Schedule_of_Supplies_-_PRICE_FILL_IN_-_Rudder_Overhaul.doc

DOC document 41 KB Posted

Attached to
Overhaul of Rudder Assemblies
Solicitation number
HSCG40-14-Q-CW055
Issued by

About this file

Schedule Of Supplies/Services - Price Fill In

View the file

Other files

File Type Posted
225B-WLB_562_2_C_replaces_225-WLB_562_2.zip ZIP file
225B-WLB_561_3_A_replaces_225-WLB_561_3.zip ZIP file
225B-WLB_562_1_E_replaces_225-WLB_562_1_E.zip ZIP file
225-WLB_562_2_6_-_F 1 .dwf DWF file
225-WLB_562_2_3_-_F 1 .dwf DWF file
225-WLB_562_2_5_-_F 1 .dwf DWF file
225-WLB_561_3_2_-_E 1 .dwf DWF file
225-WLB_562_2_2_-_F 1 .dwf DWF file
P-562-0300_Rev_A.doc DOC document
D-000-0100-Rev_G.doc DOC document
225-WLB_561_3_3_-_E 1 .dwf DWF file
225-WLB_562_3_1_-_A.pdf PDF
225-WLB_562_2_4_-_F 1 .dwf DWF file
225-WLB_562_2_1_-_F 1 .dwf DWF file
225-WLB_562_2_7_-_F 1 .dwf DWF file
225-WLB_562_1_3_-_J.pdf PDF
225-WLB_562_1_2_-_J.pdf PDF
225-WLB_562_1_1_-_J.pdf PDF
225-WLB_561_3_1_-_E 1 .dwf DWF file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF SUPPLIES/SERVICES

For evaluation purposes, the estimated cost of travel for 1 on-site Quality Assurance inspection at the Contractor’s plant will be calculated. The inspection will take place at (insert physical address): ___________________________________________________________________.

In accordance with Paragraphs 3.2 and 3.2.1 of Specification P-562-0300, contractor(s) shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item listed below. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

1. NSN 2040-01-507-7034, 225’ Rudder Stock Assy

Est. Number Loaded of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

1A. Cost to complete overhaul of each Rudder Assembly, after authority to proceed, in accordance with Paragraphs 3.2.2 through 3.8 of Specification P-562-0300. Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each rudder assembly upon induction for overhaul.

Est. Number Loaded

Of Labor Hours Hourly Rate Qty Total Amount

1390 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery of Rudder Assembly, in accordance with Paragraphs 5.0 through 5.4 of Specification P-562-0300.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on an FOB Destination basis).

1 JOB = ________________

Total of 1A = _______________

2. NSN 2040-01-507-7034, 225’ Rudder Stock Assy

Est. Number Loaded of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

2A. Cost to complete overhaul of each Rudder Assembly, after authority to proceed, in accordance with Paragraphs 3.2.2 through 3.8 of Specification P-562-0300. Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each rudder assembly upon induction for overhaul.

Est. Number Loaded

Of Labor Hours Hourly Rate Qty Total Amount

1390 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery of Rudder Assembly, in accordance with Paragraphs 5.0 through 5.4 of Specification P-562-0300.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on an FOB Destination basis).

1 JOB = ________________

Total of 2A = _______________

File details come from the government source that posted it. Updated .