USCG 45637 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2014
Developed By: Dennis W Sprouse
(Rev-0, 24 February 2014)
USCG 45637 (RB-M-45) DRYDOCK AVAILABILITY FY2014
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................ vii Consolidated List of Critical Inspection Items ......................................................................................................... xi Principal Characteristics .......................................................................................................................................... xii General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Fendering System, Inspect WORK ITEM 5: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 6: Main Diesel Engine to Auragen Generator, Align WORK ITEM 7: Main Diesel Engine To Jet Drive, Align WORK ITEM 8: Water Jet-Inspect, Perform Service WORK ITEM 9: Jet Drive Anodes, Renew WORK ITEM 10: Sea Strainer, Overhaul WORK ITEM 11: Engine Exhaust Piping, Inspect WORK ITEM 12: Electrical Isolation, Perform WORK ITEM 13: Sea Valves, Overhaul WORK ITEM 14: Sea Valves, Renew WORK ITEM 15: Diesel Tank, Refuel WORK ITEM 16: Water Jet Drive, Preserve WORK ITEM 17: U/W Body, Preserve (100%) WORK ITEM 18: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 19: Interior Hull Insulation, Inspect WORK ITEM 20: Marine Chemist Services, Provide WORK ITEM 21: Drydocking WORK ITEM 22: Temporary Services, Provide WORK ITEM 23: Sea Trial Performance, Provide Support WORK ITEM 24: Main Diesel Engine Mount Washers, Replace WORK ITEM 25: Air Intake Baffle, Mast Step, Handhold, Install iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RBM_084_002, Rev-, Docking Plan
Coast Guard Drawing 45 RBM_110_001, Rev-, Hull Structure
Coast Guard Drawing 45 RBM_110_002, Rev-, Hull Structure Module A
Coast Guard Drawing 45 RBM_110_003, Rev-, Hull Structure Module B
Coast Guard Drawing 45 RBM_114_001, Rev A, Fendering Arrangement
Coast Guard Drawing 45 RBM_170_001, Rev A, Folding Mast
Coast Guard Drawing 45 RBM_201_001, Rev A, Main Engine Arrangement
Coast Guard Drawing 45 RBM_247_002, Rev A, Water Jet Propulsion Arrangement
Coast Guard Drawing 45 RBM_256_002, Rev A, Cooling System Propulsion
Coast Guard Drawing 45 RBM_259_002, Rev B, Exhaust System
Coast Guard Drawing 45 RBM_261_001, Rev-, Fuel Supply System Schematic
Coast Guard Drawing 45 RBM_261_002, Rev A, Fuel Supply System
Coast Guard Drawing 45 RBM_261_004, Rev A, Fuel Supply System Tubes
Coast Guard Drawing 45 RBM_261_005, Rev-, Fuel Supply System – Pipe Assemblies
Coast Guard Drawing 45 RBM_261_100, Rev-, Fuel Fill and Vent Schematic
Coast Guard Drawing 45 RBM_261_101, Rev-, Fuel Fill and Vent Arrangement
Coast Guard Drawing 45 RBM_311_004, APU Generator Drive System
Coast Guard Drawing 45 RBM_631_001, Rev B, Painting Layout
Coast Guard Drawing 45 RBM_631_001, Rev C, Painting Layout http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)
Coast Guard Drawing 45 RBM_634_002, Rev B, Deck Covering
Coast Guard Drawing 45 RBM_635_002, Rev A, Insulation Details
Coast Guard Drawing 45RBM-201-001 Rev-.Main Engine Arrangement
Coast Guard Drawing 45RBM-247-001 Rev-, Water Jet Propulsor Arrangement
Coast Guard Drawing 45RBM-252-003 Rev-, Propulsion Control System
Coast Guard Drawing 45RBM-256-002 Rev A, Cooling System Propulsion
Coast Guard Drawing 45RBM-259-002 Rev A, Exhaust System
Coast Guard Drawing 45RBM-261-002 Rev-, Fuel Supply System
Coast Guard Drawing 45RBM-262-002 Rev-, Lube Oil FLOCS System
Coast Guard Drawing 45RBM-311-002 Rev A, APU System Arrangement
Coast Guard Drawing 45RBM-622-002 Rev-, Machinery Space Removable Deck Plate
Coast Guard Drawing 45RBM-84-003 Rev N-A, Main Diesel Engine Mounting for 45 RB-M
COAST GUARD PUBLICATIONS
45 FT Response Boat Medium (RB-M) Operators Handbook COMDTINST M16114.41 March 2012
Coast Guard Commandant Instruction (COMDTINST) M16114.41, March 2012, 45 Ft Response Boat-
Medium (RB-M) Operators Handbook
Coast Guard Technical Publication (TP) 204412-R22 SEQ 1 Marine Trans Owners Manual, May 2009
Coast Guard Technical Publication (TP) 204413-R22 SEQ 3 176001, Rolls Royce Water Jet Maintenance
Manual, Jun 2009
Coast Guard Technical publication (TP) 4934 August 2009, Small Boat Diagrams for Hot work SWBS
Group 74, Section A
Coast Guard Technical Publication (TP) 4934, Small Boat Diagrams for Hotwork
Coast Guard Technical Publication (TP) 4993, 3M Nonskid Pads, Peel and Stick Catalog
Coast Guard Technical Publications 4934-074-A, Small Boat Diagrams for Hotwork March 2010
Commandant Instruction Manual COMDINST M9000.6 (series), Naval Engineering Manual, March 2011
Seawater Cooling System Duplex Strainer 203976-R22 SEQ 1 Technical Manual RBM-203976 Apr 2006
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012,Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2012, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2012, Temporary
Services
OTHER REFERENCES
45 RBM Water Jet Disassembly / Assembly Procedures
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM D1330-04(2010) Standard Specification for Rubber Sheet Gaskets vi (Rev-0)
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning vii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
6 *Y MDE/ TO
GENERATOR
ALIGNMENT
TOOL
PN MMRBM0030 01
7 *Y MDE/ TO JET
DRIVE
ALIGNMENT
TOOL
PN MMRBM0451 01
7 *Y ENGINE LIFTING
BAR
PN MMRBM0956 01
8 N Stainless Steel Ball
Joint
016152117 MMC59915K483 10 EA $12.14
8 N Stainless Steel
Threaded Rod
016152224 MMC93250A140 1 EA $10.90
8 N Bearing Bushing 014555212 10106911 4 EA $6.79
8 N Bearing Bushing 01F133224 36M05101 4 EA $33.91
8 N Socket Head Screw 016171580 91210050 8 EA $1.98
8 N Bolt Kit 016171688 93112085A 2 EA $10.25
8 N Key 016166360 10100824 3 EA $21.21
8 N Sealing Washer 014555212 10106911 4 EA $19.92
8 N Bushing 01F133227 10105511 2 EA $33.91
8 N Bearing Bushing 014555272 10105111 4 EA $24.42
8 N Bolt Kit 016171974 93112080F 2 EA $4.81
8 N Bolt Kit 016167191 93112065K 12 EA $8.00
8 N Bearing Unit 016166342 37506201 2 EA $403.50
8 N Bushing 01F133228 10106011 4 EA $33.91
8 N Set Screw 016020672 91608012 6EA $0.40
8 N Bolt Kit 016173161 93112090K 10EA $9.19
8 N O-ring 01F133222 10202606 6 EA $10.30
8 N Mechanical Sealing 01LG00711 10203870 2 EA $767.45
8 N Bolt Kit 016164058 93310030E 6 EA $1.41
8 N O-ring 016020679 10202631 2 EA $3.53
8 N O-ring 016020680 10202625 4 EA $10.86
8 N Sealing 01HS25214 41018801 2 EA $6.72
8 N O-ring 016200368 10202611 2 EA $4.07
8 N Seal Lip 016204613 10202590 4 EA $28.49
8 N Sealing 016163186 45002010 2 EA $7.31
8 N Lock Nut 016162982 10202908 2 EA $15.56
8 N Lock Washer 01LG00573 10203008 2 EA $1.41 viii (Rev-0)
8 N Ring Nut 016164016 10202912 2 EA $30.00
8 N Bushing 01F133228 10106011 EA $33.91
8 N Seal 01LG00713 10202540R 6 EA $13.56
8 N Screw 016162955 93305025 8 EA $0.21
8 N Washer 016162966 912505 8 EA $0.14
8 N SS Bond Seal 016212084 9900-04SS 4 EA $4.50
8 N 3/8” BSPP SS Seal 016212063 9900-06SS 6 EA $3.90
8 N Gasket 01LG00905 37527805 2 EA $49.52
8 N Bushing 015998296 10108416 8 EA $10.86
8 N Bolt Kit 01LG00893 93110060A 4 EA $8.82
8 N Bolt Kit 01LG00904 99110040G 14 EA $4.61
8 N Bushing 014555268 10106902 8 EA $5.42
8 N Gasket 016163014 10118901 2 EA $2.96
8 N Bolt Kit 01LG00891 93110090A 4 EA $3.72
9 N Waterjet Stbd
Foundation Inbd
Transom Anode
PN:226078675/10108230 1 EA $40.70
9 N Waterjet Stbd
Foundation Outbd
Transom Anode
PN:226078675/10108230 1 EA $40.70
9 N Waterjet Stbd
Tunnel Inbd Anode
PN:016020668/10108220 1 EA $19.00
9 N Waterjet Stbd
Tunnel Outbd Anode
PN:016020668/10108220 1 EA $19.00
9 N Waterjet Stbd
Impeller Housing
Inbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Stbd
Impeller Housing
Outbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Stbd
Bucket Inbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Stbd
Bucket Outbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Stbd
Interceptor Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Port
Foundation Inbd
Transom Anode
PN:226078675/10108230 1 EA $40.70
9 N Waterjet Port
Foundation Outbd
Transom Anode
PN:226078675/10108230 1 EA $40.70
9 N Waterjet Port Tunnel
Inbd Anode
PN:016020668/10108220 1 EA $19.00
9 N Waterjet Port Tunnel
Outbd Anode
PN:016020668/10108220 1 EA $19.00
9 N Waterjet Port
Impeller Housing
Inbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Port PN:226078672/10107701 1 EA $17.63 ix (Rev-0)
Impeller Housing
Outbd Anode
9 N Waterjet Port Bucket
Inbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Port Bucket
Outbd Anode
PN:226078672/10107701 1 EA $17.63
9 N Waterjet Port
Interceptor Anode
PN:226078672/10107701 1 EA $17.63
9 N Screw Connection PN:016022100/93310025H 4 EA $1.74
9 N Screw Connection PN:01HS25513/93308020H 4 EA $0.92
9 N Screw Connection PN:016022105/91206020E 8 EA $1.35
9 N Anode, Anode Hatch PN:251465439/10108210 2 EA $23.07
9 N Bolt Kit PN:016022106/93312025E 2 EA $0.68
9 N Screw Connection PN:01LG00723/XFC310022 8 EA $0.71
9 N O-ring PN:251487667/10202639 2 EA $4.95
9 N Guide Vane
Chamber Port Anode
PN:016020669/37517411 1 EA $205.28
9 N Screw Connection PN:016176732/93310016E 8 EA $0.34
9 N Screw Connection PN:016164078/93112045E 2 EA $6.15
9 N Screw Connection PN:01HS25380/91212025E 8 EA $0.68
9 N O-ring PN:226078691/10202626 2 EA $6.79
9 N Tube Extension PN:01HS25376/37610802 2 EA $120.10
9 N Tube Clamp PN:01HS25503/10217881 2 EA $16.28
9 N Screw Connection PN:01HS25511/93310030H 2 EA $1.60
9 N Screw Connection PN:01HS25381/93308025H 8 EA $0.92
9 N Connecting Cable PN:016203663/10234301 4 EA $14.70
9 N Screw Connection PN:016176732/93306016E 8 EA $0.34
14 N Raw Water Sys De-
Icing Valve Valve, Ball, 1" NPT 316 SS
4820-01-600-0385 or PN:
V210FP-16
2 EA $109.00
14 N AC
Supply/Discharge
Ball Valve Valve, Ball 3/4" NPT 316
SS
4820-01-600-0389 or PN:
V210FP-12
3 EA $109.00
14 N AC Overboard
Check Valve High-
Flow SS Check
Valve 3/4 NPT
Female
4820-01-599-7249 or PN:
46635K65
1 EA $59.40
18 N Non Skid 45 FT
RBM Whole Kit
Contents of kit include box 1 through box 8.
(Round and square hatches not included)
NSN: 2040-00-NIB-0707 1 5,186.71
18 N Non Skid 45 FT
RBM - Round and
NSN: 2040-00-NIB-0707J 1 94.82
x (Rev-0)
Square Hatches -
(Not included in main kit)
21 Y *Transducer Cover
Plate
N/A 1 ea. 50.00
24 N Washer, Flat, Steel
Black-Oxide Finish, 1 X 1.031 ID X 2
OD X .280
thickness, Mc
Master 98099A038
PN: 213102 16 EA
24 N Washer, flat, steel, yellow zinc plating, .625, .656 ID x
1.312 OD x .170-
.195 Thickness, ASTM f436
PN: 213137 32 EA
25 N TCTO KIT NSN: 2940-01-HS2-6782 1 ea UNK *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Ultrasonic Testing (UT) (100) Shots, Perform
3 Hull Plating (U/W Body), Inspect
4 Fendering System, Inspect
6 Main Diesel Engine to Auragen Generator, Align
7 Main Diesel Engine To Jet Drive, Align
8 Water Jet-Inspect, Perform Service
10 Sea Strainer, Overhaul
16 Water Jet Drive, Preserve
17 U/W Body, Preserve (100%) xii (Rev-0)
PRINCIPAL CHARACTERISTICS
45 FT RESPONSE BOAT MEDIUM
HULL MANUFACTURED BY MARINETTE MARINE CORP
5086 (GRADE) ALUMINUM
HIN- 2009
LENGTH OVERALL
44 FEET, 10.5 INCHES
UNFIXED HEIGHT
20 FEET 9 INCHES
BEAM, MAXIMUM
14 FEET, 7.75 INCHES
FULL LOAD DRAFT
3 FEET, 4 INCHES
FULL LOAD DISPLACEMENT
36,500 POUNDS
MAX SUSTAINED SPEED
42.5 KNOTS
RANGE
250 NAUTICAL MILES AT 30 KNOTS
MISSION LIMITS
8 FOOT SEAS / 30 KNOT WINDS
SURVIVABILITY LIMITS
12 FOOT SEAS / 50 KNOT WINDS
PROPULSION
TYPE 6 CYLINDER DIESEL ENGINE
NUMBER OF UNITS 2 MTU’S 60 SERIES 825 HP
WATER JETS
TYPE ROLLS-ROYCE WATER-JET
NUMBER OF UNITS
TWO
1 (Rev-0)
00000_1113_FLT
REC_00000_FLT_
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting drydock for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with SFLC Std Spec 6310, Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 11 of SFLC Std Spec 6310) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 HW disposal. The Contractor shall be considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.5.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262
3.5.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.5.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.5.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.6 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:
3.6.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks: Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec , and replace with formula value g -
Acceleration of gravity - 32.174 ft/sec
3.6.2 SFLC Std Spec 0740, Welding and Allied Processes. SFLC Std Spec 0740 added Appendix E, Stray
Current Protection: New Appendix is posted with SFLC Standard Specifications as a separate document on internet and intranet webpage.
3.6.2.1 SFLC Std Spec 0740, page 1, paragraph 1.2 Appendices: Add ‘Stray Current Protection’ to ‘Process
Standard column of appendices table. Add ‘E’ to ‘Appendix’ column of appendices table.
3.6.2.2 SFLC Std Spec 0740, page 4, paragraph 3.1.3 Stray current protection: Add “The Contractor shall meet all requirements for stray current protection as specified in Appendix E - Stray Current Protection.” directly after paragraph 3.1.3 title.
3 (Rev-0)
3.6.2.3 SFLC Std Spec 0740, page 4, paragraph 3.1.3 Stray current protection: Delete paragraphs 3.1.3.1 and
3.1.3.2.
3.6.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 1, paragraph 1.1 Intent:
Add sentence, “Note that stray current protection for welding equipment is covered in SFLC Standard
Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.1 SFLC Std Spec 0450, page 5, paragraph 3.4 Equipment Grounding: Add sentence, “Stray current protection for welding equipment is covered in SFLC Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.2 SFLC Std Spec 0450, page 6, paragraph 3.4 Equipment Grounding: Delete paragraphs 3.4.1.4 and
3.4.1.5.
3.6.3.3 SFLC Std Spec 0450, page 6, paragraph 3.4 Equipment Grounding: Delete Figure 5.
3.6.4 SFLC Std Spec 0000, General Requirements, Appendix A Requirements for Environmental Protection:
Add new paragraph A2.2.5.3.3 Additional requirement during lead-containing paint abatement, as follows:
A2.2.5.3.3 Additional requirements during lead-containing paint abatement. Abide by the following additional requirements, during work that involves disturbance or abatement of lead-containing paint:
A2.2.5.3.3.1 Protective measures.
A2.2.5.3.3.1.1 Abide by the following additional safety precautions during the lead dust clean-up operation (see
A2.2.5.3.3.3 Post-surface preparation cleaning, inspection, and sampling):
Separate contaminated areas from other areas.
Do not permit non-essential personnel in the work area.
Work in one compartment at a time.
Prevent dust from migrating to other areas, as follows:
o Seal doors, hatches, and all other openings between the work area and other areas with an airtight barrier, such as fire-rated polyethylene; seal both sides (inside the construction area, and inside the adjacent area) to provide a secondary dust barrier and prevent the doors and windows from being used (post alternative emergency exits, if applicable).
o Ensure that the work area remain under negative pressure in relation to adjacent areas.
NOTE
Negative pressure means that more air is exhausted from the area than is supplied so that lead dust and asbestos particles are contained within the work area, and do not contaminate adjacent non-affected compartments. Exhaust air must be filtered with a suitable HEPA filter.
Take, at a minimum, the following measures, to protect de-contamination workers:
o Use a HEPA (high-efficiency particulate air) vacuum - never use a conventional vacuum. A
HEPA vacuum removes 99.97% of particles that are less than 0.3 microns in size.
o Never use compressed air; never dry sweep.
o Workers must wear a respirator which is approved by NIOSH and has N100, P100 or R100 filters (the cartridges are usually purple); respirators must be fit-tested to insure proper seal, and employees must be medically screened and trained prior to wearing a respirator (see the
4 (Rev-0)
OSHA Respirator Standard, 29 CFR 1910.134).
o Workers must wear full-body protective clothing, head covering and shoes (or shoe covers).
o Workers must not leave the work area without having gone through a proper decontamination process, to prevent spread of lead dust to un-affected areas.
o Eating, drinking and smoking are prohibited in work areas.
o Workers must wash hands and face before eating, drinking or smoking.
o Workers must remove work clothes and shoes before leaving the work area, and seal work clothes in plastic.
o Workers must shower and wash hair as soon as possible after leaving the work area.
o Non-disposable work clothes must be washed separately from other clothes.
A2.2.5.3.3.1.2 Remove and dispose of all protective covers, upon completion of work.
A2.2.5.3.3.2 Spot lead coating abatement. When lead-containing coating, has been identified either in a particular work item or via a CFR as interference to work (including but not limited to hotwork, equipment and component installations, structural repairs, or ultrasonic thickness measurements), do the following:
A2.2.5.3.3.2.1 Coating removal/surface preparation. Remove existing lead-containing coating in affected areas, using one or a combination of the cleaning methods specified in Table A1 below, as applicable. Ensure that all power tool equipment have suitable vacuum attachments, to capture all generated coating lead dust.
TABLE A1
MECHANICAL CLEANING CHEMICAL STRIPPING
Steel surfaces: Power tool clean to a SSPC-SP
11 (1.0 mil anchor profile).
Use a suitable chemical stripper to safely remove all existing coatings – and expose the bare substrate, in accordance with manufacturer’s instructions.
Aluminum surfaces: Power tool clean, using suitable power sanders and abrasive sandpaper with no metallic contents, to remove all existing coatings and rust spots, down to bare metal.
NOTE
Known paint strippers meeting the requirements specified in Table A1 include, but are not limited to the following:
1. Franmar LeadOut
2. STRIP-TOX Paint Stripper
3. Aquastrip ACB
4. Smart Strip™ Advanced Paint Remover:
WARNING
Paint stripper must be formulated without methylene chloride, chlorinated solvents, phenols, chromates, ammonia or amines.
5 (Rev-0)
A2.2.5.3.3.2.2 Waste Disposal. Sample and dispose of generated waste, in accordance with all applicable
Federal, state, and local regulations.
A2.2.5.3.3.3 Post-surface preparation cleaning, inspection, and sampling. Upon completion of any surface involving removal of lead-containing coating (whether during spot abatement or full abatement), do the following, as applicable:
A2.2.5.3.3.3.1 Lead dust clean-up. Clean all lead dust from the worksite by suitable clean-up cleaning methods, or as follows:
Step 1 - debris removal: Remove all gross debris, paint chips, etc. using either a vacuum with a
HEPA filter or by spraying the materials with water in a spray bottle and picking up chips or large pieces of contaminated debris by hand.
Step 2 – vacuum cleaning: Using a suitable HEPA vacuum, clean all affected surfaces, in accordance with the following guidelines:
o Begin cleaning with high areas first – with overhead surfaces and bulkheads working downward.
o Vacuum all surfaces in the compartment.
o Work in the direction furthest from the entry door toward it.
Step 3 – wet cleaning: Following thorough HEPA vacuuming, wash all surfaces with any suitable cleaning detergent following the same cleaning pattern (high to low/ furthest from and toward entrance). Change the cleaning solution as it becomes dirty. Rinse all areas with a fresh cloth/mop.
Do not reuse contaminated mops and cloths. Use a three-bucket system for cleaning. (Detergent solution in first bucket/ rinse water for mop in second/ surface rinse on deck and/or bilge surfaces in third).
Step 4 – vacuum cleaning: Perform a HEPA vacuum again as specified in “Step 2”.
Step 5 – waste disposal: Properly dispose of contaminated materials, in accordance with all applicable Federal, state, and local regulations.
NOTES
1. Work Wet, Work Smart, and Work Clean. DO NOT GENERATE DUSTS. It is easier to effectively clean an area when dusts are not being generated to resettle on previously cleaned areas! Worker exposures may be high during wet sweeping.
2 A wet/dry HEPA unit is ideal for working with hazardous dust clean up.
3. Lead-contaminated objects that are porous or materials that may suffer damage from water may not be able to be sufficiently decontaminated by these methods and should be discarded.
A2.2.5.3.3.3.2 Visual inspection. Conduct a visual inspection, in the presence of the Coast Guard Inspector, to ensure that none of the following is present:
Visible coatings on any part of the substrate, including pitted areas.
Dust (as applicable).
Cleaning material haze.
A2.2.5.3.3.3.3 Post-lead abatement clearance. Upon acceptance of the visual inspection results by the COR, do the following:
A2.2.5.3.3.3.3.1 Wipe sampling.
6 (Rev-0)
A2.2.5.3.3.3.3.1.1 Conduct wipe sampling clearance testing, in accordance with ASTM 6966, as designated by the Coast Guard Inspector, in three locations in the affected space, to ensure that there exist no lead dust residues in excess of the below-listed concentrations, as specified below. Submit a CFR with sample results
40 micrograms/square foot (mcg/ft 2) - for berthing and/or food preparation areas.
200 micrograms/square foot (mcg/ft 2) - for all other areas.
A2.2.5.3.3.3.3.1.2 If a Change Request (CR) has been authorized and released, conduct wipe sampling clearance testing in additional locations, as designated on the CR.
A2.2.5.3.3.3.3.2 Laboratory analysis. Ensure that dust lead samples are analyzed by a laboratory certified by the
National Lead Laboratory Accreditation Program (NLLAP) or the American Industrial Hygiene Association.
A2.2.5.3.3.3.4 Additional cleaning. If laboratory analysis shows lead concentrations in excess of the thresholds specified above, then perform lead dust cleaning, and take subsequent wipe samples until the concentration of lead falls below the above standards.
A2.2.5.3.3.3.5 Additional wipe clearance testing. Be aware that the Coast Guard reserves the right to coordinate additional wipe clearance testing, at no cost to the contractor, to verify the sample results.
NOTE
All additional wipe clearance testing conducted by the Coast Guard must be witnessed by the Contractor, to verify where and how samples were collected – and thus, prevent contract disputes.
A2.2.5.3.4 Post-surface preparation and abatement requirements. Prior to applying primer coat, do the following, in accordance with SFLC Std Spec 6310, paragraphs 3.1.8.7 (Flash rusting/surface oxidation limitations) and
3.1.8.6 (Hydrocarbon substance removal), respectively.
Remove all flash rusting, as applicable.
Remove all grease and oil surface contaminants.
NOTE
The following paragraphs are not applicable, when lead-containing coating is removed by non-dust generating methods that include (but are not limited to) chemical stripping, water-jetting, mechanical-cleaning with vacuum attachment (with zero dust discharge):
A2.2.5.3.3.3.1 Lead dust clean-up
A2.2.5.3.3.3.3 Clearance sampling
A2.2.5.3.3.3.3.1 Wipe sampling – lead dust.
A2.2.5.3.3.3.3.2 Laboratory analysis
3.6.4.1 SFLC Std Spec 0000, page 22, paragraph 3.3.3.1 NOTE. Add "Flame-retardant polyethylene deck plate with a non-slip diamond pattern from 10 to 40mil thickness" to body of Note.
3.6.5 SFLC Std Spec 6310, Requirements For Preservation Of Ship Structures, page 10, add “3.1.6.5
Preconstruction Primers. Also known as shop primers, preconstruction primers are used as a temporary coating to protect steel from corrosion during welding, storage, and fabrication. Preconstruction primers shall be removed prior to applying the permanent coating system on all critical coated surfaces. Preconstruction primers may be left in place in other interior areas (such as machinery spaces, habitability spaces, etc.) if they are intact, uncontaminated, and compatible with the overcoating system.”
7 (Rev-0)
3.6.5.1 Std Spec 6310, Appendix B, page B12 , the formatting for of Notes 17-19 change and add as per the following:
SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 17, delete sentence, “Persistent corrosion in a particular area of an aluminum bilge may dictate the need for a protective High Build Epoxy coating to be applied to that local area.”
SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 18, replace entire note with “Persistent corrosion in a particular area of an aluminum bilge may dictate the need for a protective High Build Epoxy coating to be applied to that local area. “
SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Note 19, replace entire note with “Painting plastic surfaces is highly discouraged, but after it is done once, it must be maintained.”
SFLC Std Spec 6310, Cutter And Boat Interior Painting Systems, Appendix B12, Add Note “20. For aluminum surfaces, remove all oil, grease, dirt, metal oxides (corrosion products) and other foreign material by cleaning per SSPC-S
3.6.6 SFLC Std Spec 8635, Temporary Services, page 2, delete paragraph 3.3.2.2.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
8 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
9 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT.
SURFACE AMBIENT
ΔT
| DP -
Surface |
10 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
11 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
12 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS
CONDUCTIVITY
(microsiemens/cm)
13 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time
Coating System Sequence
(Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
14 (Rev-0)
07400_AKP_1013_BOAT_FLT
WORK ITEM 1: General Welding, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide general welding. The contractor shall provide all material and labor to affect cracked weld repairs to the port side forward deck grate as per Figures 1 and 2.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Technical publication (TP) 4934 August 2009, Small Boat Diagrams for Hot work SWBS Group 74, Section A
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
15 (Rev-0)
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirement. The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on
Coast Guard vessels and equipment in accordance with TP 4934 and SFLC Std Spec 0740.
3.3 Bidding. For bidding purposes this specification will be broke down by the following:
One linear foot of welding/brazing.
Four square inches of clad/overlay welding.
One hour of fabrication.
One square foot of plate renewal.
STEEL PLATE ALUMINUM PLATE
THICKNESS WEIGHT
PER
SQFT.
TYPE/GRADE THICKNESS WEIGHT
PER
SQFT
TYPE/ALLOY
3/16 (.1875) 7.66 lb
1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb
5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb
3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb
1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb
3.4 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
This section is not applicable to this work item.
16 (Rev-0)
FIGURE 1. CRACKED WELD AT BASE OF DECK GRATE
17 (Rev-0)
FIGURE 2. CRACKED WELD AT BASE OF DECK GRATE
18 (Rev-0)
10000_AKP_0913_45RBM
WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots at locations designated by the Coast Guard Inspector.
1.2 Government-furnished property.
None
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012,Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3 Reporting
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the
19 (Rev-0) presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Ultrasonic thickness measurement. The Contractor shall perform a total of 100 thickness measurements in locations designated by the Coast Guard Inspector utilizing Figure 1 and Figure
2 in accordance with SFLC Std Spec 0740. Record all measurements in Tables 1, 2, and 3.
3.3 Reporting. The Contractor shall submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.
FIGURE 1. BOTTOM SHELL PLATING EXPANDED
20 (Rev-0)
FIGURE 2. STERN SECTION SHELL PLATING
21 (Rev-0)
TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X
100)
LOCATION
AREA
DESIGN
THICKNESS
MAXIMUM
ALLOWABLE
THICKNESS
UT
READINGS
*PERCENT
LOSS
SHELL PLATING PORT SIDE SECTION “A”
1 .250 .187
2 .250 .187
3 .250 .187
4 .250 .187
5 .250 .187
6 .250 .187
7 .250 .187
8 .250 .187
9 .250 .187
10 .250 .187
SHELL PLATING PORT SIDE SECTION “B”
11 .250 .187
12 .250 .187
13 .250 .187
14 .250 .187
15 .250 .187
16 .250 .187
17 .250 .187
18 .250 .187
19 .250 .187
20 .250 .187
SHELL PLATING PORT SIDE SECTION “C”
21 .250 .187
22 .250 .187
23 .250 .187
24 .250 .187
25 .250 .187
26 .250 .187
27 .250 .187
28 .250 .187
29 .250 .187
30 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “C”
31 .250 .187
32 .250 .187
33 .250 .187
34 .250 .187
35 .250 .187
36 .250 .187
37 .250 .187
38 .250 .187
22 (Rev-0)
39 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “B”
40 .250 .187
41 .250 .187
42 .250 .187
43 .250 .187
44 .250 .187
45 .250 .187
46 .250 .187
47 .250 .187
48 .250 .187
49 .250 .187
SHELL PLATING STARBOARD SIDE SECTION “A”
50 .250 .187
51 .250 .187
52 .250 .187
53 .250 .187
54 .250 .187
55 .250 .187
56 .250 .187
57 .250 .187
58 .250 .187
59 .250 .187
60 .250 .187
STERN SECTION “A”
61 .250 .187
62 .250 .187
63 .250 .187
STERN SECTION “B”
64 .250 .187
65 .250 .187
66 .250 .187
67 .250 .187
STERN SECTION “C”
68 .250 .187
69 .250 .187
70 .250 .187
23 (Rev-0)
TABLE 2 - ADDITIONAL U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X
100)
LOCATION
AREA
DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
UT READING *PERCENT
LOSS
PORT SIDE AREAS “A, B, C”
1A .250 .187
2A .250 .187
3A .250 .187
4A .250 .187
5A .250 .187
6A .250 .187
7A .250 .187
8A .250 .187
9A .250 .187
10A .250 .187
11A .250 .187
12A .250 .187
STARBOARD SIDE AREAS “A, B, C”
13A .250 .187
14A .250 .187
15A .250 .187
16A .250 .187
17A .250 .187
19A .250 .187
20A .250 .187
21A .250 .187
22A .250 .187
23A .250 .187
24A .250 .187
STERN AREAS “A, B, C”
25A .250 .187
26A .250 .187
27A .250 .187
28A .250 .187
29A .250 .187
30A .250 .187
24 (Rev-0)
TABLE 3 - UNDERWATER HULL BODY MINIMUM THICKNESS TEST RESULTS
REPORT
DATE: ______________________
LOCATIONS MIN. THICKNESS FOUND DESIGN
THICKNESS
MINIMUM
ALLOWED
THICKNESS
AT 25%
LOSS
MINIMUM
ALLOWED
THICKNESS
AT 50%
LOSS
(A) (B) (C)
Port Hull: Boot
Top to Keel
.250 .187 .125
STBD Hull: Boot
Stern Hull: Boot
Comments:
25 (Rev-0)
11000_1113_45RBM
WORK ITEM 3: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .