About this file

Testing Preservation and Long Term Storage

Text of this file

HSCG40-12-R-10009

ENCLOSURE IV

TESTING, PRESERVATION AND LONG TERM STORAGE

TESTING

Contractor shall conduct standard performance testing and provide testing results to the Coast Guard Contracting Specialist, Beth Farley, via email, Beth.A.Farley@uscg.mil. One copy shall be placed in the storage container in a waterproof envelope.

PRESERVATION

The Generator Set (GENSET) shall be preserved for Long Term Storage in accordance with John Deere Diesel Engine Long Term Storage requirements. After completing the Long Term Storage Preservation requirements, the GENSET shall be shrink wrapped and sealed. A suitable amount of dessicant shall be placed inside the shrink wrap to provide moisture protection.

LONG TERM STORAGE

The GENSET will not be immediately installed and is designated for long term storage in excess of six (6) months. The packaging and packing shall be in accordance with SP-PP&M REV. D and ASTM-D-3951. Packaging and packing shall provide maximum protection for multiple shipments and warehouse storage and handling.

Other files

File Type Posted
Enclosure III.docx DOCX document
Enclosure I.pdf PDF
Enclosure II.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .