Schedule A / Request for Quote

USCG SURFACE FORCES LOGISTICS CENTER

C&P3 SAP SECTION

2401 Hawkins Point Road, Baltimore, MD 21226-5000

From: Ramona HatfieldE-mail: Ramona.E.Hatfield@uscg.mil
Fax: (410) 762-6008Voice: 410-762-6101

TO: Vendor Name DATE: 20 September 2016

Please provide a quotation for the following, (via fax or e-mail on this form), no later than __25 September 2016_midnight_ Ref. No. 2116406Y4276K10002___

ITEM 1:Locally Generated Stock Number

DESCRIPTION: Bow To Stern Grit Removal IAW Statement of Work: Approx 50 Tons from USCGC Flying Fish. The start date is on or about 10/04/16 at 630pm.

The Contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Grit Removal Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order.

Blast grit removal and disposal inside the Bow to Stern Big Top enclosure and onboard CGC Reef Shark to include: the entire concrete ground; the enclosure's steel wheels and wheel track channels; the surfaces, angles and six "feets" of the steel ship lift cradle; dust collector drums; the ship's exterior main deck and Lazarette (2-22-0-E); and the gangway and stair/steps tower to the ship.

Approximately 50 tons (by weight) of grit is to be removed. Contractor must have the capability of removing 15 tons a day. All grit shall be removed regardless of condition; including wet and compacted grit which might require the use of shovels and other removal methods beyond vacuuming.

Period of performance will be from 10/4/16 to 10/13/2016. Work hours will be between 6:30 PM and 7:00 AM. Unless notified directly by the Ship Superintendent, work shall be performed every day, including weekends, regardless of the amount of grit present.

Every night after removal of all sand blasting grit from designated areas, the contactor shall vacuum clean the ground and steel wheel track channels to a "broom swept" condition. "Broom swept" is defined as free of all visible dirt, dust and debris.

Contractor must comply with Statement of Work (attached) for Non-Hazardous grit removal & disposal.

Contractor must include past performance within the last eighteen (18) months in order to be considered. Past performance to include like jobs from both private sector and the U. S. Government.

QUANTITY _1_ Unit of Issue: _JB_ TOTAL PRICE:_____________

REQUESTED PERFORMANCE DATE ON OR ABOUT:_4 OCTOBER 2016__

PROMISED DELIVERY DATE:______________________

THE COAST GUARD INTENDS TO AWARD A FIRM FIXED PRICE CONTRACT

Please complete:

PAYMENT TERMS_____________________________

SMALL BUSINESS___YES __NO

TIN NO:______________________________________________

DUNS NO.: __________________________________ (Must fill in this item at all times)

ACTIVE IN SYSTEM FOR AWARD MANAGEMENT

***REQUIRED FOR AWARD – SEE www.sams.gov ): _______YES ________NO

GSA CONTRACT?___YES __NO CONTRACT NUMBER: ______________________

SERVICE PERFORMED AT:

USCG SURFACE FORCES LOGISTICS CENTER

PIER WITH THE USCGC FLYING FISH

2401 HAWKINS POINT ROAD

BALTIMORE, MD 21226

STATEMENT OF WORK (SOW)

NONHAZARDOUS GRIT REMOVAL AND DISPOSAL

USCGC FLYING FISH

PR 2116406Y4276K10002

SCOPE: The Contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Grit Removal Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order, if no standards are specified then to a commercially reasonable standard.

· Blast grit removal and disposal inside the Bow to Stern Big Top enclosure and onboard CGC FLYING FISH to include: the entire concrete ground; the enclosure’s steel wheels and wheel track channels; the surfaces, angles and six “feets” of the steel ship lift cradle; dust collector drums; the ship’s exterior main deck and Lazarette (2-22-0-E); and the gangway and stair/steps tower to the ship every day.

· Approximately 50 tons (by weight) of grit is to be removed. Contractor must have the capability of removing 15 tons a day. All grit shall be removed regardless of condition; including wet and compacted grit which might require the use of shovels and other removal methods beyond vacuuming.

· Period of performance will be from10/4/16 through 10/13/16. Work hours will be between 6:30 PM and 7:00 AM. Unless notified directly by the Ship Superintendent, work shall be performed every day, including weekends, regardless of the amount of grit present.

· Daily Inspection of work area to be performed by Ship’s Superintendent or his delegate not later than 0700 every morning that work was to be performed. If Ship’s Superintendent arrives before 0700 and vendor is not on site, the daily inspection may be performed before 0700.

· Contactor shall vacuum clean the ground and steel wheel track channels to a “broom swept” condition. “Broom swept” is defined as free of all visible dirt, dust and debris. **See Photos below for examples of unacceptable daily condition.

Disposal and Measurement: The Contractor will provide a weight ticket showing tare weight and gross (loaded) weight from a certified commercial scale approved by the Contracting Officer. Contractor selected disposal sites must be an authorized Non-Hazardous Grit disposal site.

Weight tickets and non-regulated waste manifests shall accompany invoices for each removal. Additionally, a copy of all weight tickets and invoices shall be submitted to the Ship’s Superintendent on the next business day after disposal with the contract number and delivery order number for services clearly marked on the weight ticket and invoices.

Disposal of the sandblast grit shall meet all local, state, and federal standards and regulations, and is to be substantiated by the submittal of a non-regulated waste manifest to the Contracting Officer or the Contract Administrator and additional copy shall be furnished to the Ship’s Superintendent. The Contractor shall be solely responsible for the transportation and proper disposal of the grit. If Contractor elects to use their vacuum box/dumpsters for holding or transportation of grit, they must be fully covered to prevent grit from getting wet or becoming airborne.

The Coast Guard Yard has no control over landfill rates and cannot guarantee either the cost or the availability of disposal sites. The Contractor shall be responsible for locating a primary disposal site.

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Hazardous Materials and Waste: If it comes to the Contractors attention that the coating materials requiring removal are suspected hazardous material and would produce hazardous waste (Code of Maryland Regulations, Title 26, Subtitle 13 and 40 CFR 260-267), the Contractor must cease work immediately and notify the Ship’s Superintendent. If the surface coating being removed contains lead, cadmium, chromium or Polychlorinated Biphenyl or PCB’s, the Contractor will notify the Ship’s Superintendent immediately. The Government will have the responsibility to dispose of any hazardous materials and waste. The Contractor will have the responsibility to provide its full cooperation with the removal and disposal process.

CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the time period and quantity specified.

Nonhazardous Grit Removal and Disposal: The Contractor shall perform all services, management, planning, supervision, personnel, labor, materials, transportation and equipment necessary required by the task order to a commercially reasonable standard and in accordance with this SOW.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:

a. Safety Equipment

b. Trucks – Two trucks are required with two hundred (200) feet of hose for each truck.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements. All equipment must meet the permissible noise limits in accordance with this SOW.

Photos:

image1.jpeg image2.jpeg

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .