REPAIR_DESCRIPTION_MOTOR_HYDRAULICS.pdf
PDF 8 KB Posted
- Attached to
- REPAIR OF MOTOR, HYDRAULIC
- Solicitation number
- HSCG40-16-Q-49067
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPECIFICATIONS_FOR_WOOD_BOXES.pdf | ||
| PACKAGING_ _MARKING.pdf | ||
| SPECS_FOR_OVERHAUL_HYDRAULIC_MOTORS.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME MOTOR,HYDRAULIC
STOCK NUMBER 4320-01-445-2248
PART NUMBER HMB4.0A-A04-A01-038
USED ON
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Open, inspect, report, overhaul, preserve, package, mark, and bar code Hydraulic Winch Motor in accordance with attached SFLC specification R-573- 2020.
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
4320-01-445-2248
MOTOR,HYDRAULIC
HMB4.0A-A04-A01-038
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
MACTAGGART SCOTT & CO LTD
HUNTER AVENUE
P.O. BOX 1
LOANHEAD, MIDLOTHIAN EH20 9SP
UNITED KINGDOM PH:0131 440 0311
757-288-1405
WRITTEN BY:
DATE :
MATTHEW TURNER
19 OCT 15
Cost Estimate for Overhaul NOT TO EXCEED:
File details come from the government source that posted it. Updated .