OVERHAUL_DESCRIPTION_ZB054_MAY_2016.doc
DOC document 101 KB Posted
- Solicitation number
- HSCG40-16-Q-ZB054
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PACKAGING_REQUIREMENTS_FY_2015.doc | DOC document | |
| FAR_CLAUSE_MARCH_2016.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
OVERHAUL DESCRIPTION
ITEM NAME STOCK NUMBER PART NUMBER
PUMP , FUEL,METERINGAND DISTRIBUTING
2910 - 99-735-6301 SHELF LIFE CD 0
OD30539
USED ON 110' WPB "A" AND "B" CLASS VESSELS
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contract ing Officer.
OVERHAUL REQUIREMENTS:
OVERHAUL DESCRIPTION
ITEM NAME : PUMP, FUEL, METERING AND DISTRIBUTION STOCK NO. 2910-99-735-630 1
PART NUMBER : OD30539
USED ON : 110' WPB "A" AND "B" CLASS VESSELS
Assembly as received by the contractor must be complete and of the proper cited part number. duscrepencies shall be reported to the Coast Guard Contracting Officer.
PRELIMINARY INSPECTION REQUIREMENTS:
The Pump, Fuel Metering and Distribution shall be inspected in order to determine the extent of the required repairs. An estimate shall be provided to the Coast Guard Contracting Officer, which shall include: New parts required with prices, labor rate, labor hours required and a total estimate for all required services including repair or replacement of packaging and packing . The serial number for each Pump, Fuel Meter ing and Distribution shall be included in the inspection report.
OVERHAUL REQUIREMENTS:
The Pump, Fuel Metering and Distribution shall be overhauled to a condition, which shall restore the operating and performance characteristics to the "original" design and technical specifications. Overhaul shall be performed in accordance with OEM specificat ions and standards. All repair parts shall be genuine OEM manufactured parts. Following completion of overhaul, the Contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy of each certification shall be forwarded to the Coast Guard Contracting Officer.
GOVERNMENT ACCEPTANCE :
Acceptance will be made at destination by a Government Representative. Acceptance will be contingent upon the Representative's verificat ion of no damage in transit, correctness and completeness of order and contractors conformance to preservation, packaging, packing, marking and bar-coding requirements.
PERSERVATION :
FOR OFACIAL USE ONLY
Each PUMP, FUEL, METERING AND DISTRIBUTION shall be preserved and packaged for protection against deterioration for a period of up to two years.
PACKAGING, PACKING AND MARKING FOR SHIPMENT:
Each PUMP, FUEL, METERING AND DISTRIBUTION shall be packaged individually in a wooden box, which shall be capable of providing adequate protection during long term warehouse storage and multiple commercial shipments. The contents shall be packed to prevent movement. Mark each box in legible waterproof black print lettering on a painted white background with the following information:
NATIONAL STOCK NUMBER : 2910-99-735-6301
ITEM NAME : PUMP, FUEL, METERING AND DISTRIBUTION PART NUMBER : OD30539
GOVERNMENT ORDER NUMBER DATE OF REPAIR : SERIAL NUMBER :
And the words: "Coast Guard SFLC Material, Condition Code A" . Estimated cost to open, inspect and report: $100.00 Estimated cost to overhaul: $1,219.59 Estimated cost new $1,319.59 COR Recommended Source I MAN Diesel Repair Facility
FLUID MECHANICS INC.
215 SOUTHWEST 32ND STREET FORT LAUDERDALE, FL 33315 (954) 525-1755
ATTN: STACEY KUTSCHER
WARRANTY:
Standard Manufacturer' s Warranty
| X | B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory . NOT FOR IMMEDIATE INSTALLATION. Contractor must guarantee item against defects that lead to failure for |
| 90 | days after installation for a period of up to two (2) years after delivery to Coast Guard. |
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative. Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
OVERHAUL DESCRIPTION
PRESERVATION / PACKAGING:
| X | A . Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum. |
| B. | See Attachments |
PACKAGING AND MARKING FOR SHIPMENT:
A . Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
2910- 99- 735- 6301
PUMP,FUEL,METERINGAND DISTRIBUTING
OD30539
And the words: "Coast Guard SFLC Material, Condition "A" X B. See Attachments file_0.bin file_1.bin file_2.bin file_3.bin file_4.bin file_5.bin file_6.bin file_7.bin file_8.bin file_9.bin file_10.bin file_11.bin file_12.bin file_13.bin file_14.bin file_15.bin file_16.bin file_17.bin file_18.bin file_19.bin file_20.bin file_21.bin
File details come from the government source that posted it. Updated .