HSCG40-11-R-30097.pdf

PDF 305 KB Posted

Attached to
Overhaul Pratt & Whitney FT4A Free Turbines/Gearbox
Solicitation number
HSCG40-11-R-30097
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
JOTFOC 30097.pdf PDF
Overhaul Spec R-234-0209 Rev E.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG40-10-R-30097

OMBUDSMAN

NOTICE FOR FILING AGENCY PROTEST

It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file formal agency protest with the Contracting Officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe that Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government.

The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:

Commandant (CG-913) U.S. Coast Guard Headquarters

Acquisition Planning and Performance Measurement 1900 Half St. S.W. Room 11-0402

Washington, DC 20593 Telephone (202) 372-3692

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 7900)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXT.

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXT.

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) 41 U.S.C. 253 (c)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV,. 9-97)

Prescribed by GSA - Far (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

1A 77

Toni.J.Cheek@uscg.mil Surface Forces Logistics Center Procurement Branch 2/LREPL 2401 Hawkins Point Road Baltimore MD 21226

HSCG40-11-R-30097

Toni Cheek Toni.J.Cheek@uscg.mil

1 - 1A 2 - 41 44 - 45 46 - 48 49 - 51 52 - 53 67

64 - 66

54 - 57

410 7626830

US Coast Guard Yard PO Box 4122 Chesapeake, VA 23327-4122

JoAnn T. Yamane

90 calendar days

59 - 63

SECTION B – SUPPLIES OR SERVICES AND PRICES

BASE YEAR – Mandatory Items

CLIN Item Description Est.

Qty U/I Unit Cost Total Cost

B.0.1 Initial Receiving Report IAW with Paragraph 3.2.1 2 EA $________ $__________

B.0.2 Disassembly Condition, Dirty Inspection Report IAW with paragraph 3.2.2 2 EA $_________ $__________

B.0.3

Disassembly Condition, Clean Inspection Report IAW with paragraph

3.2.3 2 EA $_________ $__________

B.0.4 Reassembly Report IAW paragraph

3.2.4 2 EA $_________ $__________

B.0.5 Test Report IAW with paragraph 3.2.5 2 EA $_________ $__________

B.0.6 OEM Summary Report IAW paragraph

3.2.6 2 EA $___NSP*___ $___NSP___

B.0.7 GFP/GFM Report IAW paragraph 3.2.7 2 EA $_________ $__________

B.0.8 Warranty Report IAW paragraph 3.2.8 1 EA $_________ $_________

B.0.9 Photo Documentation IAW paragraph

3.3 2 EA $_________ $_________

B.0.10 Data File preliminary and final version IAW paragraph 3.4 1 EA $___NSP___ $___NSP___

B.0.11 Initial Receipt of Turbine IAW paragraph 3.5 2 EA $_________ $_________

B.0.12 Initial Receipt of N3 Gearbox IAW paragraph 3.5.4 1 EA $_________ $_________

B.0.13 Disassembly for Dirty Inspection of Free Turbine IAW paragraph 3.6 2 EA $_________ $_________

B.0.14 Disassembly for Dirty Inspection of N3 Gearbox IAW paragraph 3.6.1 1 EA $_________ $_________

B.0.15 Disassembly Inspection for Final Condition of Free Turbine IAW 3.7 2 EA $_________ $_________

B.0.16 Disassembly Inspection for Final Condition of N3 Gearbox IAW 3.7.1 1 EA $_________ $_________

B.0.17 Expendable/Consumable Parts Kit IAW paragraph 3.9.1 2 EA $_________ $_________

B.0.18 Reassemble Free Turbine IAW paragraph 3.10 2 EA $_________ $_________

B.0.19 Reassemble N3 Gearbox IAW paragraph 3.10.1 1 EA $_________ $_________

B.0.20 Overhaul Free Turbine IAW paragraph

3.11 2 EA $___NSP___ $___NSP___

B.0.21 Overhaul N3 Gearbox IAW paragraph

3.11.1 1 EA $___NSP___ $___NSP___

B.0.22 Reassemble/return un-repairable Free Turbine IAW paragraph 3.11.2 1 EA $_________ $_________

B.0.23 Performance testing of Free Turbine IAW paragraph 3.12 2 EA $_________ $_________

B.0.24 OEM Representative IAW paragraph

3.13 1 EA $___NSP___ $___NSP___

B.0.25 Free Turbine Log Book IAW paragraph

3.14 2 EA $___NSP___ $___NSP___

B.0.26 Warranty IAW paragraph 3.15 1 EA $___NSP___ $___NSP___

B.0.27

Contractor’s Field Service Representative IAW paragraph 3.16 (Daily Flat Rate) 16 $_________ $_________

B.0.28 Quality Control Program IAW paragraph 4.3 1 EA $___NSP___ $___NSP___

B.0.29 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.0.30

Subcontracting Summary Report (SF 294), in accordance with Attachment

J.5. 1 EA $___NSP___ $___NSP___

B.0.31

Subcontracting Summary Report (SF 295), in accordance with Attachment

J.6. 1 EA $___NSP___ $___NSP___

B.0.32

Government Property Reports, DHS Form 700-05, in accordance with Section H (Attachment J.4) 1 EA $___NSP___ $___NSP___

B.0.33

Preservation, Packing, Marking, Warning Tag & shipping Free Turbine IAW paragraph 5.0 2 EA $_________ $_________

B.0.34

Preservation, Packing, Marking, Warning Tag & shipping N3 Gearbox IAW paragraph 5.2.1 1 EA $_________ $_________

B.0.35 Certificate of Conformance IAW paragraph 3.1.7 3 EA $___NSP___ $___NSP___

*NSP- Not separately priced items. Costs associated with these items should be incorporated within the costs to overhaul/repair.

BASE YEAR – Contingency Items

Qty U/I Unit Cost Total Cost

B.0.36 Un-stack Free Turbine Rotor IAW paragraph 3.8.1 2 EA $_________ $_________

B.0.37

De-blade & re-blade 1st stage turbine disk including all expendables & balance unit & blades IAW paragraph 3.8 2 SE $_________ $_________

B.0.38

De-blade & re-blade 2nd stage turbine disk including all expendables & balance unit & blades IAW paragraph 3.8 2 SE $_________ $_________

B.0.39 Clean, inspect, NDT 1st stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.0.40 Clean, inspect, NDT 2nd stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.0.41 Clean, inspect, NDT 1st stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.0.42 Clean, inspect, NDT 2nd stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.0.43 Clean, inspect, NDT 1st stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.0.44 Clean, inspect, NDT 2nd stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.0.45 1st stage blade class I repair IAW paragraph 3.8.3.a 30 EA $_________ $_________

B.0.46 1st stage blade class II repair IAW paragraph 3.8.3.b 15 EA $_________ $_________

B.0.47 1st stage blade class III repair IAW paragraph 3.8.3.c 10 EA $_________ $_________

B.0.48 1st stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.0.49 2nd stage blade class I repair IAW paragraph 3.8.3.a 25 EA $_________ $_________

B.0.50 2nd stage blade class II repair IAW paragraph 3.8.3.b 10 EA $_________ $_________

B.0.51 2nd stage blade class III repair IAW paragraph 3.8.3.c 5 EA $_________ $_________

B.0.52 2nd stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.0.53 1st stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.0.54 1st stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.0.55 1st stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.0.56 2nd stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.0.57 2nd stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.0.58 2nd stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.0.59 #7 carbon seal overhaul IAW OEM standard practices 2 EA $_________ $_________

B.0.60 #8 carbon seal overhaul IAW OEM standard practices 2 EA $_________ $_________

B.0.61 #7 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.0.62 #8 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.0.63 Service Bulletin 435 2 EA $_________ $_________ B.0.64 Service Bulletin 491 2 EA $_________ $_________ B.0.65 Service Bulletin 528 Rev A 2 EA $_________ $_________ B.0.66 Service Bulletin 71B18 2 EA $_________ $_________ B.0.67 Service Bulletin 72B05 2 EA $_________ $_________ B.0.68 Service Bulletin 72B12 2 EA $_________ $_________ B.0.69 Service Bulletin 72B22 2 EA $_________ $_________ B.0.70 Service Bulletin 72B23 2 EA $_________ $_________ B.0.71 Service Bulletin 72B30 2 EA $_________ $_________ B.0.72 Service Bulletin 72B33 2 EA $_________ $_________ B.0.73 Service Bulletin 73B01 2 EA $_________ $_________ B.0.74 Service Bulletin 73B26 2 EA $_________ $_________ B.0.75 Service Bulletin 73B32 2 EA $_________ $_________ B.0.76 Service Bulletin 73B35 2 EA $_________ $_________ B.0.77 Service Bulletin 75B07 2 EA $_________ $_________ B.0.78 Service Bulletin 77B03 2 EA $_________ $_________ B.0.79 Service Bulletin 81B03 Rev A 2 EA $_________ $_________ B.0.80 Service Bulletin 81B17 Rev A 2 EA $_________ $_________ B.0.81 Service Bulletin 81B22 Sup 1 2 EA $_________ $_________ B.0.82 Service Bulletin 83B09 2 EA $_________ $_________ B.0.83 Service Bulletin 84B06 Rev B 2 EA $_________ $_________ B.0.84 Service Bulletin 85B04 2 EA $_________ $_________ B.0.85 Service Bulletin 85B07 2 EA $_________ $_________ B.0.86 Service Bulletin 90B03 Rev B 2 EA $_________ $_________ B.0.87 Service Bulletin 92B16 Rev B 2 EA $_________ $_________ B.0.88 Service Bulletin 93B07 2 EA $_________ $_________ B.0.89 Service Bulletin 02B04 2 EA $_________ $_________ B.0.90 Service Bulletin 02B06 2 EA $_________ $_________ B.0.91 Joint Venture Service Bulletin 06-02 2 EA $_________ $_________

Miscellaneous Contingency Repair Rates

B.0.92 During the performance of the contract additional repairs and/or free turbine modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during free turbine overhaul. As a result, offers must provide a loaded composite hourly rate and profit, including G&A and overhead, for each labor category listed below and if appropriate, material handling rate/cost [see (h) below].

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial free turbine condition report for the repair, Section C and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be used against negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if appropriate. All miscellaneous contingency parts required for the repair of the power turbine/gearbox (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as Government Furnished Property. In the event the contractor or the government furnishes the parts, the material-handling rate shown below shall apply.

CLIN Labor Description Hourly Rate Est. Hours* Total

B.0.92.A. Master Mechanic $_________ 100 $_________

B.0.92.B Journeymen Mechanic $_________ 100 $_________

CLIN Description Percent Est. Amount* Total

B.0.92.C Material Handling Costs Markup in percent ________% $1,000.00 $_________

*Estimated hours and material amounts are for evaluation purposes only.

The material handling costs specified by the contractor shall include only costs clearly excluded from the labor-hour rate. Material handling costs may include all appropriate indirect costs allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. In the event that the power turbine is found to be not repairable, the contractor shall notify the Contracting Officer within 24 hours of discovery for further instructions.

Contingency Parts

All parts shall meet the requirements set forth in the specification and include all applicable service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1 (b) of the specification, which determines the practices used to recondition all parts.

a) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

b) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

c) The Government reserves the right to provide any of the contingency items as Government Furnished

Property (GFP). In the event this occurs, the material handling rate shown under CLIN B.0.92 (C), shall apply.

In the event that the contractor is operating in an emergency mode, due to time frame constraints, the government shall be allowed a 10% (percent) core value on all exchanged items. This core value shall be deducted from the serviceable rebuilt government part price, as priced in the schedule.

Instructions for pricing the contingency parts:

a) All prices are for “reconditioned” parts.

b) The Contractor may price and supply an alternate part number as long as the form, fit and function are the same and the quality is equal to or greater than the listed part number.

CLIN Part # Description

Qty. Unit Cost Total Cost

B.0.93 1044388 Air Seal 1 $_________ $_________ B.0.94 1048324 Bearing 2 $_________ $_________

B.0.95 1058819- 500 Air Seal 2 $_________ $_________

B.0.96 1070295-

Duct, Outer Front Inlet 1 $_________ $_________

B.0.97 1070819 Pump, Lube Oil 1 $_________ $_________ B.0.98 1070875 Bearing, Ball 1 $_________ $_________ B.0.99 1071520 Gearshaft 1 $_________ $_________ B.0.100 1071627 Seal-Face #7 1 $_________ $_________ B.0.101 1071628 Seal-Face #8 1 $_________ $_________ B.0.102 1072031 Nozzle 1 $_________ $_________ B.0.103 1073511 Bearing #7 1 $_________ $_________ B.0.104 453654 Seal 1 $_________ $_________ B.0.105 464848 Tube 1 $_________ $_________ B.0.106 464852 Pump 1 $_________ $_________ B.0.107 464858 Gear 1 $_________ $_________ B.0.108 464864 Gear 1 $_________ $_________ B.0.109 464865 Gear 1 $_________ $_________ B.0.110 466513 Manifold 1 $_________ $_________ B.0.111 466618 Gear 1 $_________ $_________

B.0.112 466883

Shaft, N3 Gearbox Drive, Outer 1 $_________ $_________

B.0.113 466884

Shaft, N3 Gearbox Drive, Inner 1 $_________ $_________

B.0.114 482220 Seat, #8 Bearing Seal 1 $_________ $_________

B.0.115 482828 Seat, #8 Bearing Seal 1 $_________ $_________

B.0.116 483453 Seal Ring Holder #7 Bearing 1 $_________ $_________

B.0.117 483480 Seat-#7 Bearing Seal 1 $_________ $_________

B.0.118 483715 #7 Bearing Housing 1 $_________ $_________

B.0.119 491411 Pump, #8 Scavenge 1 $_________ $_________

B.0.120 504039 Gearshaft, Bevel, N3 Gearbox 1 $_________ $_________

B.0.121 504040 Gearshaft, Bevel N3 Gearbox 1 $_________ $_________

B.0.122 530928 Coupling, N3 Gearbox 1 $_________ $_________

B.0.123 530933 Coupling, N3 Gearbox 1 $_________ $_________

B.0.124 530934

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.0.125 530935

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.0.126 530938 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.0.127 531350 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.0.128 541192

Connector- Assembly of #8 Bearing 1 $_________ $_________

B.0.129 547594

Heat Shield Assembly, #7 Bearing 1 $_________ $_________

B.0.130 556557 Cover, Inlet 1 $_________ $_________

B.0.131 564029 Nozzle Assembly, #7 Bearing 1 $_________ $_________

B.0.132 567774 Seal Support, #7 Bearing 1 $_________ $_________

B.0.133 567780 Support 1 $_________ $_________

B.0.134 567785 Seal Ring Holder #8 Bearing 1 $_________ $_________

B.0.135 572219 Ring Segment, 2nd Stage 1 $_________ $_________

B.0.136 577454 Manifold, #7 Bearing Inlet 1 $_________ $_________

B.0.137 577445 Tube, #7 Bearing Assembly 1 $_________ $_________

B.0.138 586611 Valve Assembly, Pressure Relief 1 $_________ $_________

B.0.139 587499 Seal Face, 1.828 X 2.877 X 0.62 1 $_________ $_________

B.0.140 587513

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.0.141 587515

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.0.142 611781 Case 1 $_________ $_________

B.0.143 615049

Housing Assembly of Scavenge Pump 1 $_________ $_________

B.0.144 629503

Manifold Pressure, #7 Bearing Assembly 1 $_________ $_________

B.0.145 656303 Gear 1 $_________ $_________

B.0.146 658672 Seal (per SB 95B02) 1 $_________ $_________

B.0.147 699111 Elbow, Cooling Air Assembly 1 $_________ $_________

B.0.148 705193

Housing Assembly, N3 Gearbox 1 $_________ $_________

B.0.149 714276 Duct (1070295-

300) 1 $_________ $_________

B.0.150 716384 Tierod, Free Turbine 1 $_________ $_________

B.0.151 719320 Gearshaft Assembly, Bevel 1 $_________ $_________

FIRST OPTION YEAR – Mandatory Items

Qty U/I Unit Cost Total Cost

B.1.1 Initial Receiving Report IAW with Paragraph 3.2.1 2 EA $________ $__________

B.1.2 Disassembly Condition, Dirty Inspection Report IAW with paragraph 3.2.2 2 EA $_________ $__________

B.1.3

Disassembly Condition, Clean Inspection Report IAW with paragraph

3.2.3 2 EA $_________ $__________

B.1.4 Reassembly Report IAW paragraph

3.2.4 2 EA $_________ $__________

B.1.5 Test Report IAW with paragraph 3.2.5 2 EA $_________ $__________

B.1.6 OEM Summary Report IAW paragraph

3.2.6 2 EA $___NSP*___ $___NSP___

B.1.7 GFP/GFM Report IAW paragraph 3.2.7 2 EA $_________ $__________

B.1.8 Warranty Report IAW paragraph 3.2.8 1 EA $_________ $_________

B.1.9 Photo Documentation IAW paragraph

3.3 2 EA $_________ $_________

B.1.10 Data File preliminary and final version IAW paragraph 3.4 1 EA $___NSP___ $___NSP___

B.1.11 Initial Receipt of Turbine IAW paragraph 3.5 2 EA $_________ $_________

B.1.12 Initial Receipt of N3 Gearbox IAW paragraph 3.5.4 1 EA $_________ $_________

B.1.13 Disassembly for Dirty Inspection of Free Turbine IAW paragraph 3.6 2 EA $_________ $_________

B.1.14 Disassembly for Dirty Inspection of N3 Gearbox IAW paragraph 3.6.1 1 EA $_________ $_________

B.1.15 Disassembly Inspection for Final Condition of Free Turbine IAW 3.7 2 EA $_________ $_________

B.1.16 Disassembly Inspection for Final Condition of N3 Gearbox IAW 3.7.1 1 EA $_________ $_________

B.1.17 Expendable/Consumable Parts Kit IAW paragraph 3.9.1 2 EA $_________ $_________

B.1.18 Reassemble Free Turbine IAW paragraph 3.10 2 EA $_________ $_________

B.1.19 Reassemble N3 Gearbox IAW paragraph 3.10.1 1 EA $_________ $_________

B.1.20 Overhaul Free Turbine IAW paragraph

3.11 2 EA $___NSP___ $___NSP___

B.1.21 Overhaul N3 Gearbox IAW paragraph

3.11.1 1 EA $___NSP___ $___NSP___

B.1.22 Reassemble/return un-repairable Free Turbine IAW paragraph 3.11.2 1 EA $_________ $_________

B.1.23 Performance testing of Free Turbine IAW paragraph 3.12 2 EA $_________ $_________

B.1.24 OEM Representative IAW paragraph

3.13 1 EA $___NSP___ $___NSP___

B.1.25 Free Turbine Log Book IAW paragraph

3.14 2 EA $___NSP___ $___NSP___

B.1.26 Warranty IAW paragraph 3.15 1 EA $___NSP___ $___NSP___

B.1.27

Contractor’s Field Service Representative IAW paragraph 3.16 (Daily Flat Rate) 16 $_________ $_________

B.1.28 Quality Control Program IAW paragraph 4.3 1 EA $___NSP___ $___NSP___

B.1.29 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.1.30

Subcontracting Summary Report (SF 294), in accordance with Attachment

J.5. 1 EA $___NSP___ $___NSP___

B.1.31

Subcontracting Summary Report (SF 295), in accordance with Attachment

J.6. 1 EA $___NSP___ $___NSP___

B.1.32

Government Property Reports, DHS Form 700-05, in accordance with Section H (Attachment J.4) 1 EA $___NSP___ $___NSP___

B.1.33

Preservation, Packing, Marking, Warning Tag & shipping Free Turbine IAW paragraph 5.0 2 EA $_________ $_________

B.1.34

Preservation, Packing, Marking, Warning Tag & shipping N3 Gearbox IAW paragraph 5.2.1 1 EA $_________ $_________

B.1.35

*NSP- Not separately priced items. Costs associated with these items should be incorporated within the

FIRST OPTION YEAR – Contingency Items

Qty U/I Unit Cost Total Cost

B.1.36 Un-stack Free Turbine Rotor IAW paragraph 3.8.1 2 EA $_________ $_________

B.1.37

De-blade & re-blade 1st stage turbine disk including all expendables &

B.1.38

De-blade & re-blade 2nd stage turbine disk including all expendables & balance unit & blades IAW paragraph 3.8 2 SE $_________ $_________

B.1.39 Clean, inspect, NDT 1st stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.1.40 Clean, inspect, NDT 2nd stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.1.41 Clean, inspect, NDT 1st stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.1.42 Clean, inspect, NDT 2nd stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.1.43 Clean, inspect, NDT 1st stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.1.44 Clean, inspect, NDT 2nd stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.1.45 1st stage blade class I repair IAW paragraph 3.8.3.a 30 EA $_________ $_________

B.1.46 1st stage blade class II repair IAW paragraph 3.8.3.b 15 EA $_________ $_________

B.1.47 1st stage blade class III repair IAW paragraph 3.8.3.c 10 EA $_________ $_________

B.1.48 1st stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.1.49 2nd stage blade class I repair IAW paragraph 3.8.3.a 25 EA $_________ $_________

B.1.50 2nd stage blade class II repair IAW paragraph 3.8.3.b 10 EA $_________ $_________

B.1.51 2nd stage blade class III repair IAW paragraph 3.8.3.c 5 EA $_________ $_________

B.1.52 2nd stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.1.53 1st stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.1.54 1st stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.1.55 1st stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.1.56 2nd stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.1.57 2nd stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.1.58 2nd stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.1.59 #7 carbon seal overhaul IAW OEM standard practices 2 EA $_________ $_________

B.1.60

B.1.61 #7 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.1.62 #8 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.1.63 Service Bulletin 435 2 EA $_________ $_________ B.1.64 Service Bulletin 491 2 EA $_________ $_________ B.1.65 Service Bulletin 528 Rev A 2 EA $_________ $_________ B.1.66 Service Bulletin 71B18 2 EA $_________ $_________ B.1.67 Service Bulletin 72B05 2 EA $_________ $_________ B.1.68 Service Bulletin 72B12 2 EA $_________ $_________ B.1.69 Service Bulletin 72B22 2 EA $_________ $_________ B.1.70 Service Bulletin 72B23 2 EA $_________ $_________ B.1.71 Service Bulletin 72B30 2 EA $_________ $_________ B.1.72 Service Bulletin 72B33 2 EA $_________ $_________ B.1.73 Service Bulletin 73B01 2 EA $_________ $_________ B.1.74 Service Bulletin 73B26 2 EA $_________ $_________ B.1.75 Service Bulletin 73B32 2 EA $_________ $_________ B.1.76 Service Bulletin 73B35 2 EA $_________ $_________ B.1.77 Service Bulletin 75B07 2 EA $_________ $_________ B.1.78 Service Bulletin 77B03 2 EA $_________ $_________ B.1.79 Service Bulletin 81B03 Rev A 2 EA $_________ $_________ B.1.80 Service Bulletin 81B17 Rev A 2 EA $_________ $_________ B.1.81 Service Bulletin 81B22 Sup 1 2 EA $_________ $_________ B.1.82 Service Bulletin 83B09 2 EA $_________ $_________ B.1.83 Service Bulletin 84B06 Rev B 2 EA $_________ $_________ B.1.84 Service Bulletin 85B04 2 EA $_________ $_________ B.1.85 Service Bulletin 85B07 2 EA $_________ $_________ B.1.86 Service Bulletin 90B03 Rev B 2 EA $_________ $_________ B.1.87 Service Bulletin 92B16 Rev B 2 EA $_________ $_________ B.1.88 Service Bulletin 93B07 2 EA $_________ $_________ B.1.89 Service Bulletin 02B04 2 EA $_________ $_________ B.1.90 Service Bulletin 02B06 2 EA $_________ $_________ B.1.91 Joint Venture Service Bulletin 06-02 2 EA $_________ $_________

B.1.92 During the performance of the contract additional repairs and/or free turbine modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during free turbine overhaul. As a result, offers must provide a loaded composite

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial free turbine condition report for the repair, Section C and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be used against negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if appropriate. All miscellaneous contingency parts required for the repair of the power turbine/gearbox (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as Government Furnished Property. In the event the contractor or the government furnishes the parts, the material-handling rate shown below shall apply.

CLIN Labor Description Hourly Rate Est. Hours* Total

B.1.92.A. Master Mechanic $_________ 100 $_________

B.1.92.B Journeymen Mechanic $_________ 100 $_________

B.1.92.C Material Handling Costs Markup in percent ________% $1,000.00 $_________

*Estimated hours and material amounts are for evaluation purposes only.

The material handling costs specified by the contractor shall include only costs clearly excluded from the labor-hour rate. Material handling costs may include all appropriate indirect costs allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. In the event that the power turbine is found to be not repairable, the contractor shall notify the Contracting Officer within 24 hours of discovery for further

All parts shall meet the requirements set forth in the specification and include all applicable service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1 (b) of the specification, which determines the practices used to recondition all parts.

d) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

e) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

f) The Government reserves the right to provide any of the contingency items as Government Furnished

Property (GFP). In the event this occurs, the material handling rate shown under CLIN B.0.92 (C), shall apply.

In the event that the contractor is operating in an emergency mode, due to time frame constraints, the

c) All prices are for “reconditioned” parts.

d) The Contractor may price and supply an alternate part number as long as the form, fit and

Qty. Unit Cost Total Cost

B.1.93 1044388 Air Seal 1 $_________ $_________ B.1.94 1048324 Bearing 2 $_________ $_________

B.1.95 1058819- 500 Air Seal 2 $_________ $_________

B.1.96 1070295-

Duct, Outer Front Inlet 1 $_________ $_________

B.1.97 1070819 Pump, Lube Oil 1 $_________ $_________ B.1.98 1070875 Bearing, Ball 1 $_________ $_________ B.1.99 1071520 Gearshaft 1 $_________ $_________ B.1.100 1071627 Seal-Face #7 1 $_________ $_________ B.1.101 1071628 Seal-Face #8 1 $_________ $_________ B.1.102 1072031 Nozzle 1 $_________ $_________ B.1.103 1073511 Bearing #7 1 $_________ $_________ B.1.104 453654 Seal 1 $_________ $_________ B.1.105 464848 Tube 1 $_________ $_________ B.1.106 464852 Pump 1 $_________ $_________ B.1.107 464858 Gear 1 $_________ $_________ B.1.108 464864 Gear 1 $_________ $_________ B.1.109 464865 Gear 1 $_________ $_________ B.1.110 466513 Manifold 1 $_________ $_________ B.1.111 466618 Gear 1 $_________ $_________

B.1.112 466883

Shaft, N3 Gearbox Drive, Outer 1 $_________ $_________

B.1.113 466884

Shaft, N3 Gearbox Drive, Inner 1 $_________ $_________

B.1.114 482220 Seat, #8 Bearing Seal 1 $_________ $_________

B.1.115 482828 Seat, #8 Bearing Seal 1 $_________ $_________

B.1.116 483453 Seal Ring Holder #7 Bearing 1 $_________ $_________

B.1.117 483480

B.1.118 483715 #7 Bearing Housing 1 $_________ $_________

B.1.119 491411 Pump, #8 Scavenge 1 $_________ $_________

B.1.120 504039 Gearshaft, Bevel, N3 Gearbox 1 $_________ $_________

B.1.121 504040 Gearshaft, Bevel N3 Gearbox 1 $_________ $_________

B.1.122 530928 Coupling, N3 Gearbox 1 $_________ $_________

B.1.123 530933 Coupling, N3 Gearbox 1 $_________ $_________

B.1.124 530934

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.1.125 530935

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.1.126 530938 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.1.127 531350 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.1.128 541192

Connector- Assembly of #8 Bearing 1 $_________ $_________

B.1.129 547594

Heat Shield Assembly, #7 Bearing 1 $_________ $_________

B.1.130 556557 Cover, Inlet 1 $_________ $_________

B.1.131 564029 Nozzle Assembly, #7 Bearing 1 $_________ $_________

B.1.132 567774 Seal Support, #7 Bearing 1 $_________ $_________

B.1.133 567780 Support 1 $_________ $_________

B.1.134 567785 Seal Ring Holder #8 Bearing 1 $_________ $_________

B.1.135 572219 Ring Segment, 2nd Stage 1 $_________ $_________

B.1.136 577454 Manifold, #7 Bearing Inlet 1 $_________ $_________

B.1.137 577445 Tube, #7 Bearing Assembly 1 $_________ $_________

B.1.138 586611 Valve Assembly, Pressure Relief 1 $_________ $_________

B.1.139 587499

B.1.140 587513

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.1.141 587515

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.1.142 611781 Case 1 $_________ $_________

B.1.143 615049

Housing Assembly of Scavenge Pump 1 $_________ $_________

B.1.144 629503

Manifold Pressure, #7 Bearing Assembly 1 $_________ $_________

B.1.145 656303 Gear 1 $_________ $_________

B.1.146 658672 Seal (per SB 95B02) 1 $_________ $_________

B.1.147 699111 Elbow, Cooling Air Assembly 1 $_________ $_________

B.1.148 705193

Housing Assembly, N3 Gearbox 1 $_________ $_________

B.1.149 714276 Duct (1070295-

300) 1 $_________ $_________

B.1.150 716384 Tierod, Free Turbine 1 $_________ $_________

B.1.151 719320

SECOND OPTION YEAR – Mandatory Items

Qty U/I Unit Cost Total Cost

B.2.1 Initial Receiving Report IAW with Paragraph 3.2.1 2 EA $________ $__________

B.2.2 Disassembly Condition, Dirty Inspection Report IAW with paragraph 3.2.2 2 EA $_________ $__________

B.2.3

Disassembly Condition, Clean Inspection Report IAW with paragraph

3.2.3 2 EA $_________ $__________

B.2.4 Reassembly Report IAW paragraph

3.2.4 2 EA $_________ $__________

B.2.5 Test Report IAW with paragraph 3.2.5 2 EA $_________ $__________

B.2.6 OEM Summary Report IAW paragraph

3.2.6 2 EA $___NSP*___ $___NSP___

B.2.7 GFP/GFM Report IAW paragraph 3.2.7 2 EA $_________ $__________

B.2.8 Warranty Report IAW paragraph 3.2.8 1 EA $_________ $_________

B.2.9 Photo Documentation IAW paragraph

3.3 2 EA $_________ $_________

B.2.10 Data File preliminary and final version IAW paragraph 3.4 1 EA $___NSP___ $___NSP___

B.2.11 Initial Receipt of Turbine IAW paragraph 3.5 2 EA $_________ $_________

B.2.12 Initial Receipt of N3 Gearbox IAW paragraph 3.5.4 1 EA $_________ $_________

B.2.13 Disassembly for Dirty Inspection of Free Turbine IAW paragraph 3.6 2 EA $_________ $_________

B.2.14 Disassembly for Dirty Inspection of N3 Gearbox IAW paragraph 3.6.1 1 EA $_________ $_________

B.2.15 Disassembly Inspection for Final Condition of Free Turbine IAW 3.7 2 EA $_________ $_________

B.2.16 Disassembly Inspection for Final Condition of N3 Gearbox IAW 3.7.1 1 EA $_________ $_________

B.2.17 Expendable/Consumable Parts Kit IAW paragraph 3.9.1 2 EA $_________ $_________

B.2.18 Reassemble Free Turbine IAW paragraph 3.10 2 EA $_________ $_________

B.2.19 Reassemble N3 Gearbox IAW paragraph 3.10.1 1 EA $_________ $_________

B.2.20 Overhaul Free Turbine IAW paragraph

3.11 2 EA $___NSP___ $___NSP___

B.2.21

B.2.22 Reassemble/return un-repairable Free Turbine IAW paragraph 3.11.2 1 EA $_________ $_________

B.2.23 Performance testing of Free Turbine IAW paragraph 3.12 2 EA $_________ $_________

B.2.24 OEM Representative IAW paragraph

3.13 1 EA $___NSP___ $___NSP___

B.2.25 Free Turbine Log Book IAW paragraph

3.14 2 EA $___NSP___ $___NSP___

B.2.26 Warranty IAW paragraph 3.15 1 EA $___NSP___ $___NSP___

B.2.27

Contractor’s Field Service Representative IAW paragraph 3.16 (Daily Flat Rate) 16 $_________ $_________

B.2.28 Quality Control Program IAW paragraph 4.3 1 EA $___NSP___ $___NSP___

B.2.29 Calibration System IAW paragraph 4.4 1 EA $___NSP___ $___NSP___

B.2.30

Subcontracting Summary Report (SF 294), in accordance with Attachment

J.5. 1 EA $___NSP___ $___NSP___

B.2.31

Subcontracting Summary Report (SF 295), in accordance with Attachment

J.6. 1 EA $___NSP___ $___NSP___

B.2.32

Government Property Reports, DHS Form 700-05, in accordance with Section H (Attachment J.4) 1 EA $___NSP___ $___NSP___

B.2.33

Preservation, Packing, Marking, Warning Tag & shipping Free Turbine IAW paragraph 5.0 2 EA $_________ $_________

B.2.34

Preservation, Packing, Marking, Warning Tag & shipping N3 Gearbox IAW paragraph 5.2.1 1 EA $_________ $_________

B.2.35

*NSP- Not separately priced items. Costs associated with these items should be incorporated within the

SECOND OPTION YEAR – Contingency Items

Qty U/I Unit Cost Total Cost

B.2.36 Un-stack Free Turbine Rotor IAW paragraph 3.8.1 2 EA $_________ $_________

B.2.37

De-blade & re-blade 1st stage turbine disk including all expendables &

B.2.38

De-blade & re-blade 2nd stage turbine disk including all expendables & balance unit & blades IAW paragraph 3.8 2 SE $_________ $_________

B.2.39 Clean, inspect, NDT 1st stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.2.40 Clean, inspect, NDT 2nd stage blades IAW OEM standards (per set) 2 SE $_________ $_________

B.2.41 Clean, inspect, NDT 1st stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.2.42 Clean, inspect, NDT 2nd stage vanes IAW OEM standards (per set) 2 SE $_________ $_________

B.2.43 Clean, inspect, NDT 1st stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.2.44 Clean, inspect, NDT 2nd stage turbine disk IAW OEM standards 2 EA $_________ $_________

B.2.45 1st stage blade class I repair IAW paragraph 3.8.3.a 30 EA $_________ $_________

B.2.46 1st stage blade class II repair IAW paragraph 3.8.3.b 15 EA $_________ $_________

B.2.47 1st stage blade class III repair IAW paragraph 3.8.3.c 10 EA $_________ $_________

B.2.48 1st stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.2.49 2nd stage blade class I repair IAW paragraph 3.8.3.a 25 EA $_________ $_________

B.2.50 2nd stage blade class II repair IAW paragraph 3.8.3.b 10 EA $_________ $_________

B.2.51 2nd stage blade class III repair IAW paragraph 3.8.3.c 5 EA $_________ $_________

B.2.52 2nd stage blade class IV repair IAW paragraph 3.8.3.d 5 EA $_________ $_________

B.2.53 1st stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.2.54 1st stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.2.55 1st stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.2.56 2nd stage vane class I repair IAW paragraph 3.8.4.a 10 EA $_________ $_________

B.2.57 2nd stage vane class II repair IAW paragraph 3.8.4.b 5 EA $_________ $_________

B.2.58 2nd stage vane class III repair IAW paragraph 3.8.4.c 5 EA $_________ $_________

B.2.59 #7 carbon seal overhaul IAW OEM standard practices 2 EA $_________ $_________

B.2.60

B.2.61 #7 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.2.62 #8 bearing overhaul IAW OEM standard practices 2 EA $_________ $_________

B.2.63 Service Bulletin 435 2 EA $_________ $_________ B.2.64 Service Bulletin 491 2 EA $_________ $_________ B.2.65 Service Bulletin 528 Rev A 2 EA $_________ $_________ B.2.66 Service Bulletin 71B18 2 EA $_________ $_________ B.2.67 Service Bulletin 72B05 2 EA $_________ $_________ B.2.68 Service Bulletin 72B12 2 EA $_________ $_________ B.2.69 Service Bulletin 72B22 2 EA $_________ $_________ B.2.70 Service Bulletin 72B23 2 EA $_________ $_________ B.2.71 Service Bulletin 72B30 2 EA $_________ $_________ B.2.72 Service Bulletin 72B33 2 EA $_________ $_________ B.2.73 Service Bulletin 73B01 2 EA $_________ $_________ B.2.74 Service Bulletin 73B26 2 EA $_________ $_________ B.2.75 Service Bulletin 73B32 2 EA $_________ $_________ B.2.76 Service Bulletin 73B35 2 EA $_________ $_________ B.2.77 Service Bulletin 75B07 2 EA $_________ $_________ B.2.78 Service Bulletin 77B03 2 EA $_________ $_________ B.2.79 Service Bulletin 81B03 Rev A 2 EA $_________ $_________ B.2.80 Service Bulletin 81B17 Rev A 2 EA $_________ $_________ B.2.81 Service Bulletin 81B22 Sup 1 2 EA $_________ $_________ B.2.82 Service Bulletin 83B09 2 EA $_________ $_________ B.2.83 Service Bulletin 84B06 Rev B 2 EA $_________ $_________ B.2.84 Service Bulletin 85B04 2 EA $_________ $_________ B.2.85 Service Bulletin 85B07 2 EA $_________ $_________ B.2.86 Service Bulletin 90B03 Rev B 2 EA $_________ $_________ B.2.87 Service Bulletin 92B16 Rev B 2 EA $_________ $_________ B.2.88 Service Bulletin 93B07 2 EA $_________ $_________ B.2.89 Service Bulletin 02B04 2 EA $_________ $_________ B.2.90 Service Bulletin 02B06 2 EA $_________ $_________ B.2.91 Joint Venture Service Bulletin 06-02 2 EA $_________ $_________

B.2.92 During the performance of the contract additional repairs and/or free turbine modifications not specifically addressed in the schedule may be required by the contract under a loaded composite hourly labor rate arrangement during free turbine overhaul. As a result, offers must provide a loaded composite

Labor hours proposed by the contractor to accomplish repairs and/or modifications shall be itemized in the initial free turbine condition report for the repair, Section C and shall be subject to negotiation and separate delivery order modification. The rate provided herein will be used against negotiated labor hours to arrive at a total price to accomplish such repair and/or modifications(s).

In addition, required parts will be paid for at cost, plus application of the material handling cost, if appropriate. All miscellaneous contingency parts required for the repair of the power turbine/gearbox (whether reconditioned or new) shall be reimbursed at actual costs. The Contractor shall provide full supporting data with submission of each condition report to substantiate claim for material. The Government reserves the right to provide any of the parts or components as Government Furnished Property. In the event the contractor or the government furnishes the parts, the material-handling rate shown below shall apply.

CLIN Labor Description Hourly Rate Est. Hours* Total

B.2.92.A. Master Mechanic $_________ 100 $_________

B.2.92.B Journeymen Mechanic $_________ 100 $_________

B.2.92.C Material Handling Costs Markup in percent ________% $1,000.00 $_________

*Estimated hours and material amounts are for evaluation purposes only.

The material handling costs specified by the contractor shall include only costs clearly excluded from the labor-hour rate. Material handling costs may include all appropriate indirect costs allocated to direct materials in accordance with the contractor’s usual accounting procedures consistent with FAR Part 31.

The material handling charge shall include the costs associated with the contractor’s inspection of Government furnished property.

NOTE: The contractor shall not begin any repairs or component replacement until authorized, in writing, by the Contracting Officer or his authorized representative. In the event that the power turbine is found to be not repairable, the contractor shall notify the Contracting Officer within 24 hours of discovery for further

All parts shall meet the requirements set forth in the specification and include all applicable service bulletins as listed in the specification. All items listed in the contingency items shall be “reconditioned” parts and must have the same useful life as new parts. Refer to paragraph 2.3.1 (b) of the specification, which determines the practices used to recondition all parts.

g) The prices quoted for contingency items (other than Service Bulletins) shall be only the price of the material.

h) The Government reserves the right to require the contractor to replace up to a complete set of blades for each stage at the unit price provided.

i) The Government reserves the right to provide any of the contingency items as Government Furnished

Property (GFP). In the event this occurs, the material handling rate shown under CLIN B.0.92 (C), shall apply.

In the event that the contractor is operating in an emergency mode, due to time frame constraints, the

e) All prices are for “reconditioned” parts.

f) The Contractor may price and supply an alternate part number as long as the form, fit and

Qty. Unit Cost Total Cost

B.2.93 1044388 Air Seal 1 $_________ $_________ B.2.94 1048324 Bearing 2 $_________ $_________

B.2.95 1058819- 500 Air Seal 2 $_________ $_________

B.2.96 1070295-

Duct, Outer Front Inlet 1 $_________ $_________

B.2.97 1070819 Pump, Lube Oil 1 $_________ $_________ B.2.98 1070875 Bearing, Ball 1 $_________ $_________ B.2.99 1071520 Gearshaft 1 $_________ $_________ B.2.100 1071627 Seal-Face #7 1 $_________ $_________ B.2.101 1071628 Seal-Face #8 1 $_________ $_________ B.2.102 1072031 Nozzle 1 $_________ $_________ B.2.103 1073511 Bearing #7 1 $_________ $_________ B.2.104 453654 Seal 1 $_________ $_________ B.2.105 464848 Tube 1 $_________ $_________ B.2.106 464852 Pump 1 $_________ $_________ B.2.107 464858 Gear 1 $_________ $_________ B.2.108 464864 Gear 1 $_________ $_________ B.2.109 464865 Gear 1 $_________ $_________ B.2.110 466513 Manifold 1 $_________ $_________ B.2.111 466618 Gear 1 $_________ $_________

B.2.112 466883

Shaft, N3 Gearbox Drive, Outer 1 $_________ $_________

B.2.113 466884

Shaft, N3 Gearbox Drive, Inner 1 $_________ $_________

B.2.114 482220 Seat, #8 Bearing Seal 1 $_________ $_________

B.2.115 482828 Seat, #8 Bearing Seal 1 $_________ $_________

B.2.116 483453 Seal Ring Holder #7 Bearing 1 $_________ $_________

B.2.117 483480

B.2.118 483715 #7 Bearing Housing 1 $_________ $_________

B.2.119 491411 Pump, #8 Scavenge 1 $_________ $_________

B.2.120 504039 Gearshaft, Bevel, N3 Gearbox 1 $_________ $_________

B.2.121 504040 Gearshaft, Bevel N3 Gearbox 1 $_________ $_________

B.2.122 530928 Coupling, N3 Gearbox 1 $_________ $_________

B.2.123 530933 Coupling, N3 Gearbox 1 $_________ $_________

B.2.124 530934

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.2.125 530935

Housing, N3 Gearbox Drive Bearing 1 $_________ $_________

B.2.126 530938 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.2.127 531350 Gearshaft, Spur, N3 Gearbox 1 $_________ $_________

B.2.128 541192

Connector- Assembly of #8 Bearing 1 $_________ $_________

B.2.129 547594

Heat Shield Assembly, #7 Bearing 1 $_________ $_________

B.2.130 556557 Cover, Inlet 1 $_________ $_________

B.2.131 564029 Nozzle Assembly, #7 Bearing 1 $_________ $_________

B.2.132 567774 Seal Support, #7 Bearing 1 $_________ $_________

B.2.133 567780 Support 1 $_________ $_________

B.2.134 567785 Seal Ring Holder #8 Bearing 1 $_________ $_________

B.2.135 572219 Ring Segment, 2nd Stage 1 $_________ $_________

B.2.136 577454 Manifold, #7 Bearing Inlet 1 $_________ $_________

B.2.137 577445 Tube, #7 Bearing Assembly 1 $_________ $_________

B.2.138 586611 Valve Assembly, Pressure Relief 1 $_________ $_________

B.2.139 587499

B.2.140 587513

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.2.141 587515

Gearshaft Spur Assembly, N3 Gearbox 1 $_________ $_________

B.2.142 611781 Case 1 $_________ $_________

B.2.143 615049

Housing Assembly of Scavenge Pump 1 $_________ $_________

B.2.144 629503

Manifold Pressure, #7 Bearing Assembly 1 $_________ $_________

B.2.145 656303 Gear 1 $_________ $_________

B.2.146 658672 Seal (per SB 95B02) 1 $_________ $_________

B.2.147 699111 Elbow, Cooling Air Assembly 1 $_________ $_________

B.2.148 705193

Housing Assembly, N3 Gearbox 1 $_________ $_________

B.2.149 714276 Duct (1070295-

300) 1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .