RD_01-F12-2745_Appleton_Jib_Cylinder.pdf

PDF 8 KB Posted

Attached to
Appleton JIB Cylinder
Solicitation number
HSCG40-16-Q-49050
Issued by

View the file

Other files

File Type Posted
tech_pub_3363 _Jib_Drawing.jpg JPG image
Hydraulic_Cylinder_Spec.docx DOCX document
RD_01-F12-2745_Appleton_Jib_Cylinder.pdf PDF
ASTM_D6880.pdf PDF
Hydraulic_Cylinder_Spec.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME APPLETON JIB CYLINDER

STOCK NUMBER 3040-01-F12-2745

PART NUMBER YMD-4433

USED ON WLR 75

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

OPEN, INSPECT, REPORT AND OVERHAUL IAW HYDRAULIC CYLINDER SPECIFICATION.

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

FOR OFFICIAL USE ONLY

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

3040-01-F12-2745

APPLETON JIB CYLINDER

YMD-4433

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

AIRLINE HYDRAULICS CORP

3557 PROGRESS DRIVE, P.O. BOX 8505

BENSALEM, PA 19020-8505

215-638-4700 EXT 2130

AFITZGERALD@AIRLINEHYD.COM

BALTIMORE HYDRAULICS INC

708 E 25TH ST

BALTIMORE, MD 21218-5436

ADVANCED FLUID SYSTEMS, INC.

P. O. BOX 620

899-C AIRPORT PARK ROAD

GLEN BURNIE, MD 21061

410-553-0300 800-220-1013

WRITTEN BY:

DATE :

ALVIN WEBB

30 DEC 15

Cost Estimate for Overhaul NOT TO EXCEED:

File details come from the government source that posted it. Updated .