ATTACHMENT_2_CLIN_HULL_MONITORING.doc
DOC document 39 KB Posted
- Attached to
- INSTALLATION OF HULL MONITORING SYSTEM
- Solicitation number
- HSCG40-13-R-30009
About this file
Attachment 2-Prices/Required Delivery Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_1_SPEC.pdf | ||
| REV_Solicitation_HSCG40-13-R-30009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG40-13-R-30009 HULL MONITORING
CLIN LISTING
THE COAST GUARD ANTICPATES 7 SHIPS WILL BE COMPLETED OVER A FIVE (5) YEAR PERIOD.
BASE YEAR
0001 COMPLETE A PRELIMINARY SHIP CHECK FOR ANY CONTENTIAL UNITED STATES (CONUS) SHIP IAW SPEC EC_11000_RRY_0212_378 section 3.4 Est. 1 Each @ $___________ = $___________ Delivery Schedule- 10 Days after Delivery Order
0002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 30 Days after Delivery Order
0003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7 To be completed 14 days after start of installation.
Delivery Schedule- 14 Days after Delivery Order
a) Install in San Diego, CA
Est. 1 Each @ $___________ = $___________
b) Install in Honolulu, HI
Est. 1 Each @ $___________ = $___________
c) Install in Seattle, WA Est. 1 Each @ $___________ = $___________
d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________
0004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 45 Days after Delivery Order
0005 WARRANTY
Warranty in accordance with addendum to FAR Clause 52.212-4 (o)
Required=Not Separately Priced
Delivery Schedule – IAW addendum to FAR Clause 52.212-4
OPTION YEAR 1
1002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 30 Days after Delivery Order
1003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7
To be completed 14 days after start of installation.
Delivery Schedule- 14 Days after Delivery Order
a) Install in San Diego, CA
Est. 1 Each @ $___________ = $___________
b) Install in Honolulu, HI
Est. 1 Each @ $___________ = $___________
c) Install in Seattle, WA
Est. 1 Each @ $___________ = $___________
d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________
1004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 45 Days after Delivery Order
1005 WARRANTY
OPTION YEAR 2
2002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 30 Days after Delivery Order
2003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7
To be completed 14 days after start of installation.
Delivery Schedule- 14 Days after Delivery Order
a) Install in San Diego, CA
Est. 1 Each @ $___________ = $___________
b) Install in Honolulu, HI
Est. 1 Each @ $___________ = $___________
c) Install in Seattle, WA
Est. 1 Each @ $___________ = $___________
d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________
2004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 45 Days after Delivery Order
2005 WARRANTY
OPTION YEAR 3
3002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 30 Days after Delivery Order
3003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7
To be completed 14 days after start of installation.
Delivery Schedule- 14 Days after Delivery Order
a) Install in San Diego, CA
Est. 1 Each @ $___________ = $___________
b) Install in Honolulu, HI
Est. 1 Each @ $___________ = $___________
c) Install in Seattle, WA
Est. 1 Each @ $___________ = $___________
d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________
3004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 45 Days after Delivery Order
3005 WARRANTY
OPTION YEAR 4
4002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 30 Days after Delivery Order
4003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7
To be completed 14 days after start of installation.
Delivery Schedule- 14 Days after Delivery Order
a) Install in San Diego, CA
Est. 1 Each @ $___________ = $___________
b) Install in Honolulu, HI
Est. 1 Each @ $___________ = $___________
c) Install in Seattle, WA
Est. 1 Each @ $___________ = $___________
d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________
4004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________
Delivery Schedule- 45 Days after Delivery Order
4005 WARRANTY
Warranty in accordance with addendum to FAR Clause 52.212-4 (o)