Summary of changes of Amendment 2. Summary includes Question and Answers (Q A). The proposal submittal due date is extended to 9/13/10 3 00 pm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Atch 6.6 | — | |
| Atch 3_Price Proposal Schedule | — | |
| Atch 3_Price Proposal Schedule | — | |
| SF 1449_RFP Pgs 1 - 6.pdf | ||
| PWS Atch 6.1 Load Plan.xls | XLS spreadsheet | |
| Atch 3_Price Proposal Schedule | — | |
| PWS Atch 6.2 Repr Equip List.pdf | ||
| Atch 1_PWS Tailoring | — | |
| PWS Atch 6.3 Insig Badg Location.pdf | ||
| RFP Pages 7- 53.doc | DOC document | |
| Atch 2_WD 05-2345 | — | |
| PWS Atch 6.3 Sea Bag Items.pdf | ||
| PWS Atch 6.6 | — | |
| PWS Atch 6.5 Issue Proc.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for Solicitation HSCG23-10-R-PUD703 Cape May Tailoring. And Summary of Solicitation Amendment 02 dated 9/8/2010
Questions and Answers (Q&A):
1. Q. Will the billing price per recruit be based on incoming recruits (who get ODU’s with name tapes) or recruits that remain for dress uniforms? Answer: The line item pricing for accession personnel is based on first week company quantity (when ODU uniforms are issued and receive name tapes).
2. Q. Is it acceptable to submit our proposal electronically in .pdf format? The pricing sheets will still be submitted in Excel format. Answer: The pdf format will be allowed so Section L is amended to include pdf format.
3. Q. What,s the current contract price? Answer: The annual ceiling price on the IDIQ contract was $420,000 annually for 5 years but never reached the annual ceiling amount.
4. Q. And how many people work in the store right now? Answer: No response. The incumbent’s manpower solution is private information.
5. Q. I have one question concerning the solicitation do the ODU Coats also get pressed after the Nametapes are sewn on them or not? The solicitation only says seams and hems so I just wanted clarification on that point. Answer: No, the ODU Coats are not pressed.
6. Q. Why is there no task for All Weather Coats? Answer: All weather coats are not covered under this solicitation. TRACEN will buy this service separately.
7. Q. The Accession Personnel Loading Plan totals 4045 (A/D and R) and 255 DEPOT, or a total of 4,300 personnel. However the Tasks Structure and Quantity reflects a total of 4,815 personnel. The PWS says 3,400. Answer: The 4300 is the current load plan but we left room for growth to 4,815. The PWS says 3,400 in the background of summary page and this will be corrected to 4,255 for the estimated annual class size.
Amendment 02 Summary – Changes
1. Atch 3 and PWS Atch 6.6, Change: CLIN 0X001, “Measuring and Sizing ODU Uniforms” in the schedule is corrected to include Service Dress (SD) Uniforms so will now read “Measuring and Sizing for ODU and SD Uniforms”.
2. Atch 3 and PWS Atch 6.6, Change: CLIN 0X004 and CLIN 0X005 (Collar Shortened and Extra Added to Sleeve) – Estimated annual quantity increased from 35 to 480 for each CLIN item.
3. PWS Atch 6.6, Change: Tasks – Trousers, SD – Hem for (M) and (W) – Each recruit gets 2 pairs of pants and every single pair needs to be hemmed. Thus the estimated annual quantities for these tasks are 6,830 for men (under CLIN item 2) and 2,800 for women (under CLIN item 3).
4. PWS Atch 6.6, Change: Tasks – Trousers, SD – Waist and Seat for (M) – Waists are normally altered with the seat. The quantities for these two tasks should therefore be equal. The seat quantity for men is changed to 1,395 (under CLIN item 2).
5. PWS Atch 6.6, Change: Tasks – Coat, SD – Attach Shield/Rate Marks for (M) and (W) – every single coat gets a rate. The Attach Shield/Rate Marks quantity for men is changed to 3,415 (under CLIN item 2) and 1,400 for women (under CLIN item 3).
6. PWS Atch 6.6, Change: Tasks – Coat, SD – Attach Shield/Rate Badge for (M) and (W). The Attach Shield/ Rate Badge quantity for men is changed to 200 (under CLIN item 2) and 85 for women (under CLIN item 3).
7. PWS Paragraph 1.2 Background, Change: The annual Accession Personnel estimate is changed from 3,400 to 4,255.
8. PWS Paragraph 5.1.9 Task Structure and Quantity, Change: The description of CLIN Item 00001 is amended to include Service Dress Uniforms “Measuring and Sizing for ODU and SD Uniforms”.
9. Section L.2 Instructions to Offerors for Submittal of Proposals, Change: Pdf. document format is allowable for submittal of proposals.
10. The proposal submittal due date is extended from 9/10/10 to 9/13/10, 3:00PM EST.