A00003_-_Questions_and_Answers.pdf

PDF 9 KB Posted

Attached to
HIFR_Hose_Repair
Solicitation number
HSCG40-17-Q-20738
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
A00003.pdf PDF
Drawing_FL_9150_2_1_-_E.pdf PDF
A00002.pdf PDF
A00001.pdf PDF
HSCG40-17-Q-20738.pdf PDF
Schedule_of_Services.pdf PDF
R-542-0604_HIFR_Spec_REV_A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG40-17-Q-20738

Questions and Answers

Q: Is that labor rate supposed to include the parts listed in the USCG HIFR Refurbishment – R-542-

0604 Spec, at para. 3.7 Refurbishment and delivery?

A: CLINS X001 - The Contractor shall provide all necessary labor, equipment (less the GFE stated in the solicitation) at a loaded composite hourly rate, including profit, G&A, and overhead required to perform an inspection and submit reports on each item for repair in accordance with the specification.

CLINS X002 – The Contractor shall provide all necessary equipment, labor, and materials at a loaded composite hourly rate, including profit, G&A, and overhead, to arrive at a total price to repair, test, prepare and submit a Final Inspection Report, preserve, package, mark, and deliver each hose in accordance with the specification.

File details come from the government source that posted it. Updated .