motors
1 Job
G
Remove, overhaul, and reinstall all hydraulic steering rams
1 Job
H
Remove, overhaul, and reinstall all hydraulic steering motor mechanisms
1 Job
I
Flush entire hydraulic system
1 Job
J
Replace hydraulic filters in-kind with new
1 Job
K
Replace hydraulic hose assemblies with new
1 Job
L
Replace all hoisting cable sheaves
1 Job
M
Clean, inspect, and slush all hoisting cables
1 Job
N
Replace and slush all hoisting cables
1 Job
O
Overhaul/replace drive steering wheels
1 Job
P
Overhaul/replace wheel bearings
1 Job
Q
Renewal all hydraulic and diesel engine gauges
1 Job
R
Renew lifting slings
1 Job
S
Remove, inspect, renew/replace wheels, wheel bearings and seals
1 Job
T
Inspect/overhaul engine/price movers
1 Job

Subtotal – CLIN 3002A thru 3002E $______________

Bid Factor 5% $______________

3003 TECHNICAL REPRESENTATIVE SERVICES – The Contractor shall provide technical representative services on an as-needed basis. The price for this CLIN shall be the fixed price the Government is obligated to pay for a standard eight (8) hour workday. The number of days will be identified on each individual fixed-price task order.

8 HOURS @ $ /HR = $ /DAY

Any and all travel shall be pre-approved by the Contracting Officer. Travel shall be reimbursed in accordance with Federal Acquisition Regulation (FAR) Part 31.205-36 and current per diem rates for the locations in which services are performed. The Contractor shall be required to submit ALL receipts for review and approval prior to submission of invoices for reimbursement.

The Contractor shall, to the maximum extent practicable, minimize overall travel costs by taking advantage of discounted airfare rates available through advanced purchase. Charges associated with itinerary changes and cancellation under nonrefundable airline tickets are reimbursable only if the change is cause by the Government. Travel performed for personal convenience or daily travel to and from the contractor’s normal work site shall not be reimbursed.

DATA DELIVERABLES – NOT SEPARATELY PRICED

3004 Data Deliverables - The following data deliverables shall be submitted as required by the Statement of Work.

Operation Test Reports
Rated Load Test Results
Condition Found Reports
Final Inspection Reports

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

FOURTH OPTION YEAR

CLIN/DESCRIPTION

4001 INSPECTION/TESTING/RE-CERTIFICATION - Contractor shall provide all management, tools, supplies, labor, and equipment to perform inspections, testing, and re-certifications for the following weight handling equipment in accordance with USCG Statement of Work (SOW) entitled “Statement of Work for Inspection, Testing, and Repair Services for First, Fifth, Seventh, Eighth, Ninth, Eleventh, and Thirteenth Coast Guard District Weight Handling Equipment” (Attachment 1). The price of this CLIN shall include inspection, testing, and re-certification of each piece of equipment only.

District 1

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD S. Portland
Kleeco
SP50H
102910214
1 Each
IPF Boston
Kleeco
SP50H
102900206
1 Each
Sector New York – Detachment Sandy Hook
Acme
H-35/4
91195
1 Each
SFO Southwest Harbor
Marine Travel Lift
35BFM
2834-699
1 Each
Sector Long Island Sound
Brownell
SU-2
4318199
1 Each
Sector Southeastern New England
Kleeco
SP50H
102950508
1 Each
Station Gloucester
Acme
H25/4
040894
1 Each
SFO Moriches
Kleeco
SP35H
352920216
1 Each
Station Merrimack River
Marine Travel Lift
SP25H
273040905
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPD Cape May
Acme
H30
41481
1 Each
IPD Fort Macon
Marine Travel Lift
50 BRFM
2920-801
1 Each
IPF Portsmouth
Marine Travel Lift
50 BFM
2399/890
1 Each
Station Hatteras Inlet
Kleeco
SP800H
0823988
1 Each
Station Barnegat Light
Acme
H-30
CG-5
1 Each
SFO Eastern Shore
Kleeco
SP800H
0822686
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Miami
Kleeco
SP600H
062829918
1 Each
Sector Charleston
Acme
H-30
062680
1 Each
Sector St. Petersburg
Marine Travel Lift
35BFMII
3066-503
1 Each
Station Key West
Kleeco
SP600H4
6286010
1 Each
Station San Juan
Marine Travel Lift
35BFMII
3006-502
1 Each

ADDENDUM TO STANDARD FORM 1449

SUPPLIES OR SERVICES AND PRICES/COSTS

District 8

LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
Sector Galveston
Marine Travel Lift
150 CII

1 Each

Base New Orleans
U.S. Hoist
H-50/4T
50110501
1 Each
Sector Mobile
Kleeco
SP-1000H
1020982
1 Each
LOCATION
MANUFACTURER
MODEL NO.
SERIAL NO.
QUANTITY
UNIT PRICE
TOTAL PRICE
IPF Detroit
Kleeco
SP50H
102850105
1 Each
Sector Buffalo
Marine Travel Lift
50BFM
2838-799
1 Each
Sector Lake Michigan
Acme
H30
121682
1 Each

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .