Amendment0001.pdf
PDF 150 KB Posted
- Attached to
- YANMAR PARTS CONTRACT Federal contract opportunity
- Solicitation number
- HSCG40-16-Q-53020
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Yanmar_Schedule_of_Supplies-Services_(Rev.2)_.xlsx | XLSX spreadsheet | |
| Amendment0002.pdf | ||
| Yanmar_Schedule_of_Supplies-Services_(Rev.1)_.xlsx | XLSX spreadsheet | |
| HSCG4016Q53020.pdf | ||
| Yanmar_Schedule_of_Supplies-Services_.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 28MAR2016
6. ISSUED BY CODE HSCG40 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
SURFACE FORCES LOGISTICS CENTER
1301 CLAY STREET, SUITE 807N
OAKLAND, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.
X HSCG40-16-Q-53020
9B. DATE (SEE ITEM 11)
04MAR2016
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
YANMAR PARTS
1. The Schedule of Supplies/Services has been updated. Rev.1 is attached and incorporated. All previous revisions are considered obsolete.
2. All other terms and conditions cited in the original solicitation remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG40-16-Q-P30A24
DRY-DOCKING & REPAIR
MLB 47239, Sta. Grays Harbor Amendment 0001
The purpose of this amendment is as follows:
1.) The following Request for Clarification are answered:
WORK ITEM D-16 STANDARD HOSE, RENEWAL
QUESTION: Are we still using the same procedures for the FC-234 & FC-355 Aeroquip Hose, which was reusable hose fittings only and no miss matching of the brands (Aeroquip hose to Aeroquip reusable hose ends only)?
o ANSWER: If the fitting is serviceable, reuse it. If it needs to be renewed, crimp-style fittings are authorized. No mix-and-match of fittings
QUESTION: Are we still using the FC-355 hose for the -20 size only, since they don’t make the FC-234 in -20 size?
o ANSWER: Recommend review of CG Drawing 47B-MLB-505-020, sheet 16
QUESTION: WILL there be a change request if the sizes of the hoses and lengths are incorrect?
o ANSWER: If hoses and lengths are incorrect, please submit a CFR.
QUESTION: Is the FC-234 & FC-355 Aeroquip Hose the only hose that meets the USCG requirements? If not what are the other brands and hose numbers?
o ANSWER: Recommend review of CG Drawing 47B-MLB-505-020. "Hoses and hose fittings shall be qualified for the intended service IAW SAE J-1942-1 'Qualified Hoses for Marine Applications'. The installing activity (contractor) may substitute SAE J1942-1 qualified crimp-style hose fittings and associated hose for assemblies with reusable fittings."
WORK ITEM D-19 SEA STRAINERS – DUPLEX (ALL SIZES), OVERHAUL
QUESTION: Can we use the test procedures that have been called out for on past boats? The test procedure described in the specifications will not work with this style of strainer.
o ANSWER: Rev.1 of specification is attached.
WORK ITEM 20: SEA STRAINERS – SIMPLEX (ALL SIZES), CLEAN AND INSPECT
QUESTION: Can we use the test procedures that have been called out for on past boats? The test procedure described in the specifications will not work with this style of strainer, as there is no plug valve.
o ANSWER: Rev.1 of specification is attached.
WORK ITEM 31: FUEL SENDING UNIT, RENEW
QUESTION: Is the calibration requirement just the adjustment to the swing arm o ANSWER: If adjustment of swing arm shows the gauge on Full when tank is full, then this will meet the requirement.
2.) Revision 1 of the specifications is incorporated into the solicitation. Revision 0 is obsolete.
3.) All other terms and conditions cited in the original solicitation/specifications remain unchanged.
File details come from the government source that posted it. Updated .