SOW_PCZ194.pdf

PDF 113 KB Posted

Attached to
Tree Removal
Solicitation number
HSCG31-14-Q-PCZ194
Issued by

About this file

download attachment 2

View the file

Other files

File Type Posted
SOW_PCZ194.pdf PDF
RFI_Form_PCZ194.pdf PDF
Tree_List_PCZ194.pdf PDF
FAR_and_HSAM_Clauses_-_PCZ194.pdf PDF
Service_Wage_Determination_PCZ194.pdf PDF
Combined_Synopsis_PCZ194.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

TREE WORK

COAST GUARD, NOVATO HOUSING

1. Scope

The intent of this Statement of Work (SOW) is to have the Contractor provide labor, materials, equipment and supervision necessary to crown clean, Install and check cable systems, reduce end weight, remove ivy, Palm prune, remove trees and clear from electric lines, approximately 50 trees of various species at Novato housing complex. 227 south Oakwood Drive Novato CA. 94949

2. Security Requirements

Vehicles must have valid registration and insurance. All vehicle operators must a have valid driver license.

3. Technical Point of Contact Designation

The POCs for this task is:

Jeff Whichard or current COR, U.S. Coast Guard

Office (415)-382-4240/Email: jeffrey.w.whichard@uscg.mil , and

MST1 Brandon Hedgepeth at Office (415) 382-4240/Email:

Brandon.J.Hedgepeth@uscg.mil.

4. Description of Work

4.1 The contractor shall crown clean, Install and check cable system, reduce end weight, remove ivy, Palm prune, remove trees and clear from electric lines, approximately 50 trees. To include but not necessarily limited to the following tasks.

4.2 The contractor shall remove all wood and debris from the site. Removing all wood chips and raking the surrounding area of any excess wood/debris.

4.3 The contractor shall clean up all areas to ensure they are clear of debris on a daily basis. At completion of the project all construction areas will be returned to original condition.

4.4 All work is to be performed between the hours of 8:00am and 5:00pm and conducted in accordance with generally accepted industry standards of the

American National Standards Institute (ANSI) A300 Standards for Tree Care

Operations. In addition, ANSI Z133.1 Standards and Safety Requirements for

Arboriculture Operations are to be explicitly followed. ANSI A300 standards unify and take authoritative precedence over all previously existing tree care industry standards and guidelines. For all intense purposes the term “Hazard mailto:jeffrey.w.whichard@uscg.mil

Prune” shall include the shaping back of all the long limbs to reduce the end weight, and the removal of any dead limbs.

5. Coast Guard Furnished Information

5.1 Attachment (1) listing of trees to include ID (tag number), common name, Diameter at breast height 4.5 above grade (DBH), approximate canopy size, comments and action to be taken.

6. Coast Guard Furnished Material

6.1 None

7. Coast Guard Furnished Equipment

7.1 None

8. Travel Requirements

8.1 All costs associated with travel to complete this task are included within the

Contractor’s proposal.

9. Transportation of Equipment/Material

9.1 All costs associated with transportation of equipment/materials are included within the Contractor’s proposal.

10. Data Deliverables

The contractor shall complete the project 60 days after receipt of the task order from the Contract Officer.

11. Acceptance Plan

Completion of work under this contract will be monitored and accepted by Coast

Guard Technical POC Jeff Whichard or current COR.