Amendment0001.pdf

PDF 66 KB Posted

Attached to
MLB 47295: FY15 DRYDOCKING & REPAIR, STA. CHETCO RIVER
Solicitation number
HSCG40-15-Q-P30B18
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
47295_FY15_DD_Rev-1.pdf PDF
47295_CLIN_Rev-1.pdf PDF
HSCG4015QP30B18.pdf PDF
47295_FY15_DD_Rev-0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 17JUL2015 2115405P300518

6. ISSUED BY CODE HSCG40 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER, USCG

SURFACE FORCES LOGISTICS CENTER

1301 CLAY STREET, SUITE 807N

OAKLAND, CA 94612

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.

X HSCG40-15-Q-P30B18

9B. DATE (SEE ITEM 11)

23JUN2015

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

DRY-DOCKING AND REPAIRS: MLB 47295, STATION CHETCO RIVER

SEE PAGE 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

HSCG40-15-Q-P30B18

DRY-DOCKING & REPAIR

MLB 47295, STA CHETCO RIVER

Amendment 0001

The purpose of this amendment is as follows:

1.) The following Request for Clarification is answered:

WORK ITEM D-4 Bulkhead Penetrations, Frame 5, Inspect

QUESTION: Are contractors to provide provide all fittings, such as those in the picture, or just inspect and then do a change request? Also are these the only fittings to be renewed?

o ANSWER: Renew all salt water thru-bulkhead fittings. Inspections will reveal if any other fitting will require renewal, which will be handled via CFR.

2.) Rev.1 of the specification, dated 09 JUL 2015, is incorporated into the solicitation. All previous revisions are obsolete.

3.) A corrected Schedule of Items is attached, titled 47295 CLIN Rev-1

4.) The due date for quotes is changed from 23 JUL 2015 to 28 JUL 2015.

5.) All other terms and conditions cited in the original solicitation/specifications remain unchanged.