ATTACHMENT_2_CLIN_HULL_MONITORING.doc

DOC document 39 KB Posted

Attached to
INSTALLATION OF HULL MONITORING SYSTEM
Solicitation number
HSCG40-13-R-30009
Issued by

About this file

Attachment 2-Prices/Required Delivery Schedule

View the file

Other files

File Type Posted
ATTACHMENT_1_SPEC.pdf PDF
REV_Solicitation_HSCG40-13-R-30009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG40-13-R-30009 HULL MONITORING

CLIN LISTING

THE COAST GUARD ANTICPATES 7 SHIPS WILL BE COMPLETED OVER A FIVE (5) YEAR PERIOD.

BASE YEAR

0001 COMPLETE A PRELIMINARY SHIP CHECK FOR ANY CONTENTIAL UNITED STATES (CONUS) SHIP IAW SPEC EC_11000_RRY_0212_378 section 3.4 Est. 1 Each @ $___________ = $___________ Delivery Schedule- 10 Days after Delivery Order

0002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 30 Days after Delivery Order

0003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7 To be completed 14 days after start of installation.

Delivery Schedule- 14 Days after Delivery Order

a) Install in San Diego, CA

Est. 1 Each @ $___________ = $___________

b) Install in Honolulu, HI

Est. 1 Each @ $___________ = $___________

c) Install in Seattle, WA Est. 1 Each @ $___________ = $___________

d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________

0004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 45 Days after Delivery Order

0005 WARRANTY

Warranty in accordance with addendum to FAR Clause 52.212-4 (o)

Required=Not Separately Priced

Delivery Schedule – IAW addendum to FAR Clause 52.212-4

OPTION YEAR 1

1002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 30 Days after Delivery Order

1003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7

To be completed 14 days after start of installation.

Delivery Schedule- 14 Days after Delivery Order

a) Install in San Diego, CA

Est. 1 Each @ $___________ = $___________

b) Install in Honolulu, HI

Est. 1 Each @ $___________ = $___________

c) Install in Seattle, WA

Est. 1 Each @ $___________ = $___________

d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________

1004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 45 Days after Delivery Order

1005 WARRANTY

OPTION YEAR 2

2002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 30 Days after Delivery Order

2003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7

To be completed 14 days after start of installation.

Delivery Schedule- 14 Days after Delivery Order

a) Install in San Diego, CA

Est. 1 Each @ $___________ = $___________

b) Install in Honolulu, HI

Est. 1 Each @ $___________ = $___________

c) Install in Seattle, WA

Est. 1 Each @ $___________ = $___________

d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________

2004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 45 Days after Delivery Order

2005 WARRANTY

OPTION YEAR 3

3002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 30 Days after Delivery Order

3003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7

To be completed 14 days after start of installation.

Delivery Schedule- 14 Days after Delivery Order

a) Install in San Diego, CA

Est. 1 Each @ $___________ = $___________

b) Install in Honolulu, HI

Est. 1 Each @ $___________ = $___________

c) Install in Seattle, WA

Est. 1 Each @ $___________ = $___________

d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________

3004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 45 Days after Delivery Order

3005 WARRANTY

OPTION YEAR 4

4002 PROVIDE EQUIPMENT FOR ONE (1) INSTALLATION IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.3 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 30 Days after Delivery Order

4003 INSTALL IAW SPEC EC_11000_RRY_0212_378 SECTIONS 3.5, 3.6, and 3.7

To be completed 14 days after start of installation.

Delivery Schedule- 14 Days after Delivery Order

a) Install in San Diego, CA

Est. 1 Each @ $___________ = $___________

b) Install in Honolulu, HI

Est. 1 Each @ $___________ = $___________

c) Install in Seattle, WA

Est. 1 Each @ $___________ = $___________

d) Install in Kodiak, AK Est. 1 Each @ $___________ = $___________

4004 WRITE AND DELIVER TECHICNICAL DOCUMENTATION AND PROVIDE RED-LINE DRAWINGS IAW SPEC EC_11000_RRY_0212_378 SECTION 3.8 Est. 1 Each @ $___________ = $___________

Delivery Schedule- 45 Days after Delivery Order

4005 WARRANTY

Warranty in accordance with addendum to FAR Clause 52.212-4 (o)

File details come from the government source that posted it. Updated .