HSCG40-14-R-AG035_PROPELLER_FINAL_07-03-2014.pdf

PDF 396 KB Posted

Attached to
Overhaul and Remanufacture of Various Monobloc Propellers and Controllable Pitch Propeller Blade Sets
Solicitation number
HSCG40-14-R-AG035
Issued by

About this file

Request for Proposal

View the file

Other files

File Type Posted
Questions_and_Answers_07-17-2014.pdf PDF
SF_1424.pdf PDF
P-245-0150.doc DOC document
D-000-0100.doc DOC document
P-245-0146.doc DOC document
R-245-0122.doc DOC document
R-245-0121.doc DOC document
P-245-0135.docx DOCX document
R-245-0074.doc DOC document
R-245-0503.doc DOC document
P-245-2003.doc DOC document
R-245-0128.doc DOC document
P-245-0612.docx DOCX document
P-245-0029.doc DOC document
P-245-0339.doc DOC document
Government_Furnished_Property_Discrepancy_Report.doc DOC document
R-245-0127.doc DOC document
R-245-0076.docx DOCX document
P-245-0489.doc DOC document
R-245-0071.doc DOC document
R-245-0469.doc DOC document
R-245-0647.doc DOC document
DHS_Form_700-5.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 3/2011) PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2114404B4500AG035

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

HSCG40-14-R-AG035

6. SOLICITATION

ISSUE DATE

07/03/14

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Martine Duvall

b. TELEPHONE NUMBER (no collect calls)

410-762-6207

8. OFFER DUE DATE/

LOCAL TIME

08/18/14

9. ISSUED BY CODE 75174

Commanding Officer USCG Surface Forces Logistics Center Attn: Martine Duvall Contracting & Procurement Division 1 705 E Ordnance Road Baltimore, MD 21226-5000

Martine.M.Duvall@uscg.mil

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: %FOR:

SMALL BUSINESS WOMEN-OWNED SMALL

BUSINESS (WOSB)

HUBZONE SMALL NAICS: 331529

BUSINESS ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED SIZE STANDARD:

SMALL BUSINESS 8(A) 500

11. DELIVERY FOR FOB

DESTINATION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT

TERMS

13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

See Description of Supplies/Services

16. ADMINISTERED BY CODE

Same as block 9

17a. CONTRACTOR/ CAGE CODE FACILITY

OFFEROR CODE

DUNS No.

TELEPHONE NO:

FAX NO:

18a. PAYMENT WILL BE MADE BY CODE

U.S. Coast Guard Yard P.O. Box 4122 Chesapeake, VA 23327-4122

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

This solicitation is for the overhaul and remanufacture of Monobloc Propellers and Controllable Pitch Propeller blade sets for the Medium Endurance Cutter Product Line, Patrol Boat Product Line, Long Range Enforcer Product Line, and Icebreaker, Buoy Construction Tender Product Line.

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO

FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REFERENCE

OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER

31c. DATE SIGNED

TABLE OF CONTENTS

DESCRIPTION: PAGE(S)

Standard Form 1449 (SF1449) 1

Table of Contents 2-3 Addendum to Standard Form 1449:

Blocks 19 – 26, Schedule of Supplies/Services 4-143 Block 15, Deliveries, Packaging and Marking 144-147 Contract Administration Data 148-150 Special Contract Requirements 151-152

Addendum to FAR Clause 52.212-4, Contract Terms and Conditions – Commercial Items 153-160

FAR Clause 52.212-5, Contract Terms and Conditions Required to Implement

Statutes or Executive Orders – Commercial Items 161-168

Addendum to FAR Clause 52.212-1, Instructions to Offerors – 169-175

Commercial Items

FAR Clause 52.212-3 – Offeror Representations and Certifications – 176-193

Commercial Items

ATTACHMENTS:

Attachment # Document Title

1 Specification Number R-245-0647, Propeller Repair Specification for 65’ WLR/WYTL and 75’ WLIC/WLR Vessel Classes

2 Specification Number R-245-0503, Propeller Repair Specification for 87’ Class WPB Patrol Boats

3 Specification Number R-245-0076, Rev N, PROPELLER REPAIR

SPECIFICATION FOR 110' WPB PATROL BOATS

4 Specification Number R-245-0071, Propeller Repair Specification for 160’ WLIC Construction Tender Vessels

5 175 WLM Propeller Repair Specification R-245-0469, 06/2009, PROPELLER REPAIR SPEC FOR 175' WLB

6 Repair Specification Number R-245-0127, 210’ A, Propeller Blade

7 Specification Number R-245-0074, Propeller Repair Specification for 210 B Class WMEC Vessels

8 Specification Number R-245-0128, 270' PROPELLER BLADE

9 Specification Number R-245-0121, 378’ PROP BLADE, ESCHER WEISS

Specification Number R-245-0122, dated 3/93 Rev. E, Dated, 1/15/07, Entitled Propeller Repair Specification for blades used on 378’ Class WHEC vessels hulls 715-718.

11 Specification Number D-000-0100, Bar Coding for U.S. Coast Guard Engineering Logistics Center Material, revision G, Dated 2/23/06.

12 SF-1424 Inventory Disposal Report

13 PROPELLER PURCHASE, UP TO 56" DIA VARIOUS, P-245-0146

14 Specification Number P-245-0489, 87 WPB PROPELLER PURCHASE

SPECIFICATION

15 Specification Number P-245-0612, PURCHASE SPEC FOR

PROPELLERS USED ON 110' WPB PATROL BOATS

16 160' WLIC PROPELLER PURCHASE SPECIFICATION, P-245-0339

17 PURCHASE SPECIFICATION FOR PROPELLERS USED ON 175 FT

WLM BUOY TENDER , P-245-2003

18 210 A-Class Propeller Blade Set Purchase Specification P-245-0150

19 210 B-Class Propeller Blade Set Purchase Specification P-245-0029

20 270 WMEC Propeller Blade Set Purchase Specification P-245-0135

21 Government Furnished Property Discrepancy Report

22 DHS Form 700-05 Contractor Report of Government Property

23 Past Performance Questionnaire

Addendum to Blocks 19 through 26 Schedule of Supplies and Services

TYPE OF CONTRACT

This is an Indefinite Delivery, Indefinite Quantity (IDIQ)-Type Contract with one Base Year and Four Option Years, if exercised. An Indefinite Quantity Type Contract is defined in FAR Clause 52.216.22 (Oct 1995).

PERIOD OF PERFORMANCE

The base contract shall be for one year after award of contract, with the Government reserving the option to extend for four one year option years.

FUNDING

Each delivery order will be individually funded.

ORDERING

a. Supplies and services will be ordered by the issuance of individual delivery orders. Refer to FAR Clause 52.216-18 Ordering, page 157.

b. Any supplies or services to be furnished under this contract shall be ordered by issuance of delivery orders by the following activities:

a. U.S. Coast Guard – Surface Forces Logistics Center WMEC Product Line, C&P1 705 E. Ordnance Road Baltimore, MD 21226

b. U.S. Coast Guard, Surface Forces Logistics Center WMEC Product Line, C&P1 300 E. Main Street Norfolk, VA 23510

OPTIONS

Each Option, if exercised, extending the term of this Contract shall be for a period of one year from the effective date of each Option and shall be issued in accordance with FAR 52.217-9 (Mar 2000).

QUANTITIES

The government anticipates the overhaul of Monobloc propellers and Controllable Pitch Propeller (CPP) blade sets according to the following estimates:

CONTRACT MAXIMUM/MINIMUM

Total Minimum Guarantee Amount: $13,397.00 per awardee

This contract will obligate the minimum guarantee in the amount of $13,397.00; the $13,397.00 will be de-obligated off of the contract, via a unilateral contract modification, when the total minimum guarantee is satisfied through the award of delivery orders. If the entire minimum guarantee amount is not satisfied through the award of delivery orders during the contract period of performance, then the remaining amount of the

DESC NSN

EST

QTY

BASE

YR

1ST

OPT

YR

2ND

OPT

YR

3RD

OPT

YR

4TH

OPT

YR

65’WYTL 2010-01-482-6153 1 1 1 1 1

65’ A/B Class, RH 2010-01-501-5749 1 1 1 1 1 65’ A/B Class, LH 2010-01-501-5755 1 1 1 1 1

65-75 WLR/WLIC, LH 2010-01-534-9095 1 1 1 1 1

65-75 WLR/WLIC, RH 2010-01-534-9089 1 1 1 1 1

75’ C/E Class, RH 2010-01-501-5504 1 1 1 1 1

75’ WLR, LH 2010-01-501-5506 1 1 1 1 1

75’ F-Class, RH 2010-01-501-5459 1 1 1 1 1 75’ F-Class, LH 2010-01-501-5465 1 1 1 1 1

87’ WPB, LH 2010-01-459-0421 4 4 4 4 4

87’ WPB, RH 2010-01-457-0573 5 5 5 5 5

110’ WPB, LH 2010-01-222-2440 15 4 4 4 4

110’ WPB, RH 2010-01-222-2441 15 4 4 4 4

160’ WLIC, RH 2010-01-037-7295 1 1 1 1 1

160’ WLIC, LH 2010-01-036-7597 1 1 1 1 1

175’ WLM, RH 2010-01-413-7146 1 1 1 1 1

175’ WLM, LH 2010-01-413-8557 1 1 1 1 1

210’ A, Blade Set, LH 2010-00-906-6010 1 1 1 1 1 210’ A, Blade Set, RH 2010-00-906-6009 1 1 1 1 1 210’ B, Blade Set, RH 2010-01-134-7238 1 1 1 1 1 210’ B, Blade Set, LH 2010-01-134-0378 1 1 1 1 1

270’ Blade Set, LH 2010-01-120-2871 1 2 1 2 1 270’ Blade Set, RH 2010-01-119-3972 1 2 1 2 1

378’ Blade Set (EW, LH) 2010-12-193-4771 1 1 1 1 1 378’ Blade Set (EW, RH) 2010-12-193-4772 1 1 1 1 1 378’ Blade Set (PSI, LH) 2010-01-133-7612 1 1 1 1 1 378’ Blade Set (PSI, RH) 2010-01-139-1063 1 1 1 1 1 minimum guarantee shall be paid to the Contractor via a delivery order at the end of the contract period of performance. If no delivery orders are ever awarded during the contract period of performance then the total minimum guarantee amount shall be paid to the Contractor in full at the end of the contract period of performance via a delivery order.

Note: If the contract is Terminated for Cause, the minimum guarantee or the remainder of the minimum guarantee shall not be paid to the Contractor as stated above.

Total Not-To-Exceed Contract Ceiling: $10,007,675.23 All delivery orders issued pursuant to this contract shall not exceed the Not-To-Exceed Contract Ceiling. The contract will remain in place and delivery orders may be issued in accordance with the contract until the Not-To-Exceed Contract Ceiling has been used in its entirety or until the contract period of performance ends, whichever occurs first.

SUBMISSION OF OFFERS

Proposals will be accepted via surface delivery and email Proposals submitted via facsimile will not be accepted. Proposals may be sent via email to Martine.M.Duvall@uscg.mil; include HSCG40-14-R-AG035 in the Subject line.

Contractors are responsible for verifying the receipt of their proposals. The SF-1449 MUST be completed (Block 17a) and signed by the Offeror.

Address for Surface Delivery:

USCG Surface Forces Logistics Center Attn: Martine Duvall WMEC Product Line (C&P1) 705 East Ordnance Road Baltimore, MD 21226

QUESTIONS

The last day to ask questions regarding this solicitation is 15 days prior to the closing date. After this date, additional questions may not be accepted due to time constraints.

Questions that create necessary changes to the specifications will be addressed regardless of the date they were received. A determination will be made regarding whether the change requires an extension to the solicitation closing date and deadline for questions.

Schedule of Services/Supplies The following requirements shall apply to all contract line items, including the base and option years. Specifications and drawings will be provided under each Contract Line Item Number (CLIN) as applicable.

0001 Through 4027 Open/Inspect/Report (OIR) - In accordance with the specification, the Contractor shall provide all necessary equipment and labor, at a loaded composite hourly rate including profit, G&A and overhead, required to perform an inspection on each item inducted for overhaul. The Contractor shall inspect the condition of the shipping container, uncrate the propeller, prepare and submit the Pre-Repair Inspection Report for approval. The inspection report shall be detailed, report the findings and include the associated costs to repair the item, i.e. labor hours and materials. The Contractor shall not proceed with a repair until written authorization is received from the Contracting Officer.

0001A Through 4027A Prepare for shipment, re-crate and return any propeller that is determined by the Contracting Officer to be Beyond Economical Repair (BER). No repair costs or scrap credit shall be included.

Any propeller or blade set determined to be BER may be authorized by the Contracting Officer for scrapping at the contractor’s facility and a scrap credit shall be negotiated in accordance with the current price of metals. The credit shall be applied to another asset under the same delivery order or a subsequent delivery order.

The contractor shall complete and submit a SF-1424 (Attachment 12) within 10 calendar days of authorization to scrap the material.

0001B Through 4027B In accordance with the specification, the Contractor shall provide all necessary equipment and labor at a loaded composite hourly rate, including profit, G&A and overhead, to arrive at a total price to overhaul, test, prepare and submit a Final Inspection Report, preserve, package, mark and deliver each propeller in accordance with the attached specification.

The number of labor hours included in this solicitation is for evaluation purposes only and is the Government’s estimate of the average number of hours expected for each overhaul. This number will vary based on the condition of the asset and shall be negotiated on an individual basis after receipt of the Pre-Repair Inspection Reports.

0001C Through 4027C In accordance with the specification, the contractor shall provide all materials required to overhaul, test, prepare and submit a Final Inspection Report, preserve, package, mark and deliver each propeller in accordance with the attached specification.

This cost is for evaluation purposes only and the total cost of materials shall be negotiated on an individual basis after receipt of the Pre-Repair Inspection Report but shall not, regardless of condition, exceed the amount proposed.

0001D Through 4027D Replace shipping container if determined necessary based on condition.

0001E Through 4023E In accordance with the specification, recycle the inducted propeller and remanufacture a new propeller. This cost shall include submission of the Final Inspection Report, preservation, packaging, marking, and delivery.

0028-4028 Monthly Status Report: A monthly status report shall be submitted via email to the Contract Administrator and the Contracting Officer’s Representative and shall contain the following information:

a. Task Order number

b. National Stock Number (NSN)

c. Date propeller or blade received

d. Date Open/Inspect Report sent

e. Repair or manufacture status

f. Date of Quality Assurance final inspection

g. Delivery date

h. Comments/remarks

BASE YEAR

NSN 2010-01-482-6135, Propeller, 65’ WYTL, Specification R-245-0647, Propeller Repair Specification for 65’ WLR/WYTL and 75’ WLIC/WLR Vessel Classes, Attachment 1.

0001 EST. NO.

OF HOURS

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

_________ X __________ = ________ X 1 = $_________

0001A

EST. NO.

/UNITS

TOTAL

PRICE

Beyond Economical Repair (BER) 1 = $_________

0001B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

101 X __________ = ________ X 1 = $_________

0001C

TOTAL

Cost of Materials, Not to Exceed X 1 = $_________

0001D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0001E

Propeller, 65’ WYTL, Specification P-245- 0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

Recycle and Remanufacture 1 = $____________

NSN 2010-01-501-5749, Propeller, 65’ A/B Class RH, Specification R-245-0647, Propeller Repair Specification for 65’ WLR/WYTL and 75’ WLIC/WLR Vessel Classes, 0002 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0002A

TOTAL

0002B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0002C

TOTAL

0002D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0002E

Propeller, 65’ A/B Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

NSN 2010-01-501-5755, Propeller, 65’ A/B Class LH, Specification R-245-0647, 0003 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0003A

TOTAL

0003B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0003C

TOTAL

0003D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0003E

Propeller, 65’ A/B Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

NSN 2010-01-534-9095, Propeller, 65’-75’ WLIC LH, Specification R-245-0647, 0004 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0004A

TOTAL

0004B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0004C

TOTAL

0004D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0004E

Propeller, 65’-75’ WLIC LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

NSN 2010-01-534-9089, Propeller, 65’-75’ WLR/WLIC RH, Specification R-245-0647, 0005 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0005A

TOTAL

0005B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0005C

TOTAL

0005D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0005E

Propeller, 65’-75’ WLIC RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

NSN 2010-01-501-5504, Propeller, 75’ C/E Class RH, Specification R-245-0647, 0006 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0006A

TOTAL

0006B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0006C

TOTAL

0006D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0006E

Propeller, 75’ C/E Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2010-01-501-5506, Propeller, 75’ C/E Class LH, Specification R-245-0647, Propeller

0007 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0007A

TOTAL

0007B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0007C

TOTAL

0007D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0007E

Propeller, 75’ C/E Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2010-01-501-5459, Propeller, 75’ F Class RH, Specification R-245-0647, Propeller

0008 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0008A

TOTAL

0008B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0008C

TOTAL

0008D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0008E

Propeller, 75’ F Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2010-01-501-5456, Propeller, 75’ F Class LH, Specification R-245-0647, Propeller

0009 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0009A

TOTAL

0009B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0009C

TOTAL

0009D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0009E

Propeller, 75’ F Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2010-01-459-0421, Propeller, 87’ WPB LH, Specification R-245-0503, Propeller Repair Specification for 87’ Class WPB Patrol Boats, Attachment 2.

0010 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0010A

TOTAL

0010B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

204 X __________ = ________ X 1 = $_________

0010C

TOTAL

0010D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0010E

Propeller, 87’ WPB LH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

2010-01-459-0573, Propeller, 87’ WPB RH, Specification R-245-0503, Propeller Repair

0011 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0011A

TOTAL

0011B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0011C

TOTAL

0011D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0011E

Propeller, 87’ WPB RH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

2010-01-222-2440, Propeller, 110’ WPB LH, Specification R-245-0076, Rev N, PROPELLER REPAIR SPECIFICATION FOR 110' WPB PATROL BOATS, Attachment 3.

0012 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0012A

TOTAL

0012B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0012C

TOTAL

0012D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

0012E

Propeller, 110’ WPB LH, Specification P- 245-0612, Attachment 15.

EST. NO.

/UNITS

TOTAL

2010-01-222-2441, Propeller, 110’ WPB RH, Specification R-245-0076, Rev N, 0013 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0013A

TOTAL

0013B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0013C

TOTAL

0013D

TOTAL

PRICE

0013E

Propeller, 110’ WPB RH, Specification P-

EST. NO.

/UNITS

TOTAL

2010-01-037-7295, Propeller, 160’ WLIC RH, Specification R-245-0071, Propeller Repair Specification for 160’ WLIC Construction Tender Vessels, Attachment 4.

0014 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0014A

TOTAL

0014B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

350 X __________ = ________ X 1 = $_________

0014C

TOTAL

0014D

TOTAL

PRICE

0014E

Propeller, 160’ WLIC RH, Specification P- 245-0339, Attachment 16.

EST. NO.

/UNITS

TOTAL

2010-01-036-7597, Propeller, 160’ WLIC LH, Specification R-245-0071, Propeller Repair Specification for 160’ WLIC Construction Tender Vessels Attachment 4.

0015 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0015A

TOTAL

0015B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

330 X __________ = ________ X 1 = $_________

0015C

TOTAL

0015D

TOTAL

PRICE

0015E

Propeller, 160’ WLIC LH, Specification P-

EST. NO.

/UNITS

TOTAL

2010-01-413-7146, Propeller, WLM-175’ RH, Repair Specification R-245-0469, PROPELLER REPAIR SPEC FOR 175' WLB, Attachment 5.

0016 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0016A

TOTAL

0016B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0016C

TOTAL

0016D

TOTAL

PRICE

0016E

Propeller, WLM-175’ RH, Specification P- 245-2003, Attachment 17.

EST. NO.

/UNITS

TOTAL

2010-01-413-8557, Propeller, WLM-175’ LH, Repair Specification R-245-0469, 0017 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0017A

TOTAL

0017B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0017C

TOTAL

0017D

TOTAL

PRICE

0017E

Propeller, WLM-175’ LH, Specification P-

EST. NO.

/UNITS

TOTAL

2010-00-906-6010, CPP Blade Set, 210’ A Class WMEC LH, Specification R-245-0127, 210’ A, Propeller Blade, Attachment 6.

0018 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0018A

TOTAL

0018B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

700 X __________ = ________ X 1 = $_________

0018C

TOTAL

0018D

TOTAL

PRICE

0018E

CPP Blade Set, 210’ A Class WMEC LH, Specification P-245-0150, Attachment 18.

EST. NO.

/UNITS

TOTAL

2010-00-906-6009, CPP Blade Set, 210’ A Class WMEC RH, Specification R-245-0127, 0019 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0019A

TOTAL

0019B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0019C

TOTAL

0019D

TOTAL

PRICE

0019E

CPP Blade Set, 210’ A Class WMEC RH, EST. NO.

/UNITS

TOTAL

2010-01-134-7238, CPP Blade Set, 210’ B Class WMEC RH, Specification R-245-0074, Propeller Repair Specification for 210 B Class WMEC Vessels, Attachment 7.

0020 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0020A

TOTAL

0020B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

760 X __________ = ________ X 1 = $_________

0020C

TOTAL

0020D

TOTAL

PRICE

0020E

CPP Blade Set, 210’ B Class WMEC RH, Specification P-245-0029, Attachment 19.

EST. NO.

/UNITS

TOTAL

2010-01-134-0378, CPP Blade Set, 210’ B Class WMEC LH, Specification R-245-0074, Propeller Repair Specification for 210’ B Class WMEC Vessels, Attachment 7.

0021 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0021A

TOTAL

0021B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

800 X __________ = ________ X 1 = $_________

0021C

TOTAL

0021D

TOTAL

PRICE

0021E

CPP Blade Set, 210’ B Class WMEC LH, EST. NO.

/UNITS

TOTAL

2010-01-120-2871, CPP Blade Set, 270’ WMEC LH, Specification R-245-0128, 270' PROPELLER BLADE, Attachment 8.

0022 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0022A

TOTAL

0022B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

709 X __________ = ________ X 1 = $_________

0022C

TOTAL

0022D

TOTAL

PRICE

0022E

CPP Blade Set, 270’ WMEC LH, Specification P-245-0135, Attachment 20.

EST. NO.

/UNITS

TOTAL

2010-01-119-3972, CPP Blade Set, 270’ WMEC RH, Specification R-245-0128, 270'

0023 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0023A

TOTAL

0023B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

677 X __________ = ________ X 1 = $_________

0023C

TOTAL

0023D

TOTAL

PRICE

0023E

CPP Blade Set, 270’ WMEC RH, EST. NO.

/UNITS

TOTAL

2010-12-193-4771, CPP Blade Set, 378’ WHEC LH, Specification R-245-0121, 378’ PROP BLADE, ESCHER WEISS, Attachment 9.

0024 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0024A

TOTAL

0024B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

913 X __________ = ________ X 1 = $_________

0024C

TOTAL

0024D

TOTAL

2010-12-193-4772, CPP Blade Set, 378’ WHEC RH, Specification R-245-0121, 378’ PROP BLADE, ESCHER WEISS Attachment 9.

0025 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0025A

TOTAL

0025B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

813 X __________ = ________ X 1 = $_________

0025C

TOTAL

0025D

TOTAL

2010-01-133-7612, CPP Blade Set, 378’ WHEC LH, Specification Number R-245-0122, Rev. E, Entitled Propeller Repair Specification for blades used on 378’ Class WHEC vessels hulls 715-718, Attachment 10.

0026 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0026A

TOTAL

0026B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0026C

TOTAL

0026D

TOTAL

2010-01-139-1063, CPP Blade Set, 378’ WHEC RH, Specification R-245-0122, Rev. E, Propeller Repair Specification for blades used on 378’ Class WHEC vessels hulls 715- 718, Attachment 10.

0027 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0027A

TOTAL

0027B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

0027C

TOTAL

0027D

TOTAL

0028 Monthly Status Report Not Separately Priced

0029 DHS 700-05 Contractor Report of Government

Property (Attachment 22) Not Separately Priced

BASE YEAR TOTAL $_________________

FIRST OPTION YEAR

1001 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1001A

TOTAL

1001B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1001C

TOTAL

1001D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1001E

Propeller, 65’ WYTL, Specification P-245- 0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1002 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1002A

TOTAL

1002B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1002C

TOTAL

1002D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1002E

Propeller, 65’ A/B Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1003 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1003A

TOTAL

1003B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1003C

TOTAL

1003D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1003E

Propeller, 65’ A/B Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1004 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1004A

TOTAL

1004B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1004C

TOTAL

1004D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1004E

Propeller, 65’-75’ WLIC LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1005 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1005A

TOTAL

1005B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1005C

TOTAL

1005D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1005E

Propeller, 65’-75’ WLIC RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1006 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1006A

TOTAL

1006B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1006C

TOTAL

1006D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1006E

Propeller, 75’ C/E Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1007 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1007A

TOTAL

1007B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1007C

TOTAL

1007D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1007E

Propeller, 75’ C/E Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1008 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1008A

TOTAL

1008B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1008C

TOTAL

1008D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1008E

Propeller, 75’ F Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1009 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1009A

TOTAL

1009B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1009C

TOTAL

1009D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1009E

Propeller, 75’ F Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

1010 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1010A

TOTAL

1010B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1010C

TOTAL

1010D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1010E

Propeller, 87’ WPB LH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

1011 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1011A

TOTAL

1011B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1011C

TOTAL

1011D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

1011E

Propeller, 87’ WPB RH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

1012 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1012A

TOTAL

1012B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1012C

TOTAL

1012D

TOTAL

PRICE

1012E

EST. NO.

/UNITS

TOTAL

1013 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1013A

TOTAL

1013B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1013C

TOTAL

1013D

TOTAL

PRICE

1013E

EST. NO.

/UNITS

TOTAL

1014 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1014A

TOTAL

1014B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1014C

TOTAL

1014D

TOTAL

PRICE

1014E

EST. NO.

/UNITS

TOTAL

1015 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1015A

TOTAL

1015B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1015C

TOTAL

1015D

TOTAL

PRICE

1015E

EST. NO.

/UNITS

TOTAL

1016 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1016A

TOTAL

1016B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1016C

TOTAL

1016D

TOTAL

PRICE

1016E

EST. NO.

/UNITS

TOTAL

1017 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1017A

TOTAL

1017B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1017C

TOTAL

1017D

TOTAL

PRICE

1017E

EST. NO.

/UNITS

TOTAL

1018 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1018A

TOTAL

1018B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1018C

TOTAL

1018D

TOTAL

PRICE

1018E

EST. NO.

/UNITS

TOTAL

1019 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1019A

TOTAL

1019B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1019C

TOTAL

1019D

TOTAL

PRICE

1019E

EST. NO.

/UNITS

TOTAL

1020 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1020A

TOTAL

1020B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1020C

TOTAL

1020D

TOTAL

PRICE

1020E

EST. NO.

/UNITS

TOTAL

1021 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1021A

TOTAL

1021B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1021C

TOTAL

1021D

TOTAL

PRICE

1021E

EST. NO.

/UNITS

TOTAL

1022 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1022A

TOTAL

1022B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1022C

TOTAL

1022D

TOTAL

PRICE

1022E

EST. NO.

/UNITS

TOTAL

1023 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1023A

TOTAL

1023B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1023C

TOTAL

1023D

TOTAL

PRICE

1023E

EST. NO.

/UNITS

TOTAL

1024 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1024A

TOTAL

1024B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1024C

TOTAL

1024D

TOTAL

1025 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1025A

TOTAL

1025B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1025C

TOTAL

1025D

TOTAL

1026 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1026A

TOTAL

1026B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1026C

TOTAL

1026D

TOTAL

1027 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

1027A

TOTAL

1027B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

1027C

TOTAL

1027D

TOTAL

1028 Monthly Status Report Not Separately Priced

1029 DHS 700-05 Contractor Report of Government

FIRST OPTION YEAR TOTAL $_________________

SECOND OPTION YEAR

2001 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2001A

TOTAL

2001B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2001C

TOTAL

2001D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2001E

Propeller, 65’ WYTL, Specification P-245- 0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2002 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2002A

TOTAL

2002B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2002C

TOTAL

2002D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2002E

Propeller, 65’ A/B Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2003 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2003A

TOTAL

2003B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2003C

TOTAL

2003D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2003E

Propeller, 65’ A/B Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2004 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2004A

TOTAL

2004B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2004C

TOTAL

2004D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2004E

Propeller, 65’-75’ WLIC LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2005 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2005A

TOTAL

2005B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2005C

TOTAL

2005D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2005E

Propeller, 65’-75’ WLIC RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2006 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2006A

TOTAL

2006B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2006C

TOTAL

2006D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2006E

Propeller, 75’ C/E Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2007 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2007A

TOTAL

2007B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2007C

TOTAL

2007D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2007E

Propeller, 75’ C/E Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2008 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2008A

TOTAL

2008B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2008C

TOTAL

2008D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2008E

Propeller, 75’ F Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2009 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2009A

TOTAL

2009B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2009C

TOTAL

2009D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2009E

Propeller, 75’ F Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

2010 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2010A

TOTAL

2010B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2010C

TOTAL

2010D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2010E

Propeller, 87’ WPB LH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

2011 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2011A

TOTAL

2011B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2011C

TOTAL

2011D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

2011E

Propeller, 87’ WPB RH, Specification P-245- 0489, Attachment 14.

EST. NO.

/UNITS

TOTAL

2012 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2012A

TOTAL

2012B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2012C

TOTAL

2012D

TOTAL

PRICE

2012E

EST. NO.

/UNITS

TOTAL

2013 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2013A

TOTAL

2013B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2013C

TOTAL

2013D

TOTAL

PRICE

2013E

EST. NO.

/UNITS

TOTAL

2014 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2014A

TOTAL

2014B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2014C

TOTAL

2014D

TOTAL

PRICE

2014E

EST. NO.

/UNITS

TOTAL

2015 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2015A

TOTAL

2015B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2015C

TOTAL

2015D

TOTAL

PRICE

2015E

EST. NO.

/UNITS

TOTAL

2016 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2016A

TOTAL

2016B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2016C

TOTAL

2016D

TOTAL

PRICE

2016E

EST. NO.

/UNITS

TOTAL

2017 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2017A

TOTAL

2017B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2017C

TOTAL

2017D

TOTAL

PRICE

2017E

EST. NO.

/UNITS

TOTAL

2018 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2018A

TOTAL

2018B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2018C

TOTAL

2018D

TOTAL

PRICE

2018E

EST. NO.

/UNITS

TOTAL

2019 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2019A

TOTAL

2019B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2019C

TOTAL

2019D

TOTAL

PRICE

2019E

EST. NO.

/UNITS

TOTAL

2020 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2020A

TOTAL

2020B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2020C

TOTAL

2020D

TOTAL

PRICE

2020E

EST. NO.

/UNITS

TOTAL

2021 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2021A

TOTAL

2021B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2021C

TOTAL

2021D

TOTAL

PRICE

2021E

EST. NO.

/UNITS

TOTAL

2022 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2022A

TOTAL

2022B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2022C

TOTAL

2022D

TOTAL

PRICE

2022E

EST. NO.

/UNITS

TOTAL

2023 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2023A

TOTAL

2023B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2023C

TOTAL

2023D

TOTAL

PRICE

2023E

EST. NO.

/UNITS

TOTAL

2024 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2024A

TOTAL

2024B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2024C

TOTAL

2024D

TOTAL

2025 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2025A

TOTAL

2025B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2025C

TOTAL

2025D

TOTAL

2026 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2026A

TOTAL

2026B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2026C

TOTAL

2026D

TOTAL

2027 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

2027A

TOTAL

2027B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

2027C

TOTAL

2027D

TOTAL

2028 Monthly Status Report Not Separately Priced

2029 DHS 700-05 Contractor Report of Government

SECOND OPTION YEAR TOTAL $_________________

THIRD OPTION YEAR

3001 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

0301A

TOTAL

3001B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

3001C

TOTAL

3001D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

3001E

Propeller, 65’ WYTL, Specification P-245- 0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

3002 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

3002A

TOTAL

3002B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

3002C

TOTAL

3002D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

3002E

Propeller, 65’ A/B Class RH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

3003 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

PRICE

3003A

TOTAL

3003B EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

EST. NO.

/UNITS

TOTAL

3003C

TOTAL

3003D

TOTAL

PRICE

Replace Shipping Container 1 = $____________

3003E

Propeller, 65’ A/B Class LH, Specification P- 245-0146, Attachment 13.

EST. NO.

/UNITS

TOTAL

3004 EST. NO.

X

LOADED

LBR. RT

UNIT

PRICE

X

/UNI

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .