Reintjes_Specification.docx

DOCX document 81 KB Posted

Attached to
OVERHAUL MARINE GEARS
Solicitation number
HSCG40-16-R-53000
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
SF1449_ez.pdf PDF
RIENTJES_SOLICIATION.pdf PDF
Spec_R2410595.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION No. CHANGE No.

TITLE

OVERHAUL SPECIFICATION

REINTJES WVS 234 UP REDUCTION GEAR

PURCHASE NEW GEARS

SPECIFICATION NUMBER

R-241-0595

ORGINATED BY Seni Ok DATE 08/28/15_________

ORIGINATOR’S COMMAND Surface Forces Logistics Center (SFLC) _____________

DEPARTMENT / DIVISION Small Boat Product Line (SBPL) ___________________

INTERNAL REVIEWER____________________________DATE___________________

SWORB APPROVAL__________________________DATE_________________

1.0 SCOPE

1.1.

a. This specification sets forth the requirements for receiving, disassembly, overhaul reassembly, testing, painting, and preservation and packaging of Reintjes WVS 234 UP Marine Reduction Gears. These gears are attached to the main propulsion units installed on the U.S. Coast Guard’s (117) 47’ MLBs. The Original Equipment Manufacturer (OEM) is Reintjes GmbH (Eugen-Reintjes-Strabe 7) Germany.

b. This specification sets forth the requirements for purchasing new gears

1.2. CLASSIFICATION: This sets forth the requirements for the following equipment:

a. Reintjes WVS 234UP Marine Gear (NSN 3010-12-344-0596)

1.3. GOVERNMENT FURNISHED MATERIAL:

a. Reintjes WVS 234UP Marine Gear (NSN 3010-12-344-0596)

2.0 APPLICABLE DOCUMENTS

2.1. DOCUMENT AVAILABILITY - For the methods and conditions for obtaining the referenced documents refer to section 6.0.

2.2. GOVERNMENT DOCUMENTS - The following specifications and standards form a part of this specification to the extent specified herein.

a. MIL-C-104-C Dated 19 May 2009, Crates Type II, Class II, Style A.

b. MIL-DTL-15090E Dated 12 October 2010, Coating, Enamel.

c. MIL-PRF-2104F, 12 July 2014, Lubricating Oil, Grade 40.

d. MIL-D-3464-E Dated 21 April 1987, Desiccant, Activated Bag.

e. D-000-0100-G Dated February 2006, Bar Coding

2.3. COMMERCIAL DOCUMENTS - The following documents form a part of this specification to the extent specified herein. The documents shall be the version listed by number and date from the referenced industry organization. Commercial documents may also be listed in the Department of Defense Index of Specifications and Standards (DODISS).

a. Reintjes Operating Manual (Marine Reverse Reduction Gear) Type WAF 240-470

b. ANSI/NCSL Z540 3 2006.08.03, Requirements for the Calibration of Measuring.

c. ANSI/ASQC Q90003-1994 Dated July 94, Inspection System.

2.4. SPECIFICATION ORDER OF PRECEDENCE - In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence, unless otherwise specified herein. The Contractor shall notify the Contracting Officer in writing of any perceived conflicts contained herein.

2.5. DEPARTURE FROM SPECIFICATION – Departure from this specification shall not be allowed unless approved by the USCG Contracting Officer.

a. If the Contractor finds it necessary to suggest implementing change or depart from applicable specifications they shall request permission.

b. Request for change shall clearly describe the changes proposed, the reason for change, advantages of the proposed changes, price increase or decrease (if any) resulting from the change.

3.0 REQUIREMENTS

3.1. GENERAL – The Contractor shall be required to be required to complete the following requirements in accordance with the attached Delivery Schedule.

a. Receive Gear

b. Disassemble Gear

c. Submit Appendix A (Condition Found Report)

d. Overhaul Gear

e. Submit Appendix C (Spin-Test Report)

f. Preserve

g. Paint Packaging and Marking

h. Submit Appendix D (Cumulative Tracking Report)

i. Purchase New Gear (Optional)

3.2. The Contractor shall provide all labor, parts, equipment, special tools and materials required to complete the requirements.

a. The gear overhaul shall be performed by a Reintjes Certified Facility. The definition of “Certified Facility” is the Contractor has provided legible documentation from Reintjes GmbH (Eugen-Reintjes-Strabe 7) Germany (OEM) acknowledging the Contractor is authorized to meet the requirements of this specification.

b. The Contractor’s Technician for all requirements of this specification shall be certified and trained with a Reintjes certification for the WVS 234 UP model gear. Copies shall be provided to the Contracting Officer.

c. The Contractor shall legally possess all OEM Technical Publications.

d. All tools and test equipment shall be calibrated in accordance with Section 4.3.

e. The Contractor shall provide all special tooling, jigs and fixtures to accomplish the overhaul.

f. The overhauls and all component inspections shall be completed using only genuine OEM parts, OEM components, processes, and practices.

g. The parts listed in Appendix B shall be new genuine OEM parts or factory reconditioned conforming to OEM specifications for reusable parts, with the approval of the Contracting Officer.

h. The Contractor shall have the capabilities to conduct all testing on-site at the Contractor’s facility in accordance with Reintjes procedures. The USCG reserves the right to witness all testing.

i. The Contractor shall be responsible to provide the USCG all updated data in regards to gear configuration, service bulletins, TP changes/revisions, parts, and part number changes.

j. Upon receipt of any gear, regardless of condition, the Contractor shall store the gear inside and keep from exposure to all weather.

k. In the event, contingency parts & labor are required in order to accomplish the overhaul, the contingency parts & labor shall be priced separately and shall be negotiated under each task order as required.

3.3. FAILURE ANALYSIS - In the event of a catastrophic failure and at the discretion of the Government; on a separate task order the gear will be sent to the Contractor’s facility to determine the cause of the casualty. All parts & labor shall be priced separately and shall be negotiated under each task order. A report of the findings shall be submitted to the Contracting Officer within thirty (30) days of receipt of the gear.

3.4. The Contractor shall submit a request to the Contracting Officer for the disposition of used parts.

3.5. REQUIRED REPORTS – The Contractor shall submit the following reports within the time lines set herein:

a. The Contractor shall disassemble the gear and submit Appendix A to the Contracting Officer for approval within thirty (30) days of receiving the gear.

b. Within sixty (60) days after notice to proceed, the contractor shall complete the approved work per OEM specifications and spin-testing requirement per Appendix C.

c. Cumulative Tracking Report (Appendix D). The Contractor shall submit Appendix E to the Contracting Officer quarterly no later than the 15th calendar day of the month. The report shall capture the progress of each task order, and or delivery orders annotated in the previous months report.

d. Failure Analysis Report shall be submitted to the Contracting Officer within (30) days of receipt of the gear.

Reintjes Marine Reduction Gear Overhaul Specification

e. Government Property Report. The Contractor shall provide a report IAW FAR 52-245-1 upon request.

3.6. GENERAL TEST REQUIREMENTS:

a. The Reduction Gear spin test shall be completed and the pass/fail criteria detailed in Appendix C shall be recorded and submitted to the Contracting Officer.

b. During the final acceptance test, the USCG Representative shall have the capability to visually monitor all required parameters simultaneously.

c. All gear testing shall be verified and accepted by a USCG Representative.

d. Any unusual noise, external leakage or any other noncompliance to this specification determined by the USCG Representative shall be cause for the gear to be found unacceptable.

3.7. NOTIFICATIONS & INSPECTIONS - The Contractor shall be responsible for notifying the Contracting Officer and COR at least seven (7) working days prior to being ready for any inspections or testing

a. Prior to notification the USCG of final testing, the gears shall be pretested with all the test results documented and made available upon the USCG representative’s arrival.

3.8. WARRANTY - A warranty of one year from installation or 1800 operating hours, whichever occurs first and 24 months of storage is required covering the entire marine gear. Storage commences upon receipt of engine at the designated USCG facility.

4.0 QUALITY ASSURANCE

4.1. GENERAL - The Contractor shall maintain an inspection system, which shall ensure each item offered to the USCG for acceptance conforms to contract requirements. The system shall be documented and in compliance with ANSI/ASQS Q90003.

4.2. RECORDS - The Contractor shall maintain records of all inspections and tests. The records shall indicate the nature and number of observations made, type of deficiencies found and the corrective action taken.

4.3. CONTRACTORS CALIBRATION SYSTEM The Contractor as well as any Subcontractors shall be required to maintain a calibration and maintenance system to control the accuracy of measurement and test equipment used in the fulfillment of this contract in accordance with ANSI/NCSL Z540-3. The system include as a minimum, prescribed calibration intervals, source of calibration and a monitoring system to ensure adherence to calibration schedules. Calibration standards shall be traceable to the National Institute of Standards and Technology (NIST).

4.4. RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for all inspections/test requirements specified herein. The Contractor shall provide space, personnel, and test equipment to conduct all inspection requirements. All testing and inspection shall be at the Contractors facility acceptable to the USCG. The USCG reserves the right to verify or have performed any of the inspection/tests set forth in this specification where such inspections are deemed necessary.

4.5. PACKING INSPECTION - The USCG reserves the right to perform an on-site inspection of the preservation and marking requirements if deemed necessary.

5.0 PRESERVATION, PACKAGING, PACKING, & MARKING

5.1. PRESERVATION (Internal) - The gear shall be preserved as per the requirements of the Reintjes Operarting Manual after operational testing, and acceptance by the USCG.

5.2. PRESERVATION (External) - After completion of the final test run and internal preservation the gear shall be prepared in accordance with Reintjes Marine Gears Anti-Corrosion Protection Guidelines.

a. All loose scale and paint shall be removed prior to priming and painting.

b. The gear shall be painted grey in accordance with MIL-DTL-15090E on all surfaces 3-5 mils thick, allow a minimum of seven (7) hours drying for primed surfaces.

c. When all paint is dry, the masking shall be removed.

d. Coat all unpainted metal surfaces with a light amount of grease, except for hot surfaces.

e. Plug or cap any fittings/flanges or openings that will allow seepage.

f. The Contractor shall attach to the gear, in a plastic envelope, a completed copy of the final test report (Appendix D) and warranty information (Appendix E).

5.3. PACKING - The shipping container if damaged shall be constructed and mounted to the base skidded pallet as per MIL-C-104C. The gear shall be packaged in accordance with Reintjes Marine Gears Preservation Guidelines for corrosion proofing, types of packaging, storage conditions/storage periods.

a. The Contractor shall securely fasten the gear into the approved shipping container. It shall be fastened in a manner that adequately ensures protection during multiple common carrier practices.

5.4. MARKING – Each preserved, packed, and packaged item shall be stenciled in the upper left-hand side of the two longest sides, (two opposite sides if square) of each box.

a. Machine made stencils shall be used for all marking.

b. All marking shall be in black print on a contrasting back ground (white paint) and at least 2” high.

c. The marking shall be in the format as follows:

NATIONAL STOCK NUMBER “As per Enclosed Gear”

PART NUMBER

ITEM NAME Transmission MODEL NUMBER “As per Enclosed Gear” SERIAL NUMBER “As per Enclosed Gear” CONTRACT NUMBER See Contract DELIVERY ORDER NUMBER As submitted on the Order SHIPPING WEIGHT As Determined by Contractor

QUANTITY & UNIT OF ISSUE 1- EA

PRESERVED FOR LONG TERM

STORAGE ON Date preserved

CONDITION CODE CONDITION A

OTHER DATA AS COAST GUARD SFLC MATERIAL

DIRECTED REUSABLE CONTAINER,

DO NOT DAMAGE.

DO NOT STACK.

d. The following marking shall be placed on all four sides and the top of each box, in stenciled black print at least 2” high.

Reusable Container- Do Not Damage Remove Bolts Prior To Removing Cover Use Forklift to Unload Do Not Lift By Cover

5.5. BAR CODING – Bar code labels shall be supplied on all Contract Line Item Numbers (CLIN), except for those that require data submissions only.

a. All bar coded labels shall be in accordance with SFLC specification D-000-0100.

b. The actual labels shall be Type “V”, Grade “A”, Style”2”, Composition “b” with plastic laminate.

c. Each label shall contain encoded data for the Stock Number, Delivery Order Number and Contract Number.

6.0 GOVERNMENT & COMMERCIAL DOCUMENT SOURCES

6.1. GOVERNMENT DOCUMENTS

a. USCG Surface Forces Logistics Center

2401 Hawkins Point Road
Baltimore, MD 21226
410-762-6112

6.2. COMMERCIAL DOCUMENTS

a. International Organization for Standardization

American National Standards Institute (ANSI)
1430 Broadway
New York, NY 10018
212-642-4900

6.3. ENCLOSURES – The following enclosures apply:

a. Appendix A Condition Found Report

b. Appendix B Mandatory Parts List

c. Appendix C Gear Spin Test Report

d. Appendix D Cumulative Tracking Report

e. Appendix E Warranty Information

Task Order #:_____________________________ Delivery Order #:__________________________ Engine Serial #:___________________________ Reduction Gear Serial #:____________________

Condition Found

Repairs Required

Parts Required

Parts Expended

Recommendations

Appendix A Condition Found Report

As part numbers are superseded, the new part numbers shall be used as the given part numbers for this specification. ALL part numbers shall be verified prior to ordering. Any part number changes shall be forwarded in writing to the COR

Mandatory Replacement Parts

No
Item Number
Description
Qty
1
170054
E13 Bearing 32019 X
1
2
170054
E15 Bearing 32019 X
1
3
81391
E16 Bearing 31313 J1
2
4
170054
E122 Bearing 32019X
2
5
81391
E123 Bearing 31313 J1
2
6
77016
P20 Bearing NU215
1
7
738654
P21 Bearing 30310A
1
8
738662
P22 Bearing 31310A
1
9
738670
P74 Bearing NU2214E
1
10
603350
E11 Shaft Seal 70X90X12/585
1
11
SS1851
E219 Shaft Seal 85X110X12
1
12
21903
E1501 O-Ring
1
13
21903
E1502 O-Ring
1
14
705526
W12 Bush 70X55X26
1
15
800147
K7 Piston Ring
2
16
8850
K13 Allen Head Bolt 8x25
36
17
20753
K18 Piston Ring 155x142, 6x4
2
18
469947
K22 Inner Disc
22
19
23K3602
K23 Outer Disc, Waffle
24
20
170038
W162 Screw Plug 16x1, 5 906
12
21
572721
W163 Allen Bolt
12
22
550515
W164 Spring 3x11, 5x46/8, 5
12
23
8850
W166 Allen Head Bolt 8x25
44
24
28G2352
E203 Spring 1,5x7, 5x28/6
4
25
301361
E714 Seal Set, Oil Pump
1
26
301167
E725 Bearing, Oil Pump
1
27
411396-01
A283 Seal Set Oil Filter
1
28
282987
A282 Seal Set Oil Cooler –OK 11/25
1
29
300632
V223 Seal Set, Control Valve
1
30
705500
V422 Seal Set, Pressure Valve
1
31
659304
V351 Sinter Filter
1
32
395803
A37 Filter Element
2
33
139120
E711 Shim Set, 139.5x120x
1
34
144132
E712 Shim Set, 144.5x132x
1
35
171948
K8 hex Bolt 933-8x30 SK
12
36
45128
K61 Locking Wire Kit
1
37
800039
R43 Retaining Ring 471-65x2.5
2
38
800175
R44 Circlip Seeger AW 55x2
2
39
4710111
P159 Circlip 471-75x2.5
1
40
4710135
P172 Circlip 471-70x2.5
2
41
GS51580
51580 Sealant
1

Appendix B Mandatory Parts List

Repair Order #

Date:

Model:

Ratio:

Serial Number:

Spec Number:

Tested By: (print name)

Time Start:

Time Finished:

Pass
Fail
Procedure

All tests must be completed and data recorded.

1
|_|
|_|
Start motor at 650 RPM and verify the presence of oil pressure in forward and reverse. Note pressure below.
2
|_|
|_|
Increase the motor speed to 1800 RPM and maintain it until the internal oil temperature is 140-176 F
3
|_|
|_|
Reduce speed to 650 RPM. Perform 10 forward/reversing cycles. Insure that the engagement is instantaneous but soft. Confirm that the control lever moves without binding.
4
|_|
|_|
Confirm that the pump pressure is steady (max variation 20 bar). Note pressure below.
5
|_|
|_|
Confirm that gear will obtain full RPM in forward and reverse.
6
|_|
|_|
Record individual bearing temperatures.

Operational Test

TEST RANGE RPM
TEST PORT
MAIN PSI
FORWARD CLUTCH PSI
REVERSE CLUTCH PSI
Bearing Temperatures *

NEU

N/A
N/A
Input FWD
Input

AFT

Output FWD
Output

AFT

650
FWD
N/A

N/A

1800
FWD
N/A

N/A

650
REV
N/A
N/A
1800
REV
N/A
N/A
7
|_|
|_|
Unusual Noise (Pass/Fail)
8
|_|
|_|
Pressures (Refer to transmission manual for pressure specifications and monitoring points.)
9
|_|
|_|
Visual check of unit for leaks. (No leakage should be detected.)
10
|_|

Record Oil Temperature at end of test: (F)

11
|_|
|_|
Remove oil and inspect filter. Clean suction filter and install new lubrication filter

(if applicable).

NOTE – (*) The FWD and AFT bearing temperatures on any common shaft shall not have a temperature differential of greater than 15 Degrees F. If the temperature differential exceeds 15 Degrees F, the test will be stopped. This requirement is for spin tests only. The maximum temperature differential of 15 Degrees F is not applicable once the gear is installed.

Description of failures and corrective actions:

Technician Signature

Date:

Contractor Manager Signature

Date:

USCG Representative Signature

Date:

Appendix C Gear Spin Test Report

Gear Serial #
D/O #
Core Accepted

Y/N

Percentage Complete
Date Completed

Appendix D Cumulative Tracking Report

Warranty Period for Reintjes WVS 234 UP Marine Gears

1800 Hours of Operation OR (2) Year from Date of Installation

****After installation, return this completed sheet to the following****

USCG SFLC SBPL

2401 Hawkins Point Road Baltimore, MD 21226-5000

Unit Name:

Engine Serial Number

Hull Number:

R/G Serial Number

Homeport:

Date Received:

POC:

Date Installed:

Telephone:

Any discrepancies noted upon receipt/during warranty period

DO NOT REPAIR OR REPLACE!!!

Repairs are to be performed only after contacting Small Boat Product Line

OFFICE PHONE: (410) 762-6112

!!Any unauthorized repairs could void the WARRANTY!!

1. GENERAL CHECKS UPON RECEIPT OF GEAR

A. A COMPLETE INSPECTION SHOULD BE MADE OF THE UNIT'S CONDITION.

B. PRESERVATION TAGS ON THE GEAR WILL TELL YOU TO WHAT EXTENT THE UNIT HAS BEEN PRESERVED AND WHAT SHOULD BE DONE BEFORE PLACING THE UNIT IN OPERATION.

C. UNCOVER ALL TAPED AND PLUGGED OPENINGS PRIOR TO CONNECTING OF HOSES AND LINES.

D. INSURE THAT ALL LUBE OIL LINES LEFT ON BOARD ARE FLUSHED AND ALL FILTERS ARE CHANGED.

E. ENSURE PROPER SHAFT ALIGNMENT. IF REDUCTION GEAR IS INSTALLED WHILE THE VESSEL IS OUT OF THE WATER, YOU MUST WAIT 24 HOURS AFTER THE VESSEL IS PLACED IN THE WATER BEFORE ALIGNING THE SHAFT. ALL TANKS MUST BE TOPPED OFF.

F. CONFIRM THE CALIBRATION OF THE L/O DIPSTICK.

G. ENSURE THE REDUCTION GEAR WILL BAR OVER BY HAND.

H. CHECK REDUCTION GEAR MOUNTS.

I. ANY PROBLEMS DURING THE INSTALLATION SHOULD BE REPORTED TO SMALL BOAT PRODUCT LINE IMMEDIATELY.

2. GENERAL WARRANTY PARAMETERS

A. THINGS THAT WILL NOT VOID THE WARRANTY.

1. Preventive maintenance may be performed.

2. Troubleshooting the gear in accordance with your Type Manual.

NOTE: Emergency repairs/replacement of parts may be performed, but notify the Small Boat Product Line Team immediately.

B. SOME THINGS THAT COULD VOID THE WARRANTY

1. Changing subassemblies without authorization.

2. Removing the L/O cooler cores.

3. Removing gear housing.

** CAUTION: DO NOT ROTATE THE OUTPUT OR INPUT SHAFT UNTIL READY TO INSTALL UNIT.

** CAUTION: REMOVE ALL COVERS, PLUGS AND TAPE COVERING OPENINGS.

NOTICE: FOR FURTHER INFORMATION CALL SMALL BOAT PRODUCT LINE TEAM

REPAIRS ARE TO BE PERFORMED ONLY AFTER CONTACTING THE SMALL BOAT PRODUCT LINE (SBPL) TEAM

OFFICE PHONE: (410) 762-6112

Appendix E Warranty Information image1.wmf

File details come from the government source that posted it. Updated .