Attachment_4-Technical_Past_Performance_Criteria.pdf
PDF 23 KB Posted
- Solicitation number
- HSCG40-14-R-46001
About this file
Attachment 4 - Technical_Past Performance Criteria
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Z-DRIVE_-_AMEND_NO_0004.pdf | ||
| HSCG85-14-R-46001-AMEND_0003.pdf | ||
| Amendment0002.pdf | ||
| 0001.pdf | ||
| Attachment_2-Schedule_of_Supplies_Services_R1.xls | XLS spreadsheet | |
| Attachment_1A_Drawings_14R46001.zip | ZIP file | |
| Attachment_2-Schedule_of_Supplies_Services.xls | XLS spreadsheet | |
| Attachment_1_-ZD_Ovhl_Spec_R-245-0532_REV_A_Chg_2__11-03-11_.pdf | ||
| Attachment_3-Parts_Lists.xls | XLS spreadsheet | |
| Attachment_5-Request_for_Clarification.doc | DOC document | |
| Solicitation_14R46001.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG40-14-R-46001
ATTACHMENT J-4
TECHNICAL AND PAST PERFORMANCE PERFORMANCE PROPOSAL CRITERIA
FACTOR 1. TECHNICAL
SUBFACTOR A. Ability to Obtain or Manufacture Parts for Ulstein Model 1350H Z-Drives
1. Describe offeror's ability to readily acquire Ulstein Model 1350H Z-Drive OEM parts via local and other sources of supply.
2. If not purchased from the Original Equipment Manufacturer (OEM), explain in detail the offeror’s capability to acquire parts from alternate supply sources or manufacture/re-engineer same as might be required.
3. Provide a projected delivery schedule as might be expected to deliver / re-engineer a piece part.
SUBFACTOR B. Ability to Perform the Statement of Work
1. Describe in detail the offeror’s experience and competence in performing the statement of work including development and submission of Z-drive/propeller pre/post repair inspection reports, performance testing, warehousing, preventive maintenance and preservation, packaging, packing and marking.
SUBFACTOR C. Production Management
1. Provide a sample production plan to accomplish the work required by the solicitation including a schedule of milestones.
2. Provide a list of key personnel and their qualifications who would manage the contract requirements.
SUBFACTOR D. Quality Control Program
1. Describe the offeror’s quality assurance plan to be used as it relates to the requirements of the solicitation.
2. Explain the offeror’s history of quality deficiencies and how the offeror resolved them.
SUBFACTOR E. Facilities
Describe in detail the offeror’s facilities for storage, in-process overhaul and follow-on testing of equipment.
SUBFACTOR F. Shipboard Technical Support
1. Describe in detail the offeror’s ability to provide shipboard technical support simultaneously at different locations.
2. Describe the offeror’s ability to respond within 72 hours of notification.
3. Describe field personnel and their qualifications specific to the Ulstein Model 1350H Z-drive.
HSCG40-14-R-46001
FACTOR 2. PAST PERFORMANCE
This factor evaluates recent past performance on relevant work similar to the scope of work in this solicitation. Recent past performance is considered to be within the last three (3) years. In evaluating past performance, the Government may consider the information in the offeror’s proposal as well as information gathered from other sources including former customers, Government agencies, federal databases and other references.
a. Provide specific examples as a prime contractor that demonstrate successful past performance on relevant work similar to the scope of this solicitation within the last three (3) years.
If any of the work will be subcontracted, provide examples of successful past performance of the proposed subcontractor.
Provide each example in the following format:
1. Contract number
2. Name of contracting activity / commercial business and point of contact including name, phone number and email address
3. Ship name, type
4. Description of work
5. Contract award and completion dates
6. Contract value
7. Discuss problems encountered and offeror’s corrective actions.
File details come from the government source that posted it. Updated .