Attachment_5_SCHEDULE_OF_SUPPLIES_SERVICES.xls
XLS spreadsheet 38 KB Posted
- Attached to
- 87' Propulsion Shaft Manufacture and Repair
- Solicitation number
- HSCG40-15-R-19008
About this file
Attachment 5 - Schedule of Supplies/Services
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 87'_SHAFT_HSCG40-15-R-19008_V1.doc | DOC document | |
| Attachment_1_Specification_Propulsion_Shaft_Purchase_and_Repair.docx | DOCX document | |
| Attachement_2_Bar_Coding_for_US_Coast_Guard_Surface_Forces_Logistics_Center_Material.doc | DOC document | |
| Attachment_3_REPORT_OF_GOVERNMENT_FURNISHED_PROPERTY_DISCREPANCY.doc | DOC document | |
| Attachment_4_DHS_700-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| BASE YEAR | |||||
| *Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years. | |||||
| ITEM | DESCRIPTION | HOURLY LABOR RATE | UNIT PRICE | EST QTY | BASE YEAR EXTENDED PRICE |
| (multiply estimated labor hours x hourly rate) = Unit Price | |||||
| CLIN 0001 | Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with specification P-243-0618, section 3.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 0002 | For Approval, Certifications of material conformance. | NSP | $ NSP | 15 | $ NSP |
| CLIN 0003 | For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with specification P-243-0618 section 3.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 0004 | Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with specification P-243-0618 section 3.2.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 0005 | (Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 0006 | (Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 0007 | (Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 0008 | (Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 0009 | Cost to blue fit, package, pack, mark, bar-code and ship to Baltimore, MD refurbished propulsion shafts in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 0010 | (Optional) Cost to manufacture (1) propeller end and (1) coupling end key per specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 0011 | For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with specification P-243-0618. | NSP | $ NSP | 30 | $ NSP |
| $ NSP | |||||
| CLIN 0012 | (Optional) Cost to manufacture a new shipping crate as required in accordance with specification P-243-0618 section 5.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| Total Estimated Amount | $ |
1ST OPTION YEAR
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| FIRST OPTION YEAR | |||||
| *Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years. | |||||
| ITEM | DESCRIPTION | HOURLY LABOR RATE | UNIT PRICE | EST QTY | BASE YEAR EXTENDED PRICE |
| (multiply estimated labor hours x hourly rate) = Unit Price | |||||
| CLIN 1001 | Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with specification P-243-0618, section 3.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 1002 | For Approval, Certifications of material conformance. | NSP | $ NSP | 15 | $ NSP |
| CLIN 1003 | For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with specification P-243-0618 section 3.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 1004 | Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with specification P-243-0618 section 3.2.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 1005 | (Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 1006 | (Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 1007 | (Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 1008 | (Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 1009 | Cost to blue fit, package, pack, mark, bar-code and ship to Baltimore, MD refurbished propulsion shafts in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 1010 | (Optional) Cost to manufacture (1) propeller end and (1) coupling end key per specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 1011 | For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with specification P-243-0618. | NSP | $ NSP | 30 | $ NSP |
| $ NSP | |||||
| CLIN 1012 | (Optional) Cost to manufacture a new shipping crate as required in accordance with specification P-243-0618 section 5.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| Total Estimated Amount | $ |
2ND OPTION YEAR
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| SECOND OPTION YEAR | |||||
| *Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years. | |||||
| ITEM | DESCRIPTION | HOURLY LABOR RATE | UNIT PRICE | EST QTY | BASE YEAR EXTENDED PRICE |
| (multiply estimated labor hours x hourly rate) = Unit Price | |||||
| CLIN 2001 | Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with specification P-243-0618, section 3.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 2002 | For Approval, Certifications of material conformance. | NSP | $ NSP | 15 | $ NSP |
| CLIN 2003 | For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with specification P-243-0618 section 3.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 2004 | Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with specification P-243-0618 section 3.2.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 2005 | (Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 2006 | (Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 2007 | (Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 2008 | (Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 2009 | Cost to blue fit, package, pack, mark, bar-code and ship to Baltimore, MD refurbished propulsion shafts in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 2010 | (Optional) Cost to manufacture (1) propeller end and (1) coupling end key per specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 2011 | For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with specification P-243-0618. | NSP | $ NSP | 30 | $ NSP |
| $ NSP | |||||
| CLIN 2012 | (Optional) Cost to manufacture a new shipping crate as required in accordance with specification P-243-0618 section 5.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| Total Estimated Amount | $ - 0 |
3RD OPTION YEAR
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| THIRD OTPION YEAR | |||||
| *Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years. | |||||
| ITEM | DESCRIPTION | HOURLY LABOR RATE | UNIT PRICE | EST QTY | BASE YEAR EXTENDED PRICE |
| (multiply estimated labor hours x hourly rate) = Unit Price | |||||
| CLIN 3001 | Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with specification P-243-0618, section 3.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 3002 | For Approval, Certifications of material conformance. | NSP | $ NSP | 15 | $ NSP |
| CLIN 3003 | For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with specification P-243-0618 section 3.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 3004 | Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with specification P-243-0618 section 3.2.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 3005 | (Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 3006 | (Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 3007 | (Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 3008 | (Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 3009 | Cost to blue fit, package, pack, mark, bar-code and ship to Baltimore, MD refurbished propulsion shafts in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 3010 | (Optional) Cost to manufacture (1) propeller end and (1) coupling end key per specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 3011 | For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with specification P-243-0618. | NSP | $ NSP | 30 | $ NSP |
| $ NSP | |||||
| CLIN 3012 | (Optional) Cost to manufacture a new shipping crate as required in accordance with specification P-243-0618 section 5.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| Total Estimated Amount | $ |
4TH OPTION YEAR
| SUPPLIES/SERVICES AND PRICES/COSTS FOR: | |||||
| FOURTH OPTION YEAR | |||||
| *Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years. | |||||
| ITEM | DESCRIPTION | HOURLY LABOR RATE | UNIT PRICE | EST QTY | BASE YEAR EXTENDED PRICE |
| (multiply estimated labor hours x hourly rate) = Unit Price | |||||
| CLIN 4001 | Manufacture new propulsion shafts which include material certifications, keys, new shipping container, QA inspection, PP&M and shipping to Baltimore, MD in accordance with specification P-243-0618, section 3.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 4002 | For Approval, Certifications of material conformance. | NSP | $ NSP | 15 | $ NSP |
| CLIN 4003 | For Approval, Condition Found Report, Inspection, and Cost Estimate for shaft and shipping crate repair in accordance with specification P-243-0618 section 3.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 4004 | Cost to package, pack, mark and deliver to Baltimore, MD any shaft not being repaired in accordance with specification P-243-0618 section 3.2.2. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 4005 | (Optional) Cost - Weld Repairs: General (non-bearing areas) - 3 cubic inch increment (based on 1/8" deep areas to repair, 1" length, 360° undercut as required by MILSPEC). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 4006 | (Optional) Cost - Weld Repairs: Aft bearing repair (entire area) - 18 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 4007 | (Optional) Cost - Weld Repairs: Intermediate bearing repair (entire area) - 12 cubic inch increment (based on 1/16" deep area to repair, full bearing length, 360° around). | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 4008 | (Optional) Cold Straightening: Cost estimate (CFR) to cold straighten shafts as necessary in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| CLIN 4009 | Cost to blue fit, package, pack, mark, bar-code and ship to Baltimore, MD refurbished propulsion shafts in accordance with specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 4010 | (Optional) Cost to manufacture (1) propeller end and (1) coupling end key per specification P-243-0618. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 15 | $ - 0 | |
| CLIN 4011 | For Approval, Final inspection and test report for each manufactured or repaired propulsion shaft in accordance with specification P-243-0618. | NSP | $ NSP | 30 | $ NSP |
| $ NSP | |||||
| CLIN 4012 | (Optional) Cost to manufacture a new shipping crate as required in accordance with specification P-243-0618 section 5.1. | Number of hours ____ X Loaded Shop Rate $_____ = Unit Price | 1 | $ - 0 | |
| Total Estimated Amount | $ |
TOTAL ALL
| Total Contract Value |
| $ - 0 |
File details come from the government source that posted it. Updated .