49 FT BUSL 111510.pdf
PDF 10 MB Posted
- Attached to
- DRY-DOCK & REPAIR, BUSL 49426, USCG ANT MOBILE
- Solicitation number
- HSCG40-11-Q-P30C59
About this file
SPECIFICATION PACKAGE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0002.pdf | ||
| Amendment0001.pdf | ||
| SCHEDULEofITEMS.xlsx | XLSX spreadsheet | |
| RFQ ANT MOBILE BUSL 49462 11 DD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(11/15/2010 Rev-0)
USCG ANT MOBILE, AL
49426 BUOY UTILITY STERN LOADING BOAT
REPAIR SPECIFICATION 2011
Spec Writers:
Bruce Brightman Timothy O’Brien
Commander Surface Forces Logistics Center 300 E Main Street, Suite (550) Norfolk, VA 23510-9111 i
TABLE OF CONTENTS
Work Item Title Page
List of Sketches vi
Revisions Record vii
List of Applicable References viii
List of Government/industrial-furnished Property xiii
List of Critical Inspection Items xv
Specification Feedback xvi
Principal Characteristics xvii
General Requirements xviii
WORK ITEM 1: Provide General Welding 1
WORK ITEM 2: Lazarette QAWTH (TCTO TB6010.B) 2
WORK ITEM 3: Inspect Rub Rail Fender 11
WORK ITEM 4: Remove and Install Rub Rail Fender 13
WORK ITEM 5: Perform 100 Ultrasonic Testing (UT) Shots 15
WORK ITEM 6: Inspect Bilges 17
WORK ITEM 7: Preserve Bilges 19
WORK ITEM 8: Clean and Inspect Diesel Fuel Tank 21
WORK ITEM 9: Pressure Test Inaccessible Void 23
WORK ITEM 10: Inspect Accessible Spaces 25
WORK ITEM 11: Inspect Accessible Voids 27
WORK ITEM 12: Inspect Sea Strainer 28
WORK ITEM 13: Remove and Install Sea Strainer 30
WORK ITEM 14: Inspect Sea Chest 32
49426 REPAIR SPECIFICATION 2011
Page ii (Rev-0)
WORK ITEM 15: Remove and Install Sea Chest 34
WORK ITEM 16: Inspect Watertight Closures 35
WORK ITEM 17: Remove and Install Watertight Closures 37
WORK ITEM 18: Inspect Weather-tight Closures 39
WORK ITEM 19: Remove and Install Weather-tight Closures 41
WORK ITEM 20: Inspect Mast 43
WORK ITEM 21: Remove and Install Mast 44
WORK ITEM 22: Renew Batteries 46
WORK ITEM 23: Remove and Install Engine 47
WORK ITEM 24: Align Main Diesel Engine 49
WORK ITEM 25: Modify J/W Crossover Piping (TCTO TA5020) 50
WORK ITEM 26: Remove and Install Reduction Gear 67
WORK ITEM 27: Replace Red Gear Coupling (TCTO TA4000) 69
WORK ITEM 28: Remove Inspect and Install Propeller Shaft 81
WORK ITEM 29: Renew Propeller Shaft Seal 83
WORK ITEM 30: Remove and Install Line Cutter 85
WORK ITEM 31: Renew Shaft Log 87
WORK ITEM 32: Remove and Install Propeller Shaft Coupling 89
WORK ITEM 33: Renew Water Lubricated Bearings 91
WORK ITEM 34: Fit and Face Propeller Shaft Coupling 92
WORK ITEM 35: Remove and Install Propeller 94
WORK ITEM 36: Inspect Engine Throttle Control Cable 96
WORK ITEM 37: Inspect Engine Stop Control Cable 97
WORK ITEM 38: Renew Exhaust Muffler 98
WORK ITEM 39: Inspect Exhaust Piping 100
Page iii (Rev-0)
WORK ITEM 40: Renew Exhaust Piping 102
WORK ITEM 41: Inspect Engine Fuel Filter-Water Separator 104
WORK ITEM 42: Renew Engine Fuel Filter-Water Separator 105
WORK ITEM 43: Remove and Install SSDG 106
WORK ITEM 44: Remove and Install the SSDG Generator 108
WORK ITEM 45: Clean and Inspect SSDG Generator 110
WORK ITEM 46: Inspect Boat-Side Shore-Tie Receptacle 112
WORK ITEM 47: Remove & Install Boat-Side Shore-Tie Receptacle 114
WORK ITEM 48: Inspect Electrical Distribution Panel 115
WORK ITEM 49: Renew Isolation Transformer 116
WORK ITEM 50: Inspect Exterior Lights 117
WORK ITEM 51: Renew Searchlight 119
WORK ITEM 52: Complete EC 49 BUSL C 17, Pneumatic Horn 121
WORK ITEM 53: Remove and Install Air Horn Compressor 136
WORK ITEM 54: Remove and Install Air Horn 138
WORK ITEM 55: Inspect Standard Hoses 140
WORK ITEM 56: Inspect Non-Standard Hoses 147
WORK ITEM 57: Renew Standard Hoses 149
WORK ITEM 58: Renew Non-Standard Hoses 156
WORK ITEM 59: Inspect Piping 158
WORK ITEM 60: Inspect Interior Hull Insulation 159
WORK ITEM 61: Renew Interior Hull Insulation 160
WORK ITEM 62: Remove & Install Heating Defroster System 161
WORK ITEM 63: Inspect Air Conditioning Unit 162
WORK ITEM 64: Remove and Install Air Conditioning Unit 163
Page iv (Rev-0)
WORK ITEM 65: Renew Sea Valves 165
WORK ITEM 66: Modify Sea Water Valves (TCTO BUSL 49 TM2000) 167
WORK ITEM 67: Remove Clean and Install Cooler 182
WORK ITEM 68: Clean and Inspect Grease Trap 184
WORK ITEM 69: Test Electric Bilge Pump Float Switches 186
WORK ITEM 70: Inspect Bilge Pumps 188
WORK ITEM 71: Renew Bilge Pump 190
WORK ITEM 72: Clean and Inspect Potable Water Tanks 191
WORK ITEM 73: Preserve Potable Water Tanks 193
WORK ITEM 74: Renew Fuel Valves 195
WORK ITEM 75: Inspect and Service Air Compressor 196
WORK ITEM 76: Remove and Install Air Compressor 197
WORK ITEM 77: Hydrostatic Test CO2 Cylinders 199
WORK ITEM 78: Recharge CO2 Cylinders 201
WORK ITEM 79: Clean and Inspect Hydraulic Steering Oil Tank 202
WORK ITEM 80: Inspect Steering System 204
WORK ITEM 81: Remove Inspect and Install Rudder 206
WORK ITEM 82: Buoy Handling Equipment (Level 2) 208
WORK ITEM 83: Inspect Chain Stopper 214
WORK ITEM 84: Overhaul Chain Stopper 216
WORK ITEM 85: Inspect Deck Fittings 218
WORK ITEM 86: Provide Boat Outfit Storage 220
WORK ITEM 87: Clean and Inspect Grey Water Holding Tank 221
WORK ITEM 88: Clean and Inspect Sewage Holding Tank 223
WORK ITEM 89: Inspect Handrails 225
Page v (Rev-0)
WORK ITEM 90: Inspect Windows 227
WORK ITEM 91: Renew Window 229
WORK ITEM 92: Renew Windshield Wipers 231
WORK ITEM 93: Preserve Underwater Body 232
WORK ITEM 94: Preserve Accessible Void 234
WORK ITEM 95: Preserve Superstructure 236
WORK ITEM 96: Apply Hull Identification Markings 238
WORK ITEM 97: Preserve Deck (Buoy Deck) 239
WORK ITEM 98: Preserve Deck (Foredeck) 241
WORK ITEM 99: Preserve Freeboard 243
WORK ITEM 100: Renew Exterior Non-slip Pads 245
WORK ITEM 101: Provide Temporary Logistics 248
WORK ITEM 102: Perform Preventive Maintenance 249
WORK ITEM 103: Provide OEM Certified Technical Representative Services 250
WORK ITEM 104: Provide Routine Drydocking 251
WORK ITEM 105: Perform Casualty Repairs 253
Page vi (Rev-0)
List of Sketches
Work Item Sketch Number Page
None
Page vii (Rev-0)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page viii (Rev-0)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution. Electronic copies of the latest Editions of SFLC Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/SFLC/mlclant/vdiv/standard_specifications.asp
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence: In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with SFLC Standard Specification 0000, paragraph 3.2.1.1 (Order of Precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-PRF-16173, 2006, Corrosion Prevention Compound, Solvent Cutback, Cold- Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-G-24716A, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound
MIL-PRF-24647D, Feb 2005, Paint System, Anticorrosive and Antifouling, Ship Hull
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Coast Guard Surface Forces Logistics Center (SFLC), Standard Specification 0000, General Requirements, 2009 Edition
Page ix (Rev-0)
Surface Forces Logistics Center (SFLC), Standard Specification 5000, Auxiliary Machinery Systems 2009 Edition
Coast Guard Surface Forces Logistics Center (SFLC), Standard Specification 0740, Welding and Allied Processes, 2009 Edition
Coast Guard Surface Forces Logistics Center (SFLC), Standard Specification 8634, Drydocking, 2009 Edition
Coast Guard Surface Forces Logistics Center (SFLC), Standard Specification 8635, Provide Temporary Logistics, 2009 Edition
Coast Guard Commandant Instruction (COMDTINST) M9000.6(series) Oct 2004 Naval Engineering Manual, Chapter 570 General Duty and Replenishment Weight Handling systems
Coast Guard Commandant Instruction (COMDTINST) M10360.3(series) Color and Coatings Manual June 2006
Coast Guard Commandant Instruction (COMDTINST) M16500.21(series) ATON Seamanship Manual, 21 May, 1997
DRAWINGS
Coast Guard Drawing 49A BUSL 085-002, Rev A, Hull Lines and Offsets
Coast Guard Drawing 49A BUSL 085-003, Rev -, Docking Plan
Coast Guard Drawing 49A BUSL 114-004, Rev F, Skeg and Shaft Tube Arrangement and Details
Coast Guard Drawing 49A BUSL 130-002, Rev D, Main Deck Plating and Framing
Coast Guard Drawing 49A BUSL 200-002, Rev A, Machinery Arrangement
Coast Guard Drawing 49A BUSL 243-001, Rev F, Propulsion Shafting and Bearing Arrangement
Coast Guard Drawing 49A BUSL 256-001, Rev D, Propulsion and Engine Seawater and Jacket Water Cooling System
Coast Guard Drawing 49A BUSL 259-001, Rev B, Propulsion and Generator Engine Exhaust Systems Arrangement and Details
Coast Guard Drawing 49A BUSL 530-001, Rev C, Potable Water and Misc Tanks
Coast Guard Drawing 49A BUSL 551-001, Rev C, Compressed Air System
Page x (Rev-0)
Coast Guard Drawing 49A BUSL 556-002, Rev C, Diagram Buoy Handling Hydraulic System
Coast Guard Drawing 49A BUSL 556-003, Rev C, Arrgt Buoy Handling Hydraulic System
Coast Guard Drawing 49A BUSL 556-004, Rev E, Buoy Handling Hydraulic System Block and Elementary Wrg Diag
Coast Guard Drawing 49A BUSL 556-050, Rev -, Heat Exch Assembly
Coast Guard Drawing 49A BUSL 556-051, Rev -, Cross Deck Manifold
Coast Guard Drawing 49A BUSL 556-052, Rev -, 3 POS D05/W NV
Coast Guard Drawing 49A BUSL 556-053, Rev -, 2 POS D05/W NV
Coast Guard Drawing 49A BUSL 562-001, Rev C, Rudder and Steering Gear Arrangement and Details
Coast Guard Drawing 49A BUSL 573-002, Rev F, Stern A-Frame and Chainstopper Construction and Details
Coast Guard Drawing 49A BUSL 573-003, Rev C, Buoy Handling Arrangement and Details
Coast Guard Drawing 49A BUSL 573-004, Rev D, Chainstopper and Release, Fabrication, Assembly, and Installation Details
Coast Guard Drawing 49A BUSL 573-004, Rev D, Chainstopper and Release – Fabrication, Assembly, and Installation Details
Coast Guard Drawing 49A BUSL 573-005, Rev A, Stern A-Frame Construction and Details
Coast Guard Drawing 49A BUSL 601-003, Rev D, Outboard Profile and Main Deck Arrangement
Coast Guard Drawing 49A BUSL 631-001, Rev F, Paint Schedule
Coast Guard Drawing 49A BUSL 633-001, Rev B, Cathodic Protection
Coast Guard Drawing 49A BUSL 635-001, Rev D, Hull Insulation Schedule and Insulation Details
Coast Guard Drawing FL-2605-022, Rev E, Chain Stopper, 1-1/4 inch Buoy Chain
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
Page xi (Rev-0)
NAVSEA Drawing 804-5773931, Rev A, Acoustic and Thermal Insulation For Compartments Installation Details
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series) Coatings and Color Manual, Jun 2006
Coast Guard Technical Publication (TP) 3345, Manufacturer’s Instruction Books - SWBS Groups 079-259, SWBS 259, Exhaust System, Oct 2005
Coast Guard Technical Publication (TP) 3345, Manufacturer’s Instruction Book - SWBS Group(s) 079-259, SWBS 243 – Propulsion Shafting, Oct 2006
Coast Guard Technical Publication (TP) 3345, Manufacturer’s Instruction Book - SWBS Group(s) 079-259, SWBS 244 – Propulsion Shaft Bearings, Oct 2006
Coast Guard Technical Publication (TP) 3348, Amendment 4, Section A, SWBS 573, Nov 2003
Coast Guard Maintenance Procedure Card M00001.0 Replace Hoses
INDUSTRY STANDARDS
American Society of Mechanical Engineers (ASME), PTC 25, 2001, Pressure Relief Devices
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 1998, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G- 6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G- 363, Metric
Page xii (Rev-0)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2004, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel and Other Hard Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
Page xiii (Rev-0)
List of Government/industrial-furnished Property
The following is a list of property, which the Government/industrial will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
UNIT COST
2 N Freeman Marine Watertight Quick
Acting Hatch 2040-01-F07-1174 1 ea $1922.90
2 N Oval Aluminum Hatch Steel Ring 0031-2226 1 ea $100.00
4 N Duramax 49 BUSL Linerite Dunnage Kit 813000044 1 ea $1,986.00
4 N Rub rail side fender kit 802101003 2 ea $603.00
4 N Rub rail side fender kit 802100903 2 ea $661.92
4 N Stern fender kit 802100503 1 ea $65.00
4 N Bow nose fender kit 802022504C 1 ea $896.00
4 N Stern corner fender kit 802022404C 2 ea $448.00
13 N Sea Strainer Model 72 1 ea $100.00
17 N 24” X 54” Watertight Aluminum Door
LH
01-454-9363 1 ea $7714.32
17 N 24” X 60” Watertight Aluminum Door
RH
01-455-1822 1 ea $4453.00
17 N 24” X 48’ Watertight Aluminum Door
LH
01-455-1816 1 ea $3714.00
17 N 24” X 24” Watertight Aluminum Hatch 01-455-1312 1 ea $3059.70
17 N 15” X 24” Watertight Aluminum Hatch 01-455-0616 1 ea $1922.90
17 N Hatch Hold Open Assembly 01-455-0628 1 ea $1054.00
17 N Hatch Hold Open Assembly 0031-2226 1 ea $20.00
19 N WTD 24”x66” LH 01-454-9363 1 ea $1935.00
19 N WTD 24”x60” RH 01-455-1822 1 ea $1935.00
23 Y Engine, Diesel 01-450-5653 1 ea $20,220.00
26 Y Reduction Gear 01-450-5801 1 ea $50,000.00
27 N Coupling 3010-01-551-3136 2 ea $553.69
28 Y Propeller Shaft 2010-01-458-4612 1 ea $2204.92
30 N Razor Line Cutter 02500 1 ea $442.00
32 N Drive saver (orange) 7306Z 1 ea $100.00
33 N Bearing Sleeve 3120-01-366-0506 3 ea $219.16
35 Y Right Hand Propeller 2010-01-450-5807 1 ea $1642.00
35 Y Left Hand Propeller 2010-01-450-5805 1 ea $1630.00
38 N Exhaust Muffler, Kit MDE 2990-01-450-5804 1 ea $3,300.00
38 N Exhaust Muffler, Gasket 5330-01-329-4168 1 ea $125.00
43 Y Engine, Diesel Generator Set 6115-01-456-6346 1 ea $23,668.00
47 N Receptacle 5935-01-399-6806 1 ea $436.39
51 N Searchlight 6230-01-461-7591 1 ea $677.00
52 N Horn Replacement Kit 6350-01-F04-0326 1 ea $100.00
53 N Compressor P449-8 1 ea $500.00
54 N Horn 6350-01-552-8723 1 ea $100.00
64 N A/C Unit 4120-01-552-9170 1 ea $100.00
66 N 2” Ball, Flange Mount 4820-01-475-0283 3 ea $1,183.00
66 N 2” Flange 4730-00-252-3508 3 ea $49.00
76 N Air Compressor 4310-01-552-8767 1 ay $100.00
Page xiv (Rev-0)
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
UNIT COST
81 N Rudder Assembly 2040-01-471-8081 1 ay $5,292.00
81 N Lower Bearing 3120-01-465-0356 1 ea $136.41
81 N Upper Bearing 3120-01-465-0320 1 ea $129.50
81 N Rudder Bearing Seal Applied Industrial
17307H5L16 1 ea $37.83
81 N Thrust Bearing 3120-01-391-1492 1 ea $80.00
Page xv (Rev-0)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
The following is a list of work items, which contain Critical Inspection reports, which The Contractor must complete within the first 25% of the availability contract period (see SFLC Standard Specification 0000_STD, paragraph 3.11 (Reports)):
Work Item Title
5 Ultrasonic Thickness (UT) Shot Inspect
12 Remove, Inspect, and Reinstall Propeller Shafts
14 Remove, Inspect, and Reinstall Rudders
15 Buoy Handling System Maintenance (Level 2)Work
Page xvi (Rev-0)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities. All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://apps.mlca.uscg.mil/vdiv/surveys/Post_availability/
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Page xvii (Rev-0)
PC_41UTB
(07 Jan 2004)
Principal Characteristics
49 FOOT BUSL (BUOY UTILITY STERN LOADING) BOAT
Length Overall 49' 2-1/4"
Beam, maximum 16' 10"
Height of Highest Projection (above DWL) 15'
Full Load Draft 5' 6"
Full Load Displacement 71,690 lbs. (32 LT)
Shore Tie Voltage Requirements 120VAC
PROPULSION
Type Diesel Engine
Number of Units Two, Cummins, Model
6CTA8.3M1
PROPELLERS
Number of Propellers 2
Number of Blades per Propeller 4
Diameter of Propeller 31"
Pitch 22" fixed
Shaft Revolutions per Minute (RPM) 2,300 xviii
00000N_BOATS (9 July 2009)
«REC»
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability«SCOPE».
2. APPLICABLE DOCUMENTS
Coast Guard Surface Forces Logistics Center (SFLC), Standard Specification 0000_STD, 2009 Edition, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Authorized coating systems. The Contractor shall be aware that all coatings and coating systems authorized for use on Coast Guard cutters and boats are listed in COMDTINST M10360.3, Appendix C; however, the “International Interfine 979” Polysiloxane System is no longer an authorized system.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: www.uscg.mil/directives/default.asp xix
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000_STD to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this item.
xx xxi xxii xxiii xxiv xxv xxvi
10000_BBOB_0410_49 BUSL
WORK ITEM 1: Provide General Welding
1 SCOPE
1.1 Intent This work item describes the requirements for the Contractor to provide general welding.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual, (June 2006)
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General Welding The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with SFLC Standard Specification 0000 General Requirements and SFLC Standard Specification 0740 Welding and Allied Processes.
4. NOTES
This section does not apply to this work item
10000_BBOB_1010_49 BUSL
WORK ITEM 2: Lazarette QAWTH (TCTO TB6010.B)
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to Replace the Lazarette Hatch in accordance with TCTO BUSL-49 TB6010.
1.2 Government-furnished property
MTI ITEM DESCRIPTION NSN/PN QTY Estimated Cost
N Freeman Marine Watertight Quick Acting Hatch
2040-01-F07-1174 1 ea $1922.90
N Oval Aluminum Hatch Steel Ring 0031-2226 1 ea $100.00
Note:
Refer to Coast Guard Time Compliance Technical Order TCTO- BUSL-49 TB6010.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 71-50-5, Rev A, Watertight Doors and Hatches
Coast Guard Drawing 49A BUSL 71-50-6, Rev A, Watertight Doors and Hatches
Coast Guard Drawing 49A BUSL 130-002, Rev D, Main Deck Plating and Framing
Coast Guard Drawing 49A BUSL 631-001, Rev F, Paint Schedule
Coast Guard Drawing 49A BUSL 635-001, Rev D, Hull Insulation Schedule and Insulation Details
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Time Compliance Technical Order TCTO- BUSL-49 TB6010
OTHER REFERENCES
3. REQUIREMENTS
3.1 Requirements. The Contractor shall complete TCTO- BUSL-49 TB6010 – Replace the Lazarette Hatch in accordance with SFLC Std Spec 0000, SFLC Std Spec 0740, and applicable Coast Guard Drawings.
3.1.1 TCTO-BUSL-49 TB6010 is attached below:
This section is not applicable to this work item.
WORK ITEM 3: Inspect Rub Rail Fender
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect the entire rub rail system.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49 BUSL 114-003, Rev E, Chain Guard and Rub Rails
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual, (June 2006)
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Requirements The Contractor shall accomplish the following in accordance with the applicable Coast Guard Drawing.
3.2 Inspections The Contractor shall complete the following tasks:
3.2.1 Clean and visually inspect each section of rub rail, the shell plating in way of the removed rub rail sections, and each mounting fastener (stud and bonded disk, and washer) for damage including but not limited to pitting, corrosion, gouging, fading, cracks, deformation, coating system (if applicable), etc.
3.2.2 Reporting The Contractor shall submit a CFR.
Related work item: Remove and Install Rub Rail Fender.
11020_BBOB_1010_49 BUSL
WORK ITEM 4: Remove and Install Rub Rail Fender
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to remove and install the entire rub rail or sections as designated by the Coast Guard Inspector.
1.2 Government-furnished property
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATE
D COST
($/UNIT)
N Duramax 49 BUSL Linerite Dunnage Kit P/N: 813000044 1 ea. 1,986.00
N Rub rail side fender kit P/N: 802101003 2 ea. 603.00
N Rub rail side Fender kit P/N: 802100903 2 ea. 661.92
N Rub rail side fender kit P/N: 802100803 2 ea. 659.99
N Stern Fender kit P/N: 802100503 1 ea. 65.00
N Bow nose fender kit P/N: 802022504C 1 ea. 896.00
N Stern corner fender kit P/N: 802022404C 2 ea. 448.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 114-003, Rev E, Chain Guard and Rub Rails
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Requirements The Contractor shall accomplish the following in accordance with the applicable Coast Guard Drawing:
3.1.1 Remove each rub rail section, taking care to avoid damaging them during removal.
3.2 Installation The Contractor shall install each rub rail section using applicable Coast Guard Drawing.
3.3 Government reserves the right to provide new rub rail sections. If the Government exercises this right, the Contractor shall dispose of the old section(s) in accordance with all applicable Federal, state, and local regulations.
3.4 Mounting hardware (stud) renewal. If a Change Request has been authorized and released, the Contractor shall install new Government furnished mounting hardware at designated locations, consisting of a stud and a bonded disk, in accordance with SFLC Standard Spec 0740.
3.5 Government reserves the right to provide new mounting hardware and or sections of rubber bumper. If the Government exercises this right, the Contractor shall dispose of the old hardware and or sections of rubber bumper as directed by the COTR.
Related work item: Inspect Rub Rail Fender.
10000_ BBOB_1010 _49 BUSL
WORK ITEM 5: Perform 100 Ultrasonic Testing (UT) Shots
1 SCOPE
1.1 Intent This work item describes the requirements for the Contractor to take 100 UT shots at locations designated by the Coast Guard Inspector.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
3. REQUIREMENTS
3.1 Ultrasonic thickness measurement. The Contractor shall perform a total of 100 thickness measurements, in locations designated by the Coast Guard Inspector.
3.1.1 Submit a CFR. The ultrasonic apparatus, procedure requirements, and report shall be in accordance with ASTM E797. The report results shall include, the following for each test point:
Location.
Original metal thickness.
Measured metal thickness.
Percent deterioration (calculation is based on the original metal thickness).
11020_ BBOB_1010 _49 BUSL
WORK ITEM 6: Inspect Bilges
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect the vessel’s bilge system.
SPACES
Berthing Area
Workshop/Galley
Machinery Space
Lazarette
1.2 Government-furnished property
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 529-1 Rev D, Bilge System
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Interferences The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
Deck Gratings.
Deck Plates.
Piping.
Any fixed equipment.
3.2 Inspections The Contractor shall accomplish the following inspections in accordance with applicable Coast Guard Drawing Std Spec 0000, Std Spec 0740.
3.3 Reporting The Contractor shall submit a CFR.
Related Work Item: Preserve Bilge System.
11000_ BBOB_1010 _49 BUSL
WORK ITEM 7: Preserve Bilges
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to preserve the vessel’s bilge system.
SPACES
Berthing Area
Workshop/Galley
Machinery Space
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 529-1 Rev D, Bilge System
49A BUSL 631-001 Rev F, Painting Schedule
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Coatings and Color
Manual (9 June 2006)
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Interferences The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences):
Deck Gratings.
Deck Plates.
Piping.
3.2 Inspections The Contractor shall accomplish the following preservation in accordance with applicable Coast Guard M10360.3C, Drawing Std Spec 0000, 49A BUSL 631-001 Rev F, Painting Schedule.
Related Work Item: Inspect Bilge System.
12311_ BBOB_1010 _49 BUSL
WORK ITEM 8: Clean and Inspect Diesel Fuel Tank
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to clean and inspect the following tank:
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A-BUSL 200-2 Rev A, Machinery Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Coast Guard Technical Publication TP 3345-79-A Structural Load Prediction.
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General The Contractor shall clean and inspect the diesel fuel tank in accordance with applicable Coast Guard Drawing and TP 3345-79-A Structural Load Prediction.
3.2 Tank content removal The Contractor shall remove and dispose of up to a total of 300 gallons of diesel fuel per tank.
NOTICE!
Vessel may come in with less tank fluid contents than specified above.
3.3 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior
TYPE OF TANK LOCATION
95% CAPACITY
(GALLONS)
Diesel Fuel Bulkhead 5 P/S 391.5 surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.4 Tank content and waste disposal. The Contractor shall dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.5 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.
3.6 Reporting The Contractor shall submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
Sounding tube and striker plate condition.
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.6.1 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
4. NOTES
4.1 Operational Test - In accordance with SFLC Std Spec 0000, paragraph 3.3.5.1
4.2 Related work item: Renew Diesel Fuel
12320_ BBOB_1010_49BUSL
WORK ITEM 9: Pressure Test Inaccessible Void
1 SCOPE
1.1 Intent This work item describes the requirements for the Contractor to pressure test an inaccessible void as directed by the COTR.
SPACE/COMPARTMENT
Skeg (P/S)
Rudder (P/S)
Prop/Rudder Guard
Splash Rail
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49 BUSL 92-1, Rev C, Compartment Test Schedule
Coast Guard Drawing 49A BUSL 601-4, Rev A, Inboard Profile/Dk Arrag
Coast Guard Drawing 49A BUSL 114-3, Rev F, Chain Guard/Rub Rails
Coast Guard Drawing 49A BUSL 111-1, Rev E, Shell Expansion and Longitudinal Framing
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
3.1 Air test voids. The Contractor shall use air and soap-water solution to test all welds and plugs on the inaccessible voids listed in the table above.
3.1.1 Hold a pressure of 2 psig for 10 minutes with no allowable leakage in accordance with SFLC Std Spec 0740 (Appendix C) and applicable Coast Guard Drawings.
3.2 Reporting The Contractor shall submit a CFR.
12300_ BBOB_1010_49 BUSL
WORK ITEM 10: Inspect Accessible Spaces
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect accessible spaces.
SPACES
Forepeake
Berthing Area
Workshop/Galley
Machinery Space
Pilothouse
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49 BUSL 103-3, Rev A, Inboard Profile and Arrangement
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant’s Instruction Manual M9000.6E, Naval Engineering Manual, Chapter 074 and 079, October 2004
3.1 General. The Contractor shall inspect accessible spaces in accordance with the applicable Coast Guard drawing, TP 2502A-86, M9000.6E and Standard Specifications.
3.1.1 The contractor shall inspect for, but not limited to, the following:
Corrosion
Failed paint
Cracks, holes or anything that could compromise watertight integrity
Broken or missing fixtures (i.e. hold-back hooks, door stops, dogging handles, etc)
Non-tight cableways or pipe penetrations
Anything that may adversely affect the overall material condition of the boat
3.2 Reporting The Contractor shall submit a CFR.
4. NOTES
Related work item: Inspect Watertight Closures, Inspect Insulation, Remove and Renew Insulation.
12300_ BBOB_1010_49 BUSL
WORK ITEM 11: Inspect Accessible Voids
1 SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect the accessible voids.
SPACE/COMPARTMENT
Forward Void
After Voids (P/S)
2. REFERENCES
COAST GUARD DRAWINGS
49A BUSL 601-2 Rev B, Inboard Profile and Deck Arrangement
49A BUSL 631-001 Rev F, Painting Schedule
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General The Contractor shall inspect the accessible void in accordance with applicable Coast Guard Drawings and Std Spec 0000.
3.2 Reporting The Contractor shall submit a CFR.
4.1 Related Work Item: Preserve accessible void.
16300_ BBOB_1010_49 BUSL
WORK ITEM 12: Inspect Sea Strainer
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect the sea strainers.
ITEM DESCRIPTION NSN/PN QTY
Sea Strainer Model 72 1
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 256-1 Rev D, Prop and Gen Engine Sea Water and Jacket Water Cooling Sys
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Inspection The contractor shall inspect the sea strainer in accordance with applicable Coast Guard Drawings, and Std Spec 0740.
3.1.1 The Contractor shall inspect for, but not limited to the following:
Excessive corrosion
Broken or missing actuating handle
Any blockage to flow
Broken or missing mounting bolts
Unable to shift strainers
3.2 Reporting The Contractor shall submit a CFR.
4. NOTES:
Related work item: Remove and Install Sea Strainer.
16300_BBOB_1010_49 BUSL
WORK ITEM 13: Remove and Install Sea Strainer
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to remove and install a sea strainer.
1.2 Government-furnished property
ITEM DESCRIPTION NSN/PN QTY UNIT OF
ISSUE
ESTIMATED
UNIT COST
Sea Strainer Model 72 1 EA
Coast Guard Drawing 49A BUSL 256-1 Rev D, Prop and Gen Engine Sea Water and Jacket Water Cooling Sys
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
Coast Guard Commandant’s Instruction Manual M9000.6E, Naval Engineering Manual, Chapter 074 and 079, October 2004
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Removal The contractor shall remove the sea strainer in accordance with the applicable Coast Guard drawing.
3.2 Government-furnished property The government reserves the right to provide materials, property, and items when a benefit to the US Coast Guard can be obtained.
3.3 Installation. The contractor shall install the sea strainer, with new gaskets and hardware, in accordance with the applicable Coast Guard drawing.
Related work item: Inspect Sea Strainer.
16300_ BBOB_1010_49 BUSL
WORK ITEM 14: Inspect Sea Chest
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect a sea chest.
1.2 Government furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 256-1 Rev D, Prop and Gen Engine Sea Water and Jacket Water Cooling Sys
Coast Guard Drawing 49 BUSL 256-1 Rev B, Engine Sea Water and Jacket Water
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Inspection The contractor shall inspect the sea chest in accordance with applicable Coast Guard Drawings, and Std Spec 0740.
3.1.1 The Contractor shall inspect for, but not limited to the following:
Excessive corrosion
Any blockage to flow
Broken or missing mounting bolts
Cracks
3.2 Reporting The Contractor shall submit a CFR.
Related work items: Remove and Install Sea Chest, Inspect Underwater Body.
16300_BBOB_1010_49 BUSL
WORK ITEM 15: Remove and Install Sea Chest
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to remove and install a sea chest.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 256-1 Rev D, Prop and Gen Engine Sea Water and Jacket Water Cooling Sys
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Removal The contractor shall remove the sea chest in accordance with the applicable Coast Guard drawings and Std Spec 0740...
3.2 Installation The contractor shall install the sea chest in accordance with the applicable Coast Guard drawings and Std Spec 0740.
Related work item: Inspect Sea Chest, Inspect Underwater Body
16700_BBOB_1010_49BUSL
WORK ITEM 16: Inspect Watertight Closures
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect watertight closures as directed by COTR:
24” X 54” Watertight Aluminum Door LH 2040-01-454-9363
24” X 60” Watertight Aluminum Door RH 2040-01-455-1822
24” X 48’ Watertight Aluminum Door LH 2040-01-455-1816
24” X 24” Watertight Aluminum Hatch 2040-01-455-1312
24” Opening Watertight Aluminum Hatch 2040-01-455-0616
15” X 24” Watertight Aluminum Hatch 2040-01-455-0628
Hatch Hold Open Assembly P/N 0031-2226
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49 BUSL 071-050 Rev A and B, Sheets 3-7 Water Tight Doors and Hatches
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual (9 June 2006)
Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series), Naval Engineering Manual (21 Oct 2004)
Naval Ships Technical Manual (NSTM) Chapter 079-50.2.15 Watertight or Airtight Fittings (20 Oct 2006)
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Interferences - In accordance with SFLC Std Spec 0000, paragraph 3.3.5
3.2 Inspect. The Contractor shall inspect watertight closures in accordance with Coast Guard COMDTINST M9000.6, NSTM Chapter 079-50.2.15, SFLC Std Spec 0740, and applicable Coast Guard Coast drawings.
3.3 Reporting The Contractor shall submit a CFR.
Related work item. Remove and Install Watertight Closure
WORK ITEM 17: Remove and Install Watertight Closures
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to remove and install a watertight enclosure as directed by COTR.
1.2 Government-furnished property
MTI ITEM
DESCRIPTION
NSN QTY UNIT
OF
ISSUE
ESTIMATED
UNIT COST
N 24” X 54” Watertight Aluminum Door LH
014549363 1 Ea $7,714.32
N 24” X 60” Watertight Aluminum Door
RH
014551822 1 Ea $4,453.00
N 24” X 48’ Watertight Aluminum Door LH
014551816 1 Ea $3,714.00
N 24” X 24” Watertight Aluminum Hatch
014551312 1 Ea $3,059.70
N 15” X 24” Watertight Aluminum Hatch
014550616 1 Ea $1,922.90
N Hatch Hold Open Assembly
014550628 1 Ea $1,054.00
N Hatch Hold Open Assembly
P/N 0031-
$0.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 051-050 Rev A, Water Tight Doors and Hatches
Coast Guard Drawing 49A BUSL 071-050 Rev A, Sheets 2-7 Water Tight Doors and Hatches
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Interferences The Contractor shall remove and replace interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5, which defines interferences.
3.2 Removal. The Contractor shall remove the watertight closure using applicable Coast Guard drawings for guidance.
3.3 Government-furnished property The government reserves the right to provide materials, property, and items when a benefit to the US Coast Guard can be obtained.
3.4 Installation. The Contractor shall install watertight closure in accordance with SFLC Std Spec 0740, 0000 and applicable Coast Guard Coast drawings.
Note:
Do not use components containing carbon steel materials to clean or polish the aluminum surfaces.
3.4.1 Chalk test. The Contractor shall perform a chalk test of all affected gasket surfaces in accordance with SFLC Std Spec 0740.
Related work item. Inspect Watertight Closure, Preserve Superstructure.
WORK ITEM 18: Inspect Weather-tight Closures
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect weather-tight closures.
24” X 66” Weather-tight Aluminum Door LH 2040-01-454-8229
24” X 60” Weather-tight Aluminum Door RH 2040-01-455-1296
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 051-050 Rev A, Water Tight Doors and Hatches
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual (9 June 2006)
Coast Guard Commandant Instruction (COMDTINST) M9000.6 (series), Naval Engineering Manual (21 Oct 2004)
Naval Ships Technical Manual (NSTM) Chapter 079-50.2.15 Watertight or Airtight Fittings (20 Oct 2006)
3.1 Interferences - In accordance with SFLC Std Spec 0000, paragraph 3.3.5
3.2 Inspect The Contractor shall inspect weather-tight closures in accordance with Coast Guard COMDTINST M9000.6, NSTM Chapter 079-50.2.15, SFLC Std Spec 0740, 0000 and applicable Coast Guard Coast drawings.
3.3 Contractor shall. Submit a CFR.
Related work items. Remove and Install Weather-tight Closures, Preserve Superstructure.
WORK ITEM 19: Remove and Install Weather-tight Closures
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to remove and install a weather-tight closure as directed by COTR.
1.2 Government-furnished property
MTU ITEM
DESCRIPTION
NSN QTY UNIT
OF
ISSUE
ESTIMATED
UNIT COST
N 24” X 66” Weather-tight Aluminum Door
LH
014549363 1 Ea $1,935.00
N 24” X 60” Watertight Aluminum Door
RH
014551822 1 Ea $1,935.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A BUSL 051-050 Rev A, Water Tight Doors and Hatches
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and allied processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Interferences The Contractor shall remove and replace interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5, which defines interferences.
3.2 Removal The Contractor shall remove the weather-tight closure using applicable Coast Guard drawings for guidance.
3.3 Government-furnished property The government reserves the right to provide materials, property, and items when a benefit to the US Coast Guard can be obtained.
3.4 Installation. The Contractor shall install weather-tight closure in accordance with SFLC Std Spec 0740, and applicable Coast Guard Coast drawings.
Note:
Do not use components containing carbon steel materials to clean or polish the aluminum surfaces.
3.5 Chalk test The Contractor shall perform a chalk test of all affected gasket surfaces in accordance with SFLC Std Spec 0740, 0000.
Related work item Inspect Weather-tight Closure, Preserve Superstructure
17100_BB_1010_49BUSL
WORK ITEM 20: Inspect Mast
1. SCOPE
1.1 Intent This work item describes the requirements for the Contractor to inspect the Mast to include the foundation.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A-BUSL 171-002 Rev D, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002 Rev C, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002-3- Rev C, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002-4-Rev D, Mast Construction Detail
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Inspection The Contractor shall inspect the mast in accordance with the applicable Coast Guard drawing and Std Specs.
3.1.1 The inspection shall include the condition of the braided wire grounding straps.
3.2 Reporting The Contractor shall submit a CFR.
Related work item: Preserve Superstructure
23310_BB_1010_49BUSL
WORK ITEM 21: Remove and Install Mast
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove and install Mast.
1.2 Government-furnished property
None
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 49A-BUSL 171-002 Rev D, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002 Rev C, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002-3- Rev C, Mast Construction Detail
Coast Guard Drawing 49A-BUSL 171-002-4-Rev D, Mast Construction Detail
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 series, June 2006,…