HSCG38-11-Q-800007- Technical Criteria.xls
XLS spreadsheet 35 KB Posted
- Attached to
- Engine Test Cell Pump Replacement
- Solicitation number
- HSCG38-11-Q-800007
About this file
Technical Criteria
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSCG38-11-Q-800007_Quote_Sheet - Copy.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HSCG38-11-Q-800007 - Technical Criteria | |||
| Company Name: Cage Code: | |||
| POC: Email/Phone: | |||
| Design Specifications: | Does your Company Meet or Exceed the Specification? Please indicate "Meets" or "Exceeds" in the area below | For an "Exceeds", please provide an explanation in the respective areas | |
| 12.1 | Dynamomether Cooling Pumps (QTY 2) Installation: Contractor shall provide all equipment, materials, labor and supervision to replace existing pumps. New pumps shall meet below specifications. | ||
| 12.1.2 | Pump shall be 3 stage cast iron bronze fitted vertical turbine pump with 4” flanged 125# discharge head. Basis of pump specification is Gould’s Vertical Turbine Pump Model VIT – Size 4x10WALC with salient characteristics below. | ||
| 12.1.3 | Pump shaft shall be 416 stainless steel. Pump column shall include galvanized or stainless suction strainer. Approximate length of column including suction strainer is 72” to match existing. | ||
| 12.1.4 | Sole plate of pump shall adapt to current foundation mounting configuration. | ||
| 12.1.5 | 15 hp, 1800 rpm, high thrust, premium efficiency motor shall be provided with pump | ||
| 12.1.6 | Pump shall be rated to provide 300 gpm @ 144’ TDH @ 1770 rpm. | ||
| 12.1.7 | Pump output shall be a minimum of 60 psi | ||
| 12.2 | Water Tower Circulating Pump (qty 1) Installation: Contractor shall provide all equipment, materials, labor and supervision to replace existing pumps. New pumps shall meet below specifications. | ||
| 12.2.1 | Pump shall be single stage cast iron bronze fitted vertical turbine pump with 4” 150# flanged discharge head. Basis of pump specification is Gould’s Vertical Turbine Pump Model VIT-CATM-MS with salient characteristics below. | ||
| 12.2.2 | Pump shaft shall be 416 stainless steel. Pump column shall include galvanized or stainless suction strainer. Approximate length of column including suction strainer is 72” to match existing. | ||
| 12.2.3 | Sole plate of pump shall adapt to current foundation mounting configuration. | ||
| 12.2.4 | Premium efficiency motor shall be provided to replace existing motor. Existing motor is 3 hp, 1735 rpm, 460V/60hz/3 ph. | ||
| 12.2.5 | Pump shall be rated to provide 300 gpm @ 23.9’ TDH @ 1760 rpm. | ||
| 12.3 | Floor Wash Pump (QTY 1) Installation: Contractor shall provide all equipment, materials, labor and supervision to replace existing pumps. New pumps shall meet below specifications. | ||
| 12.3.1 | Pump shall be 3 stage cast iron bronze fitted vertical turbine pump with 4” 150# flanged discharge head. | ||
| 12.3.2 | Pump shaft shall be 416 stainless steel. Pump column shall include galvanized or stainless suction strainer. Approximate length of column including suction strainer is 72” to match existing. | ||
| 12.3.3 | Sole plate of pump shall adapt to current foundation mounting configuration. | ||
| 12.3.4 | Premium efficiency motor shall be provided to replace existing motor. Existing motor is 7.5 hp, 3480 rpm, 460V/60hz/3 ph. | ||
| 12.3.5 | Pump shall be rated to provide 175 gpm @ 125’ TDH @ 3,500 rpm. | ||
| 12.4 | Piping reconfiguration: | ||
| The Contractor shall be responsible for any piping reconfiguration necessary for connection of new pumps as well as all electrical connections. | |||
| 12.5 | Testing: | ||
| The Contractor shall perform all start up and testing of the new pumps IAW manufacturer’s recommendations. This shall include providing proper training to USCG maintenance personnel. | |||
| 13.1 | Execution: | ||
| 13.1.1 | Installation, workmanship, fabrication, assembly, erection, examination, inspection and testing shall be in accordance with appropriate sections of 29 CFR 1910, 1926. | ||
| 13.1.2 | As a minimum, installation shall be in accordance with NFPA 70, and all applicable State and Local codes. |