Schedule_of_Supplies_-_PRICE_FILL_IN_-_Rudder_Overhaul.doc
DOC document 41 KB Posted
- Attached to
- Overhaul of Rudder Assemblies
- Solicitation number
- HSCG40-14-Q-CW055
About this file
Schedule Of Supplies/Services - Price Fill In
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 225B-WLB_562_2_C_replaces_225-WLB_562_2.zip | ZIP file | |
| 225B-WLB_561_3_A_replaces_225-WLB_561_3.zip | ZIP file | |
| 225B-WLB_562_1_E_replaces_225-WLB_562_1_E.zip | ZIP file | |
| 225-WLB_562_2_6_-_F 1 .dwf | DWF file | |
| 225-WLB_562_2_3_-_F 1 .dwf | DWF file | |
| 225-WLB_562_2_5_-_F 1 .dwf | DWF file | |
| 225-WLB_561_3_2_-_E 1 .dwf | DWF file | |
| 225-WLB_562_2_2_-_F 1 .dwf | DWF file | |
| P-562-0300_Rev_A.doc | DOC document | |
| D-000-0100-Rev_G.doc | DOC document | |
| 225-WLB_561_3_3_-_E 1 .dwf | DWF file | |
| 225-WLB_562_3_1_-_A.pdf | ||
| 225-WLB_562_2_4_-_F 1 .dwf | DWF file | |
| 225-WLB_562_2_1_-_F 1 .dwf | DWF file | |
| 225-WLB_562_2_7_-_F 1 .dwf | DWF file | |
| 225-WLB_562_1_3_-_J.pdf | ||
| 225-WLB_562_1_2_-_J.pdf | ||
| 225-WLB_562_1_1_-_J.pdf | ||
| 225-WLB_561_3_1_-_E 1 .dwf | DWF file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF SUPPLIES/SERVICES
For evaluation purposes, the estimated cost of travel for 1 on-site Quality Assurance inspection at the Contractor’s plant will be calculated. The inspection will take place at (insert physical address): ___________________________________________________________________.
In accordance with Paragraphs 3.2 and 3.2.1 of Specification P-562-0300, contractor(s) shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item listed below. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.
1. NSN 2040-01-507-7034, 225’ Rudder Stock Assy
Est. Number Loaded of Labor Hours Hourly Rate Qty Total Amount
____________ X __________ X 1 EA = ________________
1A. Cost to complete overhaul of each Rudder Assembly, after authority to proceed, in accordance with Paragraphs 3.2.2 through 3.8 of Specification P-562-0300. Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each rudder assembly upon induction for overhaul.
Est. Number Loaded
Of Labor Hours Hourly Rate Qty Total Amount
1390 X __________ X 1 EA = ________________
Packaging, Marking, Bar Coding, and preparation for delivery of Rudder Assembly, in accordance with Paragraphs 5.0 through 5.4 of Specification P-562-0300.
1 JOB = ________________
Shipping Charge - (NOTE: Pricing is preferred on an FOB Destination basis).
1 JOB = ________________
Total of 1A = _______________
2. NSN 2040-01-507-7034, 225’ Rudder Stock Assy
Est. Number Loaded of Labor Hours Hourly Rate Qty Total Amount
____________ X __________ X 1 EA = ________________
2A. Cost to complete overhaul of each Rudder Assembly, after authority to proceed, in accordance with Paragraphs 3.2.2 through 3.8 of Specification P-562-0300. Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each rudder assembly upon induction for overhaul.
Est. Number Loaded
Of Labor Hours Hourly Rate Qty Total Amount
1390 X __________ X 1 EA = ________________
Packaging, Marking, Bar Coding, and preparation for delivery of Rudder Assembly, in accordance with Paragraphs 5.0 through 5.4 of Specification P-562-0300.
1 JOB = ________________
Shipping Charge - (NOTE: Pricing is preferred on an FOB Destination basis).
1 JOB = ________________
Total of 2A = _______________