Questions_and_Answers_for_HSCG23-13-Q-PFP239.doc
DOC document 35 KB Posted
- Solicitation number
- HSCG23-13-Q-PFP239
About this file
Responses to questions received
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF18-PFP239.pdf | ||
| HSCG23-13-Q-PFP239_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. The scope mentions lighting replacement, but several areas shown have no existing lighting.
A. The Lighting Study and SOW provided indicates the lighting coverage desired by the Government. Proposals should include all labor and material required to meet the needs of the Government IAW with the SOW and the Lighting Study. Existing locations shall be utilized where practicable; inclusion of additional fixtures/poles is acceptable in order to meet lighting requirements established by the lighting survey and SOW.
File details come from the government source that posted it. Updated .