amendment 2 redacted page 2.doc
DOC document 58 KB Posted
- Attached to
- Tower Crane Feasibility Study Federal contract opportunity
- Solicitation number
- HSCG40-08-R-40046
About this file
Amendment 2 redacted page 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mod 4 for proposal due date.pdf | ||
| Mod 3 for site visit.pdf | ||
| SF30 Amendment 2.pdf | ||
| SF30.pdf | ||
| 1449 Crane Solicitation.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment
HSCG40-08-R-40046 0002
Dated 8/1/08
Redacted page to solicitation
ADDENDUM TO BLOCKS 19
CLIN
| Description |
| Quantity |
| Unit Price |
| Total Price |
Conduct a feasibility study and develop report on tower crane one in accordance with the statement of work, requirement line #2.
1 ea
| $_______ |
| $_______ |
| 0002 |
| Conduct a feasibility study and develop report on tower crane two in accordance with the statement of work, requirement line #3. |
| 1 ea |
| $_______ |
| $_______ |
| 0003 |
| Conduct a feasibility study and develop report on tower crane three in accordance with the statement of work, requirement line #4. |
| 1 ea |
| $_______ |
| $_______ |
| 0004 |
| Conduct a feasibility study and develop report on tower crane four in accordance with the statement of work, requirement line #4. |
| 1 ea |
| $_______ |
| $_______ |
| 0005 |
| Conduct a feasibility study and develop report on tower crane five in accordance with the statement of work, requirement line #4. |
| 1 ea |
| $_______ |
| $_______ |
| 0006 |
| Conduct a study and provide a report of anticipated fuel consumption of the new tier three engines as compared to the engines in their current state in accordance with the statement of work, requirement line #5. |
| 1 ea |
| $_______ |
| $_______ |
| 0007 |
| Provide specifications for each of the five cranes to be used in a solicitation as requested in requirement line #6. |
| 5 ea |
| $_______ |
| $_______ |
| 0008 |
| Provide a report that addresses the feasibility of converting the portal cranes from a diesel electric configuration to a hard wired electrical configuration in accordance with the statement of work, requirement line #7. |
| 1 ea |
| $_______ |
| $_______ |
| 0009 |
| Executive Summary report as described in requirement line #8 of the statement of work. |
| 1 ea |
| $_______ |
| $_______ |
| 0010 |
| Option 1 - Develop a commercial grade specification for each of the portal cranes as described under “Optional” section of the statement of work. |
| 1 Lot |
| $_______ |
| $_______ |
IMPORTANT NOTICE TO OFFERORS:
1. All questions regarding this solicitation should be submitted in writing to Stefanie Schmitz at email address: Stefanie.W.Schmitz@uscg.mil.
2. Proposals may be emailed to: Stefanie.W.Schmitz@ucg.mil or mailed to: USCG ELC, 2401 Hawkins Point Road, Baltimore, MD 21226, Building 58,
3. The contractor must identify in their proposal the labor category (by title and number) contained in the Department of Labor Wage Determination(s) that they deem appropriate for the scope of work required herein. If more than one labor category is required to meet all of the specification requirements, please identify all appropriate labor categories, and delineate the portions of the performance work statement under which each category will provide support. The applicable Wage Determinations are provided as Attachment C.
File details come from the government source that posted it. Updated .